FA330025R0009 - Questions and Answers.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- FA330025R0009
About this file
This file is a Questions and Answers document for Solicitation FA330025R0009, a Maxwell Air Force Base boiler replacement project. The document provides critical contact information for key contractors involved in the project, including Columbus Fire and Safety as the Fire Controls Contractor and Albireo Energy as the Building Controls Contractor. Systems Analysis Inc. is identified as the preferred Test, Adjust, and Balance (TAB) company, with specific requirements to test and balance water flow through the new boiler and perform TAB on the new hot water pump in Building 1143.
The solicitation is issued by the Department of the Air Force Air Education and Training Command and involves replacing a boiler in Building 1143 at Maxwell AFB. Potential bidders are required to submit proposals within the specified timeframe and are advised to note the site visit details as outlined in the solicitation document. The Q&A document provides essential vendor contact information that bidders may need to obtain pricing and coordinate technical integration for the boiler replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA330025R0009 - Questions and Answers | |||
| Question | Answer | ||
| 1 | 1. | Who is Maxwell's designated Fire Controls Contractor (name and contact)? We need their information to obtain pricing for the fire control modifications listed on the bid drawings/specifications. | Columbus Fire and Safety-Attn: Dee Williams- (706) 681-6992 deewilliams@columbusfire.net |
| 2 | 2. | Who is Maxwell's designated Building Controls Contractor (name and contact)? Need to obtain pricing for integrating the new boiler into the existing BAS. | Albireo Energy- Attn: Dan Singleton (334) 558-8611 dsingleton@albireoenergy.com or David Chatman- (334) 558-8795 dchatman@albireoenergy.com |
| 3 | 3. | Does Maxwell have a preferred TAB company they would like to perform the TAB activities? Will TAB need to ONLY be performed in the building where the new equipment will be installed? | Systems Analysis Inc. (205) 802-7850 sai-tab.com |
Test, adjust and balance water flow through new boiler and perform TAB on new HW pump.
File details come from the government source that posted it. Updated .