Attachment 4 - PNQS 25-1844 Repair Maxwell Traffic Lights - 3052.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- FA330025R0037
About this file
This is a blank construction cost estimate breakdown template for traffic light repair work at Maxwell Air Force Base. The template is structured to capture detailed pricing for PNQS 25-1844 traffic signal repairs, with all dollar amounts currently showing $0.00 as placeholders for contractor completion.
The template includes specific line items for traffic signal components including removal of existing signals, traffic poles, detection loop removal and repair, traffic controller unit installation, various LED traffic signal lights (3-section and 5-section yellow, pedestrian signals), push buttons, LED luminaires, 8-phase controllers, and intersection detectors. The pricing structure incorporates material costs with 10% tax, labor costs with 10% insurance and tax, overhead at 10%, profit at 10%, and bonds at 2.5%. The work location is specified as Maxwell AFB with facility number 2036, and the template follows OMB form 0704-0193 requirements for federal construction cost estimates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maxwell CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| IGE | Maxwell Air Force Base Alabama | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR TRAFFIC SIGNALS, MAXWELL | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| PNQS 25-1844 | FAC# 2036 MAXWELL AFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| Division 1 (General Requirements) | $0.00 | $0.00 | $0.00 | |||||||
| 1.0 | Administrative | Unit | $0.00 | $0.00 | $0.00 | |||||
| 2.0 | Outages and Permits | Unit | $0.00 | $0.00 | $0.00 | |||||
| Division 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||||||
| 3.0 | Removal Of Exisiting Signals | Unit | $0.00 | $0.00 | $0.00 | |||||
| 4.0 | Traffic Pole | Unit | $0.00 | $0.00 | $0.00 | |||||
| Division 3 (Concrete) | $0.00 | $0.00 | $0.00 | |||||||
| 5.0 | Removal Of Detection Loops and Repair | Unit | $0.00 | $0.00 | $0.00 | |||||
| Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | |||||||
| 6.0 | Traffic Controller Unit Installation | Unit | $0.00 | $0.00 | $0.00 | |||||
| 7.0 | 3-Section Yellow LED Traffic Signal Light | Unit | $0.00 | $0.00 | $0.00 | |||||
| 8.0 | 5-Section Yellow LED Traffic Signal Light | Unit | $0.00 | $0.00 | $0.00 | |||||
| 9.0 | Pedestrian LED Traffic Light Signal | Unit | $0.00 | $0.00 | $0.00 | |||||
| 10.0 | Pedestrian Push Buttons | Unit | $0.00 | $0.00 | $0.00 | |||||
| 11.0 | LED Luminares Traffic Light Signal | Unit | $0.00 | $0.00 | $0.00 | |||||
| 12.0 | 8-Phase Controller | Unit | $0.00 | $0.00 | $0.00 | |||||
| 13.0 | Install Intersection Detectors | Unit | $0.00 | $0.00 | $0.00 | |||||
| 15.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 16.0 | Material Costs | $0.00 | $0.00 | |||||||
| 17.0 | Tax on Materials | 10% | $0.00 | $0.00 | ||||||
| 18.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 19.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 20.0 | Insurance & Tax on Labor | 10% | $0.00 | $0.00 | ||||||
| 21.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 22.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 23.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 24.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 |
| 25.0 | Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| 26.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27.0 | Profit | 10% | $0.00 | $0.00 | $0.00 | |
| 28.0 | Bonds | 2.5% | $0.00 | $0.00 | $0.00 | |
| 29.0 | TOTAL | $0.00 | $0.00 | $0.00 |
Signature: ______________________________________