Attachment 1 Performance Work Statement Amend 001.pdf

PDF 432 KB Posted

Attached to
Restroom Trailer Service Federal contract opportunity
Solicitation number
FA301624U0049
Issued by
Department of the Air Force Air Education and Training Command

About this file

This performance work statement outlines cleaning and maintenance services required for two restroom trailers located at Joint Base San Antonio in Texas. The contractor shall provide all labor, materials, equipment, transportation, and supervision to clean and maintain the trailers for a four month period according to the schedule in Appendix A. Services include completely emptying and refilling fresh water and waste tanks, cleaning all surfaces, stocking supplies weekly, and maintaining floors free of debris. The contractor must respond to additional maintenance requests within four hours and comply with all base security, safety, and environmental regulations. The government will provide electricity to the trailers and emergency services. The solicitation was issued by the Department of the Air Force Air Education and Training Command for these cleaning services at Joint Base San Antonio in accordance with the terms defined in the attached performance work statement and appendices.

View the file

Other files for this federal contract opportunity

Other files attached to Restroom Trailer Service, newest first.
File Type Posted
Combined Synopsis Solicitation Amend 001.pdf PDF
Questions and Answers Amend 001.pdf PDF
Combined Synopsis Solicitation.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
Attachment 2 WD 2015-5253 Rev 22.pdf PDF
Attachment 3 Provisions and Clauses.pdf PDF
Attachment 4 Schedule of Supplies or Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301624U0049

Amendment 001

PERFORMANCE WORK STATEMENT

MAINTENANCE OF GOVERNMENT

OWNED LATRINE TRAILERS

JOINT BASE SAN ANTONIO TEXAS

1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, tools, materials, equipment, transportation, and supervision to maintain Government owned latrine trailers at Joint Base San Antonio (JBSA) for four months, Texas Camp Bullis and

Randolph. The number of units and service frequencies for each location are provided within this Performance Work Statement (PWS) at Appendix A, Government Owned

Latrine Trailers.

1.1. Cleaning, Maintenance or Replacement Requirements The contractor is responsible for whatever is necessary to keep two Government owned latrine trailers operational including cleaning/maintenance and possible replacement of parts. Each unit has a fresh-water tank capacity of 175 gallons and a waste-water tank capacity of 275 gallons.

During cleaning service, the contractor shall completely remove the contents from the waste tank, refill the freshwater tank with fresh water provided by the contractor, clean the interior of the restroom, restock supplies in accordance with paragraphs 1.2. – 1.2.2., empty all trash cans, and place clean trash can liners. Price includes all costs for disposal of waste materials off the installation at an approved facility in accordance with all applicable federal, state, and local regulations.

1.2. Cleaning. All surfaces of sinks, toilets, urinals, dispensers, plumbing fixtures, mirrors, walls, entry doors (including handle, kick plates, ventilation grates, metal guards) and other such surfaces shall be cleaned and disinfected using a germicidal detergent. Restrooms shall have a clean scent or no odor at all. Toilets and urinals will be free of spots, water spots, scale buildup, soap scum, odors, and any other deposits. Mirrors shall be clean and have no streaks or other removable matter. Restroom sinks, countertops, and fixtures shall be free from water and scale deposits, soil, streaks, and removable matter.

1.2.1. Stock Restroom Supplies. Contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, paper towels, seat covers, and hand soap do not run out. Additional supplies shall be stored in designated areas to allow customer to refill dispensers between contractor provided services.

1.2.1.A. Four (4) Rolls of toilet paper, Two (2) refill cartridges of paper towels, and One

(1) refill cartridge hand sanitizer, replaced weekly should suffice. We are NOT requesting seat covers.

1.2.2. Restroom Floor Care. All floor spaces shall be maintained free of grit, soil, dust, scuff and heel marks, stains, spills, debris, litter, and other foreign matter by effective routine cleaning. Cleaning shall be accomplished by the most appropriate method (sweep, dust mop, damp mop, spot clean, etc.) and with cleaning solutions for the specific floor type. After cleaning, floor surfaces shall have a uniform, clean appearance without streaks, swirl marks, detergent residue or any evidence of soil, stain, film, or standing water.

Baseboards, corners, and wall/floor edges shall also be clean.

1.3. Scheduling. All Government owned trailers shall be maintained/serviced as defined in paragraphs 1.2. – 1.2.2 and Appendix A of this PWS. The contractor shall provide a written, monthly schedule (to include dates and approximate times) for the maintenance and cleaning of all latrine trailers to the Government point of contact, within ten business days after the start of the contract. Units shall be cleaned according to the frequencies listed on the appendix.

1.3.1. Additional Maintenance or Service. The contractor shall respond and provide maintenance and/or service to latrines as required and identified by the Government point of contact.

2.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

2.1 Government Furnished Facilities. None.

2.2 Government Furnished Supplies and Equipment. See Appendix A

2.3. Government Furnished Utilities. The Government will provide electricity to the

Government owned trailer latrines. Contractor shall be responsible for providing hook up to the provided power sources.

2.4 Security, Fire and Medical Services. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

3. GENERAL INFORMATION.

3.1. Hours of Operation. The contractor shall provide services during the following hours: 7:30 a.m. to 4:15 p.m. Monday through Friday, except for federal holidays. The contractor shall provide the government with phone number(s) where they can be contacted to respond to service calls within four hours.

3.2. Contractor Representative. The contractor shall provide a point of contact that shall be responsible for the performance and coordination of all work. The name and telephone numbers of this person and alternate(s) shall be designated in writing to the CO within five working days after contract award.

3.3. Traffic Laws. The contractor and their employees shall comply with base traffic regulations at all times.

3.4. Security Requirements: The Contractor shall comply with AFI 10-245, Air Force

Antiterrorism Standards, paragraph 2.17.3 and all installation security policies. These regulations are available for review at http://www.e-publishing.af.mil/. Security and base access requirements are contained in clause AFFARS 5352.242-9000 “Contractor Access to Air Force Installations.”

3.4.1. Contractor employees will be required to obtain and display identification badges.

Anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice. All Contractor personnel working on JBSA must have a completed background check prior to being employed on JBSA and must have a http://www.e-publishing.af.mil/

Government issued Contractor I.D. badge IAW paragraph 4.5 of this PWS.

3.4.2. The Contractor shall also obtain personnel identification badges as required for entry to the installation. The Government will provide all forms and procedures to the contractor to obtain personnel identification and vehicle passes during the pre-performance conference. The contractor shall provide the CO with a current list of employees needing access within 3 working days after receiving award or Notice of Award. The list shall include employee’s name, date of birth, state driver’s license/state ID number and state of issue. Within 10 business days after Government submits the list to the JBSA Security

Office(s), the Government will notify the contractor that installation access passes are available for those employees clearing the criminal history check. The duration of any pass issued will not exceed one year or the duration of the contract, whichever is shorter.

Contractor personnel and property shall be subject to search and seizure upon entering the confines of JBSA installations, while on JBSA installations and upon leaving the confines of JBSA installations.

3.5. Personnel: The Contractor shall not employ any person who is an employee of the

United States Government, or the Department of Defense (DOD), either military or civilian, if such employment would create a conflict of interest, or be contrary to the policies contained in the DOD Joint Ethics Regulation, DOD 5500. 7-R.

3.5.1. The government is authorized to restrict the employment under this contract of any contractor employee, or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of this installation and its population.

3.5.2. Contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name.

3.5.3. Contractor personnel performing work on electrical systems shall be qualified as defined by National Fire Protection Association (NFPA) 70 and 70E, National Electrical

Code (NEC) 2017 and Occupational Safety and Health Administration (OSHA) standards/directives. Contractor personnel performing plumbing work shall be at least a

Journeyman or Apprentice plumber.

3.6. Safety Requirements. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements and follow all Air Force Safety regulations.

3.6.1. The contractor shall also provide a verbal notification to the CO within 2 hours of any occurrence of damage to Government property or 2 hours of any accident resulting in death, injury, occupational disease, or adverse environmental impact. In addition, the

Contractor shall also provide a completed written copy of the required Accident

Investigation Reports to the CO within five calendar days of each occurrence.

3.6.2. The contractor shall provide for the safety and well-being of personnel employed in the administration of this contract. The contractor shall comply with the provision of AFI

90-801, Environmental, Safety and Occupational Health. Contractor personnel shall wear all safety items as required by the OSHA during the performance of tasks requiring protective equipment or clothing.

3.6.3. Unless otherwise specified in this contract, the contractor shall obtain all necessary permits, licenses, and certifications; give all required notices; and comply with applicable federal, DOD, Air Force, state, county, and local laws, codes, and regulations in performance of the requirements of this contract. Maintain records of such requirements and make the documentation available to the Government for review. The contractor will be responsible for all OSHA, State, environmental, fire hazard, chemical, fuel spills, and/or fines that occur as a result of company negligence.

3.7. Environmental Control/Compliance. The contractor shall comply with all applicable federal, state and local environmental laws and with San Antonio Water System (SAWS) regulations.

3.7.1. Contractor personnel shall have all required licenses and permits necessary to perform services and disposal prior to the performance of any work on this contract

(includes San Antonio Water System Liquid Waste Hauler permit, Texas Commission on

Environmental Quality Sludge Transporter Registration). The contractor shall not use any ozone depleting substances or products. The contractor shall not pollute lakes, storm lines, sewer lines or wells with fuels, oils, bituminous, calcium chloride, acid, contraction wastes or other harmful materials.

3.7.2. The contractor shall be knowledgeable of and comply with all local, state, and federal rules, laws, and regulations related to spillage.

3.8. Contract Monitoring. Upon award, the Contracting Officer will identify the customer representative who will inspect and monitor these services to ensure services are being performed in accordance with the contract and PWS.

3.9. Damages. The contractor shall take precautions to prevent damage to Government property. The contractor shall repair (to include ruts) or replace damaged items at no additional cost to the Government.

3.10. Continuity of Operations During Crisis Situation. According to DFARS 252.237-

7023, Continuation of Essential Contractor Services, this service does not meet the definition of “essential contractor service” or “mission-essential function” and therefore, shall not be performed during a crisis situation.

4.0 Appendices.

Appendix A – Government Owned Restroom Trailers

Appendix B – Photographs

Appendix A

Government Owned Restroom Trailers

INSTALLATION

LOCATION

NO. OF

UNITS

CLEANING

FREQUENCY

TANK

FREQUENCY

Camp Bullis

Main Entry Control Point 1 ONCE

WEEKLY

ONCE

Randolph

South Gate 1 ONCE

WEEKLY

ONCE

Appendix B

Photographs

File details come from the government source that posted it. Updated .