This Statement of Work details a retrofit project for metal halide ceiling fixtures at JBSA Kelly Annex Building 896. The project requires replacing eleven 400-Watt Metal Halide ceiling light fixtures with 120W/150W LED Corn bulbs (22,200 Lumens, 5000K, E39 base) located 40 feet above the floor. The contractor must remove existing lamps and ballasts, install new porcelain lamp sockets, and connect directly to existing line voltage, using a lift to access the fixtures.
The project is part of a Department of the Air Force solicitation (FA301625Q0127) with a 90-calendar day performance period, operating during normal duty hours (7:00 AM to 5:00 PM, Monday-Friday). The contractor must submit a progress schedule within 7 days of award, comply with safety regulations, and provide a one-year warranty on materials and workmanship. Project contacts are Rolando Villarreal (210-862-0476) and Victor Reyna (210-831-1150) from 502 CES, with daily inspections and a final project review to ensure compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 25, 2025
STATEMENT OF WORK
RETROFIT METAL HALIDE CEILING FIXTURES WITH LED LAMPS JBSA B896 KELLY ANNEX
PROJECT SCOPE: The contractor shall furnish all personnel; labor, transportation, materials/parts, tools, incidentals, equipment, and any miscellaneous parts/items. Retrofit eleven 400-Watt Metal Halide ceiling light fixtures with equivalent LED lamps. A lift will be required to reach the lights that are 40ft above the floor. Lift will need to navigate through existing equipment and through carpet hallway, standard door openings and rollup door.
PROJECT DESCRIPTION:
1. Remove existing 400W Metal Halide lamp, disconnect and remove existing ballast. LED lamp must be rated to existing line voltage. Connect lamp socket directly to existing light fixture line voltage
2. Replace existing mogul base E39 lamp socket with new E39 porcelain type lamp socket
3. Install 120W/150W LED Corn bulb - 22,200 Lumens – 5000K - E39 base lamp
4. LED lamp must be enclosed fixture rated and dimmable
PROJECT LOCATION: JBSA Kelly Annex Building 896
PERIOD OF PERFORMANCE: 90 calendar days for Project to be complete.
HOURS OF WORK: Normal duty hours are from 7:00 Am to 5:00 PM, Monday thru Friday, except on government holidays. Contractor should coordinate work with 502 CES Project Manager Representative PROJECT SCHEDULE PLAN: Contractor shall send a progress schedule plan and mobilize plan of start date and completion date 7 days after it’s been awarded.
INSPECTION AND ACCEPTANCE: A representative from 502 CES will conduct daily inspections of work progress. A final inspection of completed work will be conducted by the project manager, contractor and designated 502 CES personnel. All discrepancies identified during inspections shall be corrected prior to final payment.
CONTRACTOR’S WARRANTY: The contractor shall guarantee all materials and workmanship for a period of one year from the date of project completion. Correction of all defects under this warranty shall be at the expense of the contractor.
PROJECT POINT OF CONTACT: Project Manager Rolando Villarreal Mobile Number 210-862-0476 or Victor Reyna Mobile Number 210-831-1150
SAFETY: The contractor shall comply and performed in accordance with the Department of Labor, OSHA and all Federal, State and local rules and regulations.
OUTAGES: Not Required / If required Need 30-day notice.
SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt and or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/or adjacent to the site shall always remain free of project generated trash and debris.
GOVERNMENT FURNISHED SERVICES: The government will provide emergency, fire, and security police response.
POLICE PROTECTION: The 802nd Security Forces Squadron shall provide security and law enforcement response and services to the contractor.
FIRE PROTECTION: The JBSA Randolph Fire Departments shall provide initial response, EMS, and fire protection services to the Contractor.
TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations.
DAILY CLEANING: The Contractor shall always keep the site free from debris and shall perform daily cleaning of all areas. The Contractor shall collect all trash, debris, refuse, garbage, etc., that is generated and place it in appropriate containers with lids or approved covers on a periodic basis. The materials shall be hauled from the site by appropriate means daily, unless otherwise approved by the designated Planning Technician. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to the Facility Manager.