0001 Misc. Wood Members
a. Plywood roof sheathing 5500 SF
b. Edge nailers, treated 1500 BF
c. Fascia and Trim, treated 3500 BF
d. Wood framing members, treated
(1) 2X4 1000 BF
(2) 2X6 1000 BF
(3) 2X8 1000 BF
INDEFINITE QUANTITY PROJECT
TO
BID SCHEDULE
FOR
Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.
NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.
REPLACE ROOFS
COLUMBUS AIR FORCE BASE, MISSISSIPPI
DECKING/SHEATHING/FRAMING SYSTEMS
Remove deteriorated wood and install new wood:
BASIC YEAR
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
UNIT
PRICE TOTAL
FA3022-10-R-0002 Atch 3
0002 Batt Insulation, R-19 125000 SF
0003 Roof Insulation, Rigid:
Polyisocyanurate
(1) 1" thick 50 SQ
(2) 1-1/2" thick 50 SQ
(3) 2" thick 25 SQ
25 SQ
a. 1" thick, R-5.26 25 SQ
b. 2" thick, R-10 25 SQ
c. 3" thick, R-15 25 SQ
25 SQ
0005 Install cants
a. Cants 1000 LF
b. Tapered Cants 200 LF
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY
ROOF INSULATION
UNIT
UNIT
PRICE TOTAL
Remove existing and install new roof insulation:
(4) Add for tapered insulation 1/4" per foot
Rigid extruded polystyrene insulation (for
EPDM roofing):
d. Add for tapered insulation 1/4" per foot
0006 Shingle Roofing
75 SQ
75 SQ
0007 Install new metal roofing system:
(includes removal of gravel ballast)
a. Standing seam, Factory color-finish 1250 SQ
0008 Install new structural support system 2000 SQ
(increase roof slope over flat roof)
150 SQ
200 SQ
a. Fully Adhered 25 SQ
0011 Metal Flashing Systems:
a. Galvanized sheet metal
(1) Drip edge 1000 LF
ROOFING SYSTEMS
Remove existing roof system and install new roof system, unless noted otherwise:
UNIT
UNIT
PRICE TOTAL
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY
a. Mineral surfaced fiberglass strip shingles
a. 4-ply built-up roofing over wood, gypsum, or concrete decks
b. 4-ply built-up roofing over metal decks
(over insulation)
b. Asphalt-glass reinforcing shingle underlayment
Remove existing bult-up roofing system and install new system:
Remove existing built-up roofing system and install new single ply EPDM roofing system (Elastomeric)
0011 (2) Counter flashing 5000 LF
Cont'd
(3) Valley flashing 500 LF
(4) Step flashing 340 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Cleats 2000 LF
(8) Scupper lining 10 EA
b. Aluminum, Factor-color finish
(1) Drip edge 500 LF
(2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 100 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Scupper lining 10 EA
a. Neoprene type bellows 300 LF
a. Galvanized sheet metal
(1) 6" - 8" 1000 LF
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
UNIT
PRICE TOTAL
Remove existing expansion joint and install new expansion joint
Install new gravel guard or fascia
(face dinension)
0013 (2) 9"-12" 500 LF
b. Aluminum, Factory-color finish
(1) 6" - 8" 5000 LF
(2) 9"-12" 5000 LF
0014 100 EA
a. Steel, Factory-color finish 500 LF
b. Aluminum, Factory-color finish 1130 LF
a. Steel, Factory-color finish 200 LF
b. Aluminum, Factory-color finish 1130 LF
a. Up to 4" diameter 20 EA
b. Up to 8" diameter 20 EA
Steel or Aluminum, Factory-color finish 500 SF
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
UNIT
PRICE TOTAL
Install new precast concrete splash blocks
Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.
Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.
Remove existing gutter and install new gutter (or install where missing).
Approximate size 5"-6" wide.
Remove existing downspout and install new downspout (or replace where missing). Approximate size 3"X4" rect.
0019 24500 SF
TOTAL
UNIT
UNIT
PRICE TOTAL
ITEM
NO: DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY
Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.
1001 Misc. Wood Members
b. Edge nailers, treated 1500 BF
c. Fascia and Trim, treated 3500 BF
d. Wood framing members, treated
(1) 2X4 1000 BF
(2) 2X6 1000 BF
(3) 2X8 1000 BF
INDEFINITE QUANTITY PROJECT
TO
BID SCHEDULE
FOR
Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.
NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.
REPLACE ROOFS
COLUMBUS AIR FORCE BASE, MISSISSIPPI
DECKING/SHEATHING/FRAMING SYSTEMS
Remove deteriorated wood and install new wood:
FIRST OPTION YEAR
DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
ITEM
NO:
UNIT
1002 Batt Insulation, R-19 125000 SF
1003 Roof Insulation, Rigid:
Polyisocyanurate
(1) 1" thick 50 SQ
(2) 1-1/2" thick 50 SQ
(3) 2" thick 25 SQ
25 SQ
a. 1" thick, R-5.26 25 SQ
b. 2" thick, R-10 25 SQ
c. 3" thick, R-15 25 SQ
25 SQ
1005 Install cants
a. Cants 1000 LF
b. Tapered Cants 200 LF
ROOF INSULATION
ITEM
NO:
Remove existing and install new roof insulation:
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
(4) Add for tapered insulation 1/4" per foot
Rigid extruded polystyrene insulation (for
EPDM roofing):
1006 Shingle Roofing
75 SQ
1007 Install new metal roofing system:
(includes removal of gravel ballast)
a. Standing seam, Factory color-finish 1250 SQ
1008 Install new structural support system 2000 SQ
(increase roof slope over flat roof)
150 SQ
200 SQ
a. Fully Adhered 25 SQ
1011 Metal Flashing Systems:
a. Galvanized sheet metal
(1) Drip edge 1000 LF
ROOFING SYSTEMS
Remove existing roof system and install new roof system, unless noted otherwise:
ITEM
NO:
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
a. Mineral surfaced fiberglass strip shingles
a. 4-ply built-up roofing over wood, gypsum, or concrete decks
b. 4-ply built-up roofing over metal decks
(over insulation)
b. Asphalt-glass reinforcing shingle underlayment
Remove existing bult-up roofing system and install new system:
Remove existing built-up roofing system and install new single ply EPDM roofing
1011 (2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 340 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Cleats 2000 LF
(8) Scupper lining 10 EA
b. Aluminum, Factor-color finish
(1) Drip edge 500 LF
(2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 100 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Scupper lining 10 EA
a. Neoprene type bellows 300 LF
a. Galvanized sheet metal
(1) 6" - 8" 1000 LF
DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
ITEM
NO:
UNIT
PRICE TOTAL
Remove existing expansion joint and install new expansion joint
Install new gravel guard or fascia
1013 (2) 9"-12" 500 LF
b. Aluminum, Factory-color finish
(1) 6" - 8" 5000 LF
(2) 9"-12" 5000 LF
1014 100 EA
a. Steel, Factory-color finish 500 LF
b. Aluminum, Factory-color finish 1130 LF
a. Steel, Factory-color finish 200 LF
b. Aluminum, Factory-color finish 1130 LF
a. Up to 4" diameter 20 EA
b. Up to 8" diameter 20 EA
Steel or Aluminum, Factory-color finish 500 SF
ITEM
NO:
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
Install new precast concrete splash blocks
Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.
Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.
Remove existing gutter and install new gutter (or install where missing).
Approximate size 5"-6" wide.
Remove existing downspout and install new downspout (or replace where
1019 24500 SF
ITEM
NO:
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.
2001 Misc. Wood Members
b. Edge nailers, treated 1500 BF
c. Fascia and Trim, treated 3500 BF
d. Wood framing members, treated
(1) 2X4 1000 BF
(2) 2X6 1000 BF
(3) 2X8 1000 BF
INDEFINITE QUANTITY PROJECT
TO
BID SCHEDULE
FOR
Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.
NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.
REPLACE ROOFS
COLUMBUS AIR FORCE BASE, MISSISSIPPI
DECKING/SHEATHING/FRAMING SYSTEMS
Remove deteriorated wood and install new wood:
SECOND OPTION YEAR
DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
ITEM
NO:
UNIT
2002 Batt Insulation, R-19 125000 SF
2003 Roof Insulation, Rigid:
Polyisocyanurate
(1) 1" thick 50 SQ
(2) 1-1/2" thick 50 SQ
(3) 2" thick 25 SQ
25 SQ
a. 1" thick, R-5.26 25 SQ
b. 2" thick, R-10 25 SQ
c. 3" thick, R-15 25 SQ
25 SQ
2005 Install cants
a. Cants 1000 LF
b. Tapered Cants 200 LF
ROOF INSULATION
Remove existing and install new roof insulation:
ITEM
NO:
(4) Add for tapered insulation 1/4" per foot
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
Rigid extruded polystyrene insulation (for
EPDM roofing):
2006 Shingle Roofing
75 SQ
2007 Install new metal roofing system:
(includes removal of gravel ballast)
a. Standing seam, Factory color-finish 1250 SQ
2008 Install new structural support system 2000 SQ
(increase roof slope over flat roof)
150 SQ
200 SQ
a. Fully Adhered 25 SQ
2011 Metal Flashing Systems:
a. Galvanized sheet metal
(1) Drip edge 1000 LF
ROOFING SYSTEMS
Remove existing roof system and install new roof system, unless noted otherwise:
ITEM
NO:
a. Mineral surfaced fiberglass strip shingles
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
a. 4-ply built-up roofing over wood, gypsum, or concrete decks
b. 4-ply built-up roofing over metal decks
(over insulation)
b. Asphalt-glass reinforcing shingle underlayment
Remove existing bult-up roofing system and install new system:
Remove existing built-up roofing system and install new single ply EPDM roofing
2011 (2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 340 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Cleats 2000 LF
(8) Scupper lining 10 EA
b. Aluminum, Factor-color finish
(1) Drip edge 500 LF
(2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 100 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Scupper lining 10 EA
a. Neoprene type bellows 300 LF
a. Galvanized sheet metal
(1) 6" - 8" 1000 LF
DESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
ITEM
NO:
Remove existing expansion joint and install new expansion joint
UNIT
PRICE TOTAL
Install new gravel guard or fascia
2013 (2) 9"-12" 500 LF
b. Aluminum, Factory-color finish
(1) 6" - 8" 5000 LF
(2) 9"-12" 5000 LF
2014 100 EA
a. Steel, Factory-color finish 500 LF
b. Aluminum, Factory-color finish 1130 LF
a. Steel, Factory-color finish 200 LF
b. Aluminum, Factory-color finish 1130 LF
a. Up to 4" diameter 20 EA
b. Up to 8" diameter 20 EA
Steel or Aluminum, Factory-color finish 500 SF
ITEM
NO:
Install new precast concrete splash blocks
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.
Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.
Remove existing gutter and install new gutter (or install where missing).
Approximate size 5"-6" wide.
Remove existing downspout and install new downspout (or replace where
2019 24500 SF
ITEM
NO:
Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.
UNIT
PRICE TOTALDESCRIPTION OF WORK ITEM
ESTIMATED
QUANTITY UNIT
3001 Misc. Wood Members
b. Edge nailers, treated 1500 BF
c. Fascia and Trim, treated 3500 BF
d. Wood framing members, treated
(1) 2X4 1000 BF
(2) 2X6 1000 BF
(3) 2X8 1000 BF
INDEFINITE QUANTITY PROJECT
TO
BID SCHEDULE
FOR
Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.
NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.
REPLACE ROOFS
COLUMBUS AIR FORCE BASE, MISSISSIPPI
DECKING/SHEATHING/FRAMING SYSTEMS
Remove deteriorated wood and install new wood:
THIRD OPTION YEAR
DESCRIPTION OF WORK ITEM TOTAL
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO:
3002 Batt Insulation, R-19 125000 SF
3003 Roof Insulation, Rigid:
Polyisocyanurate
(1) 1" thick 50 SQ
(2) 1-1/2" thick 50 SQ
(3) 2" thick 25 SQ
25 SQ
a. 1" thick, R-5.26 25 SQ
b. 2" thick, R-10 25 SQ
c. 3" thick, R-15 25 SQ
25 SQ
3005 Install cants
a. Cants 1000 LF
b. Tapered Cants 200 LF
Remove existing and install new roof insulation:
ROOF INSULATION
TOTAL
(4) Add for tapered insulation 1/4" per foot
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO: DESCRIPTION OF WORK ITEM
Rigid extruded polystyrene insulation (for
EPDM roofing):
3006 Shingle Roofing
75 SQ
3007 Install new metal roofing system:
(includes removal of gravel ballast)
a. Standing seam, Factory color-finish 1250 SQ
3008 Install new structural support system 2000 SQ
(increase roof slope over flat roof)
150 SQ
200 SQ
a. Fully Adhered 25 SQ
3011 Metal Flashing Systems:
a. Galvanized sheet metal
(1) Drip edge 1000 LF
ROOFING SYSTEMS
Remove existing roof system and install new roof system, unless noted otherwise:
TOTAL
a. Mineral surfaced fiberglass strip shingles
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO: DESCRIPTION OF WORK ITEM
a. 4-ply built-up roofing over wood, gypsum, or concrete decks
b. 4-ply built-up roofing over metal decks
(over insulation)
b. Asphalt-glass reinforcing shingle underlayment
Remove existing bult-up roofing system and install new system:
Remove existing built-up roofing system and install new single ply EPDM roofing
3011 (2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 340 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Cleats 2000 LF
(8) Scupper lining 10 EA
b. Aluminum, Factor-color finish
(1) Drip edge 500 LF
(2) Counter flashing 5000 LF
(3) Valley flashing 500 LF
(4) Step flashing 100 LF
(5) Flat sheet 500 LF
(6) Cap flashing 500 LF
(7) Scupper lining 10 EA
a. Neoprene type bellows 300 LF
a. Galvanized sheet metal
(1) 6" - 8" 1000 LF
DESCRIPTION OF WORK ITEM
Install new gravel guard or fascia
(face dinension)
TOTAL
Remove existing expansion joint and install new expansion joint
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO:
3013 (2) 9"-12" 500 LF
b. Aluminum, Factory-color finish
(1) 6" - 8" 5000 LF
(2) 9"-12" 5000 LF
3014 100 EA
a. Steel, Factory-color finish 500 LF
b. Aluminum, Factory-color finish 1130 LF
a. Steel, Factory-color finish 200 LF
b. Aluminum, Factory-color finish 1130 LF
a. Up to 4" diameter 20 EA
b. Up to 8" diameter 20 EA
Steel or Aluminum, Factory-color finish 500 SF
TOTAL
Install new precast concrete splash blocks
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO: DESCRIPTION OF WORK ITEM
Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.
Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.
Remove existing gutter and install new gutter (or install where missing).
Approximate size 5"-6" wide.
Remove existing downspout and install new downspout (or replace where
3019 24500 SF
TOTAL
Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.
ESTIMATED
QUANTITY UNIT
UNIT
PRICE
ITEM
NO: DESCRIPTION OF WORK ITEM