FA3022-10-R-0002 Attachment L-1
STATEMENT OF WORK
FOR
EEPZ 97-2001F1
Repair Roof, B932
2 February 2009
SUBMITTALS REQUIRED:
See Form 66 (attached)
SCOPE:
This project is to repair the roof of building 932. The work shall consist of providing all plant, labor, transportation, materials, equipment, and the performance of all work necessary to remove ballast from the roof and install both a thin layer of rigid insulation and a new single ply EPDM roofing layer. All work shall be performed in strict accordance with the Statement of Work, the proposed Roofing IDIQ Specifications; and all local, state, and federal regulations.
DESIGN:
Attached are preliminary design drawings and applicable record drawings. Designs are considered to be no more than 35% complete. Contractor is responsible for all remaining design effort in order to provide an acceptable final product that meets intent of this Statement of Work and design drawings. Contractor shall verify all dimensions, calculations and code requirements for all elements of work. At time of proposal submission, contractor shall provide evidence of adequate design, including but not limited to electrical, mechanical, and civil calculations.
Contractor is responsible for ensuring constructibility and code compliance.
Record drawings may be provided to the contractor as a courtesy at the discretion of the
Government, but their accuracy is not guaranteed. The contractor shall do his own field investigations of the utilities and other items in the area and base his design accordingly.
SCHEDULING:
A suitable work schedule must be approved by the Government before any work is started. This schedule is subject to change depending on mission requirements.
FA3022-10-R-0002 Attachment L-1
CONSTRUCTION PLAN:
DEMOLITION:
Contractor Shall;
Remove necessary flashing, soffit and fascia for the installation of a new single ply
EPDM roofing layer.
Remove existing loose roof ballast from roof surface.
Do not remove existing roofing surface deck of decking material; integrity of existing roof will not be compromised. Must maintain leakage protection to ensure building interior and equipment remains dry.
Temporarily remove existing electrical wiring, electrical devices, communications, cables, satellite dishes, exterior lighting, horns, alarms, and any other appurtenances from area of work necessary to accomplish the new roofing system. Reinstall all removed items and appurtenances after new roof installation. Remount devices as necessary to resume their normal operations.
Coordinate all work to be accomplished dealing with communications equipment removal and reinstallation with the Contracting Officer.
INSTALLATION:
Contractor Shall;
Newly installed EPDM roof layer shall follow existing slope.
Meet Codes on all existing roof penetrations through new roof layer, including but not limited to mechanical equipment, vent pipes, vent stacks, exhaust fans, hoods, wiring, antenna, blowers and roof drains, electrical, communications.
Install thin layer of rigid insulation to ensure even surface for EPDM application.
Install new single ply EPDM layer.
Properly seal all penetrations upon installation of the new EPDM layer.
GOVERNMENT FURNISHED EQUIPMENT:
The Government will not furnish materials.
INSTALLATION/WORK PLAN:
Provide adequate lighting for safe work area and personnel noise protection as required while engaged in work. There may be hazardous materials associated with this project. Contractor shall be responsible for the installation and work. Contractor shall install proper construction markings and tape during work in progress. Contractor shall maintain a hazard free work area during daily operations. Contractor shall provide notice to the Contracting Officer prior to starting any work under this project. Contractor shall provide As-Built drawings of final installation prior to final acceptance by the Government.