2. Attachment - MFR - Commercial Fans Purchase and Install Fans B819 Sig.pdf
PDF 4 MB Posted
- Attached to
- Commercial Fan Purchase and Install
- Solicitation number
- FA301625Q6172
About this file
This document is a Department of the Air Force memorandum from the 802D Civil Engineer Squadron (CE) regarding a technical compliance validation for ventilation installation in Building 819 at Joint Base San Antonio (JBSA) Lackland. The memorandum, dated July 8, 2025, confirms that after several site visits, CE determined there will be no interference with fire suppression systems or electrical conduit runs during the new fan installation. The document includes photographs documenting the ventilation installation project (KELL244273) scheduled for December 20, 2024, showing the interior of the facility, electrical panels, and structural details. The photos reveal an industrial space with metal framework, lighting, and an American flag, and include close-up images of the electrical distribution panel and circuit breaker board, indicating careful documentation of the project's technical aspects and readiness for implementation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
502D AIR BASE WING JOINT
BASE SAN ANTONIO
MEMORANDUM FOR 502 CONS/JBKAD and JBKAC July 8, 2025
FROM: 802D CES/CENMPLA
1555 GOTT STREET B5595
JBSA LACKLAND, TEXAS 78236-5645
SUBJECT: Validation of Technical Compliance Building 819 BAF Installation
1. CE has conducted several site visits and come to the determination that the Fire Suppression and the Electrical conduit runs will NOT interfere with the installation of the new fans. There is ample space within the Electrical Panels and electrical supply. The National Fire Protection Agency Code requires the fans to be inter-locked with the fire protection/suppression system to turn off in the event of an alarm.
DOUGLAS SMITH, 802D CENMPLA
Chief, Quick Execute Element
Mission ~ Wingman ~ Partners
KELL244273 - Install Ventilation B819 - 20 December 2024 - PHOTOS