0001 Misc. Wood Members

a. Plywood roof sheathing 5500 SF

b. Edge nailers, treated 1500 BF

c. Fascia and Trim, treated 3500 BF

d. Wood framing members, treated

(1) 2X4 1000 BF

(2) 2X6 1000 BF

(3) 2X8 1000 BF

INDEFINITE QUANTITY PROJECT

TO

BID SCHEDULE

FOR

Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.

NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.

REPLACE ROOFS

COLUMBUS AIR FORCE BASE, MISSISSIPPI

DECKING/SHEATHING/FRAMING SYSTEMS

Remove deteriorated wood and install new wood:

BASIC YEAR

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

UNIT

PRICE TOTAL

FA3022-10-R-0002 Atch 3

0002 Batt Insulation, R-19 125000 SF

0003 Roof Insulation, Rigid:

Polyisocyanurate

(1) 1" thick 50 SQ

(2) 1-1/2" thick 50 SQ

(3) 2" thick 25 SQ

25 SQ

a. 1" thick, R-5.26 25 SQ

b. 2" thick, R-10 25 SQ

c. 3" thick, R-15 25 SQ

25 SQ

0005 Install cants

a. Cants 1000 LF

b. Tapered Cants 200 LF

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY

ROOF INSULATION

UNIT

UNIT

PRICE TOTAL

Remove existing and install new roof insulation:

(4) Add for tapered insulation 1/4" per foot

Rigid extruded polystyrene insulation (for

EPDM roofing):

d. Add for tapered insulation 1/4" per foot

0006 Shingle Roofing

75 SQ

75 SQ

0007 Install new metal roofing system:

(includes removal of gravel ballast)

a. Standing seam, Factory color-finish 1250 SQ

0008 Install new structural support system 2000 SQ

(increase roof slope over flat roof)

150 SQ

200 SQ

a. Fully Adhered 25 SQ

0011 Metal Flashing Systems:

a. Galvanized sheet metal

(1) Drip edge 1000 LF

ROOFING SYSTEMS

Remove existing roof system and install new roof system, unless noted otherwise:

UNIT

UNIT

PRICE TOTAL

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY

a. Mineral surfaced fiberglass strip shingles

a. 4-ply built-up roofing over wood, gypsum, or concrete decks

b. 4-ply built-up roofing over metal decks

(over insulation)

b. Asphalt-glass reinforcing shingle underlayment

Remove existing bult-up roofing system and install new system:

Remove existing built-up roofing system and install new single ply EPDM roofing system (Elastomeric)

0011 (2) Counter flashing 5000 LF

Cont'd

(3) Valley flashing 500 LF

(4) Step flashing 340 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Cleats 2000 LF

(8) Scupper lining 10 EA

b. Aluminum, Factor-color finish

(1) Drip edge 500 LF

(2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 100 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Scupper lining 10 EA

a. Neoprene type bellows 300 LF

a. Galvanized sheet metal

(1) 6" - 8" 1000 LF

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

UNIT

PRICE TOTAL

Remove existing expansion joint and install new expansion joint

Install new gravel guard or fascia

(face dinension)

0013 (2) 9"-12" 500 LF

b. Aluminum, Factory-color finish

(1) 6" - 8" 5000 LF

(2) 9"-12" 5000 LF

0014 100 EA

a. Steel, Factory-color finish 500 LF

b. Aluminum, Factory-color finish 1130 LF

a. Steel, Factory-color finish 200 LF

b. Aluminum, Factory-color finish 1130 LF

a. Up to 4" diameter 20 EA

b. Up to 8" diameter 20 EA

Steel or Aluminum, Factory-color finish 500 SF

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

UNIT

PRICE TOTAL

Install new precast concrete splash blocks

Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.

Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.

Remove existing gutter and install new gutter (or install where missing).

Approximate size 5"-6" wide.

Remove existing downspout and install new downspout (or replace where missing). Approximate size 3"X4" rect.

0019 24500 SF

TOTAL

UNIT

UNIT

PRICE TOTAL

ITEM

NO: DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY

Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.

1001 Misc. Wood Members

b. Edge nailers, treated 1500 BF

c. Fascia and Trim, treated 3500 BF

d. Wood framing members, treated

(1) 2X4 1000 BF

(2) 2X6 1000 BF

(3) 2X8 1000 BF

INDEFINITE QUANTITY PROJECT

TO

BID SCHEDULE

FOR

Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.

NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.

REPLACE ROOFS

COLUMBUS AIR FORCE BASE, MISSISSIPPI

DECKING/SHEATHING/FRAMING SYSTEMS

Remove deteriorated wood and install new wood:

FIRST OPTION YEAR

DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

ITEM

NO:

UNIT

1002 Batt Insulation, R-19 125000 SF

1003 Roof Insulation, Rigid:

Polyisocyanurate

(1) 1" thick 50 SQ

(2) 1-1/2" thick 50 SQ

(3) 2" thick 25 SQ

25 SQ

a. 1" thick, R-5.26 25 SQ

b. 2" thick, R-10 25 SQ

c. 3" thick, R-15 25 SQ

25 SQ

1005 Install cants

a. Cants 1000 LF

b. Tapered Cants 200 LF

ROOF INSULATION

ITEM

NO:

Remove existing and install new roof insulation:

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

(4) Add for tapered insulation 1/4" per foot

Rigid extruded polystyrene insulation (for

EPDM roofing):

1006 Shingle Roofing

75 SQ

1007 Install new metal roofing system:

(includes removal of gravel ballast)

a. Standing seam, Factory color-finish 1250 SQ

1008 Install new structural support system 2000 SQ

(increase roof slope over flat roof)

150 SQ

200 SQ

a. Fully Adhered 25 SQ

1011 Metal Flashing Systems:

a. Galvanized sheet metal

(1) Drip edge 1000 LF

ROOFING SYSTEMS

Remove existing roof system and install new roof system, unless noted otherwise:

ITEM

NO:

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

a. Mineral surfaced fiberglass strip shingles

a. 4-ply built-up roofing over wood, gypsum, or concrete decks

b. 4-ply built-up roofing over metal decks

(over insulation)

b. Asphalt-glass reinforcing shingle underlayment

Remove existing bult-up roofing system and install new system:

Remove existing built-up roofing system and install new single ply EPDM roofing

1011 (2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 340 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Cleats 2000 LF

(8) Scupper lining 10 EA

b. Aluminum, Factor-color finish

(1) Drip edge 500 LF

(2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 100 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Scupper lining 10 EA

a. Neoprene type bellows 300 LF

a. Galvanized sheet metal

(1) 6" - 8" 1000 LF

DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

ITEM

NO:

UNIT

PRICE TOTAL

Remove existing expansion joint and install new expansion joint

Install new gravel guard or fascia

1013 (2) 9"-12" 500 LF

b. Aluminum, Factory-color finish

(1) 6" - 8" 5000 LF

(2) 9"-12" 5000 LF

1014 100 EA

a. Steel, Factory-color finish 500 LF

b. Aluminum, Factory-color finish 1130 LF

a. Steel, Factory-color finish 200 LF

b. Aluminum, Factory-color finish 1130 LF

a. Up to 4" diameter 20 EA

b. Up to 8" diameter 20 EA

Steel or Aluminum, Factory-color finish 500 SF

ITEM

NO:

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

Install new precast concrete splash blocks

Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.

Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.

Remove existing gutter and install new gutter (or install where missing).

Approximate size 5"-6" wide.

Remove existing downspout and install new downspout (or replace where

1019 24500 SF

ITEM

NO:

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.

2001 Misc. Wood Members

b. Edge nailers, treated 1500 BF

c. Fascia and Trim, treated 3500 BF

d. Wood framing members, treated

(1) 2X4 1000 BF

(2) 2X6 1000 BF

(3) 2X8 1000 BF

INDEFINITE QUANTITY PROJECT

TO

BID SCHEDULE

FOR

Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.

NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.

REPLACE ROOFS

COLUMBUS AIR FORCE BASE, MISSISSIPPI

DECKING/SHEATHING/FRAMING SYSTEMS

Remove deteriorated wood and install new wood:

SECOND OPTION YEAR

DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

ITEM

NO:

UNIT

2002 Batt Insulation, R-19 125000 SF

2003 Roof Insulation, Rigid:

Polyisocyanurate

(1) 1" thick 50 SQ

(2) 1-1/2" thick 50 SQ

(3) 2" thick 25 SQ

25 SQ

a. 1" thick, R-5.26 25 SQ

b. 2" thick, R-10 25 SQ

c. 3" thick, R-15 25 SQ

25 SQ

2005 Install cants

a. Cants 1000 LF

b. Tapered Cants 200 LF

ROOF INSULATION

Remove existing and install new roof insulation:

ITEM

NO:

(4) Add for tapered insulation 1/4" per foot

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

Rigid extruded polystyrene insulation (for

EPDM roofing):

2006 Shingle Roofing

75 SQ

2007 Install new metal roofing system:

(includes removal of gravel ballast)

a. Standing seam, Factory color-finish 1250 SQ

2008 Install new structural support system 2000 SQ

(increase roof slope over flat roof)

150 SQ

200 SQ

a. Fully Adhered 25 SQ

2011 Metal Flashing Systems:

a. Galvanized sheet metal

(1) Drip edge 1000 LF

ROOFING SYSTEMS

Remove existing roof system and install new roof system, unless noted otherwise:

ITEM

NO:

a. Mineral surfaced fiberglass strip shingles

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

a. 4-ply built-up roofing over wood, gypsum, or concrete decks

b. 4-ply built-up roofing over metal decks

(over insulation)

b. Asphalt-glass reinforcing shingle underlayment

Remove existing bult-up roofing system and install new system:

Remove existing built-up roofing system and install new single ply EPDM roofing

2011 (2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 340 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Cleats 2000 LF

(8) Scupper lining 10 EA

b. Aluminum, Factor-color finish

(1) Drip edge 500 LF

(2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 100 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Scupper lining 10 EA

a. Neoprene type bellows 300 LF

a. Galvanized sheet metal

(1) 6" - 8" 1000 LF

DESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

ITEM

NO:

Remove existing expansion joint and install new expansion joint

UNIT

PRICE TOTAL

Install new gravel guard or fascia

2013 (2) 9"-12" 500 LF

b. Aluminum, Factory-color finish

(1) 6" - 8" 5000 LF

(2) 9"-12" 5000 LF

2014 100 EA

a. Steel, Factory-color finish 500 LF

b. Aluminum, Factory-color finish 1130 LF

a. Steel, Factory-color finish 200 LF

b. Aluminum, Factory-color finish 1130 LF

a. Up to 4" diameter 20 EA

b. Up to 8" diameter 20 EA

Steel or Aluminum, Factory-color finish 500 SF

ITEM

NO:

Install new precast concrete splash blocks

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.

Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.

Remove existing gutter and install new gutter (or install where missing).

Approximate size 5"-6" wide.

Remove existing downspout and install new downspout (or replace where

2019 24500 SF

ITEM

NO:

Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.

UNIT

PRICE TOTALDESCRIPTION OF WORK ITEM

ESTIMATED

QUANTITY UNIT

3001 Misc. Wood Members

b. Edge nailers, treated 1500 BF

c. Fascia and Trim, treated 3500 BF

d. Wood framing members, treated

(1) 2X4 1000 BF

(2) 2X6 1000 BF

(3) 2X8 1000 BF

INDEFINITE QUANTITY PROJECT

TO

BID SCHEDULE

FOR

Repair and/or replacement of defective roofing and roofing components, measured by the Square (SQ), Board Foot (BF), Linear Foot (LF), Square Foot (SF), or Each (EA), on miscellaneous type buildings and dormitory type buildings.

NOTE: Prices shall include all work specified for demolition, removal, reinstallation, and disposition of defective materials and construction; painting of replaced exposed to view surfaces and construction; and all word incidental thereto as set forth in the specifications. The buildings, and structures may be of any type of construction, shape, size and any number of stories in height.

REPLACE ROOFS

COLUMBUS AIR FORCE BASE, MISSISSIPPI

DECKING/SHEATHING/FRAMING SYSTEMS

Remove deteriorated wood and install new wood:

THIRD OPTION YEAR

DESCRIPTION OF WORK ITEM TOTAL

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO:

3002 Batt Insulation, R-19 125000 SF

3003 Roof Insulation, Rigid:

Polyisocyanurate

(1) 1" thick 50 SQ

(2) 1-1/2" thick 50 SQ

(3) 2" thick 25 SQ

25 SQ

a. 1" thick, R-5.26 25 SQ

b. 2" thick, R-10 25 SQ

c. 3" thick, R-15 25 SQ

25 SQ

3005 Install cants

a. Cants 1000 LF

b. Tapered Cants 200 LF

Remove existing and install new roof insulation:

ROOF INSULATION

TOTAL

(4) Add for tapered insulation 1/4" per foot

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO: DESCRIPTION OF WORK ITEM

Rigid extruded polystyrene insulation (for

EPDM roofing):

3006 Shingle Roofing

75 SQ

3007 Install new metal roofing system:

(includes removal of gravel ballast)

a. Standing seam, Factory color-finish 1250 SQ

3008 Install new structural support system 2000 SQ

(increase roof slope over flat roof)

150 SQ

200 SQ

a. Fully Adhered 25 SQ

3011 Metal Flashing Systems:

a. Galvanized sheet metal

(1) Drip edge 1000 LF

ROOFING SYSTEMS

Remove existing roof system and install new roof system, unless noted otherwise:

TOTAL

a. Mineral surfaced fiberglass strip shingles

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO: DESCRIPTION OF WORK ITEM

a. 4-ply built-up roofing over wood, gypsum, or concrete decks

b. 4-ply built-up roofing over metal decks

(over insulation)

b. Asphalt-glass reinforcing shingle underlayment

Remove existing bult-up roofing system and install new system:

Remove existing built-up roofing system and install new single ply EPDM roofing

3011 (2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 340 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Cleats 2000 LF

(8) Scupper lining 10 EA

b. Aluminum, Factor-color finish

(1) Drip edge 500 LF

(2) Counter flashing 5000 LF

(3) Valley flashing 500 LF

(4) Step flashing 100 LF

(5) Flat sheet 500 LF

(6) Cap flashing 500 LF

(7) Scupper lining 10 EA

a. Neoprene type bellows 300 LF

a. Galvanized sheet metal

(1) 6" - 8" 1000 LF

DESCRIPTION OF WORK ITEM

Install new gravel guard or fascia

(face dinension)

TOTAL

Remove existing expansion joint and install new expansion joint

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO:

3013 (2) 9"-12" 500 LF

b. Aluminum, Factory-color finish

(1) 6" - 8" 5000 LF

(2) 9"-12" 5000 LF

3014 100 EA

a. Steel, Factory-color finish 500 LF

b. Aluminum, Factory-color finish 1130 LF

a. Steel, Factory-color finish 200 LF

b. Aluminum, Factory-color finish 1130 LF

a. Up to 4" diameter 20 EA

b. Up to 8" diameter 20 EA

Steel or Aluminum, Factory-color finish 500 SF

TOTAL

Install new precast concrete splash blocks

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO: DESCRIPTION OF WORK ITEM

Remove ixisting roof drain and strainer and install new roof drain assembly and strainer.

Replace existing curb unit for existing roof mounted equipment with new custom fabricated and prefinished curb unit.

Remove existing gutter and install new gutter (or install where missing).

Approximate size 5"-6" wide.

Remove existing downspout and install new downspout (or replace where

3019 24500 SF

TOTAL

Paint exposed to view exterior surfaces of replaced or existing wood, plywood, hardboard, or metal.

ESTIMATED

QUANTITY UNIT

UNIT

PRICE

ITEM

NO: DESCRIPTION OF WORK ITEM

File details come from the government source that posted it. Updated .