Issue Amendment 0003 to RFP FA3089-11-R-0011 The following is attached SF 30 Amendment 0003 to RFP FA3089-11-R-0011 NOTE **NO FURTHER QUESTIONS WILL BE ACCEPTED** **RESPONSE DUE DATE HAS BEEN EXTENDED TO 13 SEPTEMBER 2011**
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3089-11-R-0011 MACC Addendum 0002 Revised SOW 8-23-11.zip | ZIP file | |
| FA3089-11-R-0011 Amendment 0001 and Q A 11 Aug 11.zip | ZIP file | |
| FA3089-11-R-0011 MACC Questions and Answers 10 August 2011.pdf | ||
| A E PPQ.docx | DOCX document | |
| FA3089-11-R-0011 MACC Follow-Up Site Visit Minutes and Attendees 1 Aug 2011.pdf | ||
| FA3089-11-R-0011 MACC 902d CONS LGCA Bldg 224 MAP.pdf | ||
| FA3089-11-R-0011 MACC Pre-Proposal Conference Minutes.pdf | ||
| FA3089-11-R-0011 MACC Pre-Proposal Attendees.pdf | ||
| FA3089-11-R-0011 MACC Questions and Answers 14 July 2011.pdf | ||
| FA3089-11-R-0011 MACC 902d CONS LGCA Bldg 224 MAP.pdf | ||
| FA3089-11-R-0011 MACC Past Performance Questionnaire Attachment 6.docx | DOCX document | |
| FA3089-11-R-0011 RFP Attachments.zip | ZIP file |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference continuation page.
Joanna Cox
Contract Specialist
902 CONS/LGCA
395 B Street West, Ste 102
Randolph AFB, TX 78150-4521
(210) 652-8884 joanna.cox.1@us.af.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3089-11-R-0011
X 9B. DATED (SEE ITEM 11)
21-Jun-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2011
CODE
902 CONS/LGCA - FA3089
395 B STREET WEST STE 2
RANDOLPH AFB TX 78150-4525
FA3089 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA3089-11-R-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to revise the Solicitation and extend the closing date.
1. Reference Amendment 0001, Item c., DELETE:
Contractor shall reference the proposed Period of Performance on Attachment 2, Construction Cost Breakdown.
“Performance period required from date notice to proceed is received by contractor: _________ calendar days.”
2. Reference Section B, Supplies or Services and Prices, ADD:
SPECIAL NOTE: Reference contract clause FAR 52.211-10, the contractor shall complete the Seed
Project (Construct Fire Station Storage Area Bldg 749) no later than three-hundred (300) calendar days after notice to proceed.
If your proposal exceeds the required Period of Performance, it shall be considered non-responsive.
3. Reference Section F, Deliveries or Performance, Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), CHANGE:
FROM:
52.211-10 COMMENCEMENT, PROSECUTION, ANDCOMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (specified time stated in each delivery order) (10) ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date specified (in each delivery order). The time stated for completion shall include final cleanup of the premises.
TO:
52.211-10 COMMENCEMENT, PROSECUTION, ANDCOMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later (to be cited on each individual delivery order). The time stated for completion shall include final cleanup of the premises.
4. Reference Section H, Special Contract Requirements, H-4 PERFORMANCE PERIOD, CHANGE:
FROM:
The period of performance on each delivery order will be determined during negotiation between the
Government and the contractor. The period of performance on delivery orders are independent of each other and may run concurrently.
TO:
The period of performance will be provided by the Government at issuance of each Request for Proposal (RFP).
The period of performance on delivery orders are independent of each other and may run concurrently.
FA3089-11-R-0011
5. The current closing date of 6 Sep 2011 is hereby extended to 13 Sep 2011.
6. All other provisions, clauses and attachments remain unchanged.