Schedule of Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof B399 and B1100, newest first.
File Type Posted
02_-_SOW_CATM&Pool_House-Roofs_v2.docx DOCX document
Attendance_Sheet_(Phone_numbers_redacted).pdf PDF
Questions_and_Answers.docx DOCX document
1d._CATM_Picture.jpg JPG image
Attachment_6_-_Notification_of_Compliance_with_Contract_Insurance_Requirements.pdf PDF
Attachment_7_-_Financial_Responsibility_Sheet.pdf PDF
Attachment_5_-_Blank_DD_Form_1354.pdf PDF
1b.UFC_3-110-03_Roofing.pdf PDF
Attachment_3a__AETC_Form_47.pdf PDF
1c.__ETL_11-18.pdf PDF
1i._Pool_House_Soffit_Picture.jpg JPG image
1f._CATM_Picture.jpg JPG image
1a._Laughlin_Division_01_Specs.docx DOCX document
FA3099-18-R-0019.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_9_Wage_Determination_TX218.pdf PDF
1e.__CATM_Picture.jpg JPG image
1g._CATM_Picture.jpg JPG image
Attachment_2a_Schedule_of_Submittals___MXDP_18-1014.xlsx XLSX spreadsheet
Attachment_4_-_Blank_Progress_Schedule_and_Progress_Report.pdf PDF
Attachment_01__SOW_CATM&Pool_House-Roofs.docx DOCX document
1h._Pool_House_Roof_Picture.jpg JPG image
Attachment_3b_AETC_Form_47_Repair_CATM_Roof_17-1004.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittals Schedule SCHEDULE OF SUBMITTALS PROJECT # MXDP 17-1004 PROJECT TITLE Repair CATM Roof, B1100 SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALREFERENCECERTIFICATION OF COMPLIANCEDESIGN DRAWINGSSPECIFICATIONSDESIGN CALCULATIONSSHOP DRAWINGSSAMPLESForms or PermitsMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATA/ SDSTEST REPORTSFIELD REPORTSRESUMEREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPR

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DIS

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal fergusog: Enter the due date from the Contractor (MM/DD/YY) fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) fergusog: Enter the date the submittal is due back from CE fergusog: Enter the Submittal Number fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Pre-Construction SubmittalsAPRDIS
1Construction Site PlanDiv01 8-211NLT 15 Days After NTP #1
2Environmental Protection PlanDiv01 9-51NLT 15 Days After NTP #1
3Safety PlanDiv01 6-311NLT 15 Days After NTP #1
4Weather Tight PlanSoW 4.51NLT 15 Days After NTP #1
5Shop DrawingsDiv01 2-11NLT 15 Days After NTP #1Div01 2-1.4.3.2
6SDS SheetsDiv01 9-1111NLT 15 Days After NTP #1Div01 9-12.2
7Materials SpecificationsDiv01 2-1111NLT 15 Days After NTP #1Div01 2-1.4.3.3
8Key Personnel ResumesDiv01 1-6.b1NLT 15 Days After NTP #1Div01 4-3; 7-4
9Manufacturer's WarrantiesDiv01 1-21NLT 15 Days After NTP #1
10Contractor WarrantyDiv01 1-21NLT 15 Days After NTP #1
Close-Out
11Approved Draft DD 1354Div01 10-4114 Days prior to Pre-Final Inspection
12As-Built DrawingsDiv01 10-217 days before Final Inspection
13DD 1354Div01 10-41At Final Inspection
14Construction Warranty Management PlanDiv01 10-31Same Date as Project Acceptance
Schedule of Submittals, 21 Jan 2016 (SAF/AQCP)