RFI Questions.pdf
PDF 52 KB Posted
- Attached to
- Freedom Fest Porta Johns
- Solicitation number
- FA302226R0012
About this file
This is a Questions and Answers document from a federal solicitation at Columbus Air Force Base. The document addresses six inquiries from potential offerors regarding evaluation criteria, site visits, wage determinations, incumbent information, scheduling, and facility requirements.
The Government has clarified that evaluation will use a lowest price technically acceptable approach, with pricing as the primary factor and technical acceptability as a secondary evaluation criterion based on proposal synopsis demonstrating complete understanding of requirements. No pre-bid site visit to Columbus AFB is available. The Service Contract Act applies to all labor categories, requiring offerors to include a compliant wage schedule reflecting WDOL 2015-5157 Rev. 29 in their quotes. The preferred incumbent is identified as David Knight Construction. Regarding project scheduling, the Government directs offerors to sections 1.2 and 2.5 of the Statement of Need for removal timing information. For the trailer unit requirement, the Government specifies that the unit must be self-sufficient with hold tanks for water and sewer/black water and an on-board generator for electricity, as water and power will not be provided at the site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. EVALUATION CRITERIA: Section 52.212-2 contains placeholder language regarding the relative importance of Pricing vs. Technical Acceptability. Could you please confirm the intended weighting or order of importance between these two factors prior to the offer due date?
Pricing will be first with the criteria being lowest price technically acceptable.
Technical Acceptability is next and this will be based on a synopsis of your proposal to see if there is a complete understanding of the requirement.
2. SITE VISIT: Is a pre-bid site visit to Columbus AFB available? If so, please advise on how to schedule and any access requirements we should prepare for in advance.
There is no site visit.
3. WAGE DETERMINATION: The solicitation references WDOL 2015-5157 Rev. 29. Please confirm whether the Service Contract Act applies to all labor categories under this contract and whether a compliant wage schedule must be reflected in our quote.
The Service Contract Act applies to all labor categories.
1. Is there a preferred incumbent for this project ? David Knight Construction
2. Can removal take place on Monday 7/6? Please see sections 1.2 and 2.5 in the Statement of Need.
3. For trailer unit, do you have water and power availability? The unit needs to be Self-sufficient with hold tanks for water and sewer/black water tank and a generator for electricity.