Repair_Replace Liner, Wastewater Lagoon One Federal contract opportunity
Solicitation number
FA309923R0002
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Amendment 002, Ques�on 7 response stated that entry control point 5 near FAMCAMP was available to fill trucks for watering hydroseeded areas. Watering via trucks for an extended period is not cost effec�ve. Is there a hydrant or other source in the area of work that temporary sprinklers can be connected? Please iden�fy on a map.

A: There is a hydrant located by the stage one - water treatment plan. A backflow must be used and tested under government supervision for approval.

2. Amendment 002, Ques�on 10 indicates to assume in our bid that there is 2-3 feet of sludge that requires removal. Two (2) feet of sludge is approximately 27,000 cubic yards of waste and three (3) feet will be about 40,000 cubic yards which is a significant difference over this large area. In order to ensure apples to apples bids should the contractor assume the larger quan�ty of three (3) feet of sludge to ensure there is not a large discrepancy in bid amounts?

A: Assume 2.5 feet of sludge.

3. With an es�mated sludge removal of 2-3’, the approximate cost of this hauling and disposal to a landfill as Class II Non-Hazardous waste would likely exceed $1.5 million in hauling and disposal fees. Is there a loca�on on base where sludge can be disposed of assuming it is non-hazardous to reduce this cost impact to the project?

A: There is no loca�on on base where sludge can be disposed of. The Contractor will be responsible for disposal of waste off-base.

4. Does Laughlin permit sludge to be recycled if it is non-hazardous or does the base require soil to be disposed of at a landfill as Class II Non-Hazardous waste?

A: Depends on if the sludge is considered Class A or Class B (amount of pathogens). Class A can be recycled and the 47th Civil Engineering Squadron believes Class B requires a permit from TCEQ to beneficially apply biosolids to the land.

DEPARTMENT OF THE AIR FORCE

47TH FLYING TRAINING WING (AETC)

Repair_Replace Liner,Wastewater Lagoon OnePre-Bid Additional Questions

MXDP 14 -1022

9 June 2023

5. Contractors cannot bid an assump�on of any of the waste being hazardous because tes�ng has not been performed. If the material is hazardous the cost of disposal increases substan�ally. Please confirm that the contractor should assume the sludge is not hazardous for bidding purposes.

A: Assume non-hazardous, but tes�ng will be required.

6. If the contractor is to assume any of the sludge is hazardous for bidding purposes, please provide a quan�ty that should be assumed.

A: If we assume the sludge to be hazardous, then the quan�ty assumed would be 5% or 1628.7 lbs.

7. In the Q&A the government indicated a laydown area would not be established un�l a�er the award. The vicinity of the laydown area for a project handling this level of material is cri�cal to our bid. Please confirm that an area directly adjacent to the ponds will be iden�fied for use.

A: Map of proposed laydown yards below. Any yard used will have to be restored, (hydroseeded and watered to establishment.)

Note: in heavy rains some parts of these areas flood.

8. For bidding purposes please confirm what the current clay liner thickness is?

A: Assume 3 inches

9. Per Government response to Q&A #18, the government has indicated the lagoon is Facilita�ve. We believe this is a typo and should have been faculta�ve. Please confirm.

A: Faculta�ve Lagoon

10. Per Government response to Q&A 18, the government has indicated the lagoon is Facilita�ve (presumed to be faculta�ve) with solar bee aerators. Faculta�ve and Aerated are two different lagoon types so we want to confirm which requirements should be followed for this lagoon.

A: Faculta�ve lagoon

11. Per Government response to Q&A #18, TCEQ has a Faculta�ve and an Aerated Lagoon type, each with different requirements. See snips below of requirements for a Faculta�ve Lagoon. (See atachments on following pages) A: Faculta�ve Lagoon

See snip below of requirements for Aerated Lagoon.

Per the SOW and Atachment A the Lagoon is currently 6.5’ deep. Per the TCEQ requirements for a faculta�ve lagoon, 217.205.b1 and b3 areas of a faculta�ve lagoon require depths up to 12’ and 8’ which the lagoon currently does not meet. If the lagoon is a faculta�ve lagoon type and not an aerated lagoon type is the contractor required to modify the depth of the lagoon or are we just correc�ng the items iden�fied in the SOW?

A: Once sludge is removed depth should meet the minimum design depth. The lagoons should meet the TECQ minimum requirements.

12. Per TCEQ 217.203 when a synthe�c membrane liner is installed an underdrain with a leachate detec�on and collec�on system is required, see snip below. Please confirm that this system shall be installed. Also please confirm that this is the leak detec�on system the SOO is referring to in sec�on 2.5.2.

A: Yes, per TCEQ 217.203 and UFC 3-204-01, a leachate and collec�on system is required to be installed.

13. Per TCEQ 217.203 and UFC 3-240-01 requirements there is no men�on of a leak detec�on system being required. Per

TCEQ when a synthe�c membrane liner is installed an underdrain with a leachate detec�on and collec�on system is required. Please confirm what is to be installed.

A: Yes, per TCEQ 217.203 and UFC 3-204-01, a leachate and collec�on system is required to be installed.

14. Based on response to Ques�on #1 in Amendment 002, temporary diversion piping and valving will be required to intercept the flow into pond 3, instead taking it to pond 2 to maintain the treatment train. To complete this, gravity piping/valving, trenching, excava�on, pond 2 liner modifica�on, and other construc�on ac�vi�es will be required.

Please confirm this scope.

A: The scope of work is to divert the water from pond 1 to lagoon 2 and 3. To follow By TECQ and Laughlin WW permits it needs to follow the lagoon 2 to 3 order. The contractor can propose several means to accomplish including but not limited to excava�on, pumping, or combina�on of, etc.

15. Based on the significant nature of some of the follow-up ques�ons stemming from responses to the first round of ques�ons we are reques�ng a five (5) business day extension for submission of bids a�er receipt of final Q&A responses.

A: Contac�ng Officer authorizes 2 addi�onal calendar days for proposals. Refer to amendment 0003 for details.