Attachment 4 - PNQS 25-1844 Repair Maxwell Traffic Lights - 3052.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
PNQS 25-1844 Repair Maxwell Traffic Lights Solicitation (Amendment 0001)
Solicitation number
FA330025R0037
Issued by

About this file

This is a blank construction cost estimate breakdown template for traffic light repair work at Maxwell Air Force Base. The template is structured to capture detailed pricing for PNQS 25-1844 traffic signal repairs, with all dollar amounts currently showing $0.00 as placeholders for contractor completion.

The template includes specific line items for traffic signal components including removal of existing signals, traffic poles, detection loop removal and repair, traffic controller unit installation, various LED traffic signal lights (3-section and 5-section yellow, pedestrian signals), push buttons, LED luminaires, 8-phase controllers, and intersection detectors. The pricing structure incorporates material costs with 10% tax, labor costs with 10% insurance and tax, overhead at 10%, profit at 10%, and bonds at 2.5%. The work location is specified as Maxwell AFB with facility number 2036, and the template follows OMB form 0704-0193 requirements for federal construction cost estimates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maxwell CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
IGEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR TRAFFIC SIGNALS, MAXWELL$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 25-1844FAC# 2036 MAXWELL AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
Division 1 (General Requirements)$0.00$0.00$0.00
1.0AdministrativeUnit$0.00$0.00$0.00
2.0Outages and PermitsUnit$0.00$0.00$0.00
Division 2 (Site Work)$0.00$0.00$0.00
3.0Removal Of Exisiting SignalsUnit$0.00$0.00$0.00
4.0Traffic PoleUnit$0.00$0.00$0.00
Division 3 (Concrete)$0.00$0.00$0.00
5.0Removal Of Detection Loops and RepairUnit$0.00$0.00$0.00
Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
6.0Traffic Controller Unit InstallationUnit$0.00$0.00$0.00
7.03-Section Yellow LED Traffic Signal LightUnit$0.00$0.00$0.00
8.05-Section Yellow LED Traffic Signal LightUnit$0.00$0.00$0.00
9.0Pedestrian LED Traffic Light SignalUnit$0.00$0.00$0.00
10.0Pedestrian Push ButtonsUnit$0.00$0.00$0.00
11.0LED Luminares Traffic Light SignalUnit$0.00$0.00$0.00
12.08-Phase ControllerUnit$0.00$0.00$0.00
13.0Install Intersection DetectorsUnit$0.00$0.00$0.00
15.0TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
16.0Material Costs$0.00$0.00
17.0Tax on Materials10%$0.00$0.00
18.0TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
19.0Labor Cost$0.00$0.00
20.0Insurance & Tax on Labor10%$0.00$0.00
21.0TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
22.0Total Other Direct Costs$0.00$0.00$0.00
23.0Total Material, Labor, Tax & Insurance$0.00$0.00
24.0TOTAL DIRECT COSTS$0.00$0.00$0.00
25.0Overhead10%$0.00$0.00$0.00
26.0Subtotal$0.00$0.00$0.00$0.00
27.0Profit10%$0.00$0.00$0.00
28.0Bonds2.5%$0.00$0.00$0.00
29.0TOTAL$0.00$0.00$0.00

Signature: ______________________________________

File details come from the government source that posted it. Updated .