SF30 Amendment 0003 RFQ FA301622U0214.pdf
PDF 135 KB Posted
- Attached to
- MEDCoE Commercial WiFi Federal contract opportunity
- Solicitation number
- FA3016-22-U-0214
About this file
This is a request for quotation for commercial WiFi services and installation at Joint Base San Antonio-Fort Sam Houston facilities. The solicitation seeks quotes to provide and install commercial internet subscriptions at buildings 1394 and 2841 as specified in the attached statement of need. Quotes are due August 3rd, 2022 and award will be made to the lowest priced technically acceptable vendor. The requirement is set aside for small businesses. Technical acceptability will be determined based on the vendor's ability to meet the specifications in the statement of need. Pricing should be provided using the schedule of supplies. The selected vendor must complete installation within 90 days of award. Incumbents providing circuits to the buildings include Lumen, AT&T, and Spectrum. The site visit will take place on July 21st and access requests are due by July 19th. The soliciting agency is the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Atch 3 SOW - Updated 13 Jun 18.pdf |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| ADP99CB.tmp |
| 1.0 Background cover sheet or appendix |
| 2.0 Scope |
| 3.0 Description of Services |
| 3.1 General Services |
| 3.2 Design Services |
| 3.3 Product Markings/Documentation/Tools |
| 3.4 Delivery Services |
| 3.5 Installation and Removal Services |
| 3.6 Inspection/Acceptance Checklist |
| 4.0 Product |
| 4.1 Monolithic Panels and Components |
| 4.2 Stackable Panels and Components |
| 4.3 Modular Furniture |
| 4.4 Demountable Walls |
| 5.0 Government Furnished Property/Support |
| 6.0 Site Conditions |
| 7.0 Additional Services Information |
| 8.0 Quality Assurance |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Reporting Requirements |
| 12.0 Deliverables (CDRLs) |
| 13.0 Services Summary |
| 14.0 Attachment 1 – Inspection/Acceptance Checklist |
| Statement of Work Revised 18 June 19.pdf |
| 1. Purpose |
| 2. Scope |
| 3. Requirement Description |
| 4. Safety Requirements. |
| The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements. |
| 5. Site Coordination. |
| 6. Confined Space. |
| 7. Accident/Incident Reporting and Investigation. |
| 8. Work Area(s). |
| 9. Traffic control. |
| 10. Security Requirements. |
| 10.1 Security Clearances. |
| 11. Environmental Management. |
| 13. Quality Assurance. |
| 14. Contractor Personnel. |
| 14.1 Project Management. |
| 14.2 Site Point of Contact (POC). |
| 14.3 Personnel Requirements. |
| 15. Warranty. |
| 16. Manuals and Practices. |
| 17. Network Services and Solutions |
| 17.1 Network Infrastructure |
| Site Preparation and Installation Activities |
| 17.2 Requirements Analysis and Conceptual Design |
| 17.3 Installation Schedules. |
| 17.4 Site Preparation |
| 17.5 Pre-Installation Briefing |
| 17.6 Government Support |
| 17.7 Installation |
| 17.8 Manuals and Practices. |
| 17.10 Labeling. |
| 17.11 Grounding. |
| 17.12 Cable Terminations. |
| 18. Inside Plant Requirements. |
| 18.1 Measurements. |
| 18.2 Tools and Testing Support |
| 18.3 Test and Acceptance/Installation Test Plan. |
| 18.4 Testing. |
| 19. In-progress Testing. |
| 19.1 Fiber Optic Tests. |
| 19.2 Optical Attenuation. |
| 19.3 Distance. |
| 19.4 Acceptance/Installation Test Report. |
| 19.5 Final Acceptance. |
| 20. General Requirements |
| 20.1 Tools and Test Equipment |
| Statement of Work Revised 18 June 19.pdf |
| 1. Purpose |
| 2. Scope |
| 3. Requirement Description |
| 4. Safety Requirements. |
| The contractor shall remain in compliance with all Federal, State, county, and JBSA-Randolph security and safety laws, regulations, policies, and requirements. |
| 5. Site Coordination. |
| 6. Confined Space. |
| 7. Accident/Incident Reporting and Investigation. |
| 8. Work Area(s). |
| 9. Traffic control. |
| 10. Security Requirements. |
| 10.1 Security Clearances. |
| 11. Environmental Management. |
| 13. Quality Assurance. |
| 14. Contractor Personnel. |
| 14.1 Project Management. |
| 14.2 Site Point of Contact (POC). |
| 14.3 Personnel Requirements. |
| 15. Warranty. |
| 16. Manuals and Practices. |
| 17. Network Services and Solutions |
| 17.1 Network Infrastructure |
| Site Preparation and Installation Activities |
| 17.2 Requirements Analysis and Conceptual Design |
| 17.3 Installation Schedules. |
| 17.4 Site Preparation |
| 17.5 Pre-Installation Briefing |
| 17.6 Government Support |
| 17.7 Installation |
| 17.8 Manuals and Practices. |
| 17.10 Labeling. |
| 17.11 Grounding. |
| 17.12 Cable Terminations. |
| 18. Inside Plant Requirements. |
| 18.1 Measurements. |
| 18.2 Tools and Testing Support |
| 18.3 Test and Acceptance/Installation Test Plan. |
| 18.4 Testing. |
| 19. In-progress Testing. |
| 19.1 Fiber Optic Tests. |
| 19.2 Optical Attenuation. |
| 19.3 Distance. |
| 19.4 Acceptance/Installation Test Report. |
| 19.5 Final Acceptance. |
| 20. General Requirements |
| 20.1 Tools and Test Equipment |
| topmostSubform[0]: |
| Page1[0]: |
| IDCode[0]: |
| Page[0]: 1 |
| Pages[0]: 1 |
| AmendNo[0]: 0003 |
| EffDate[0]: 02 Aug 2022 |
| ReqNo[0]: |
| ProjNo[0]: |
| IssCode[0]: FA3016 |
| IssuedBy[0]: 502 CONS/JBKBA |
395 B STREET WEST, SUITE 2, BLDG 224
JBSA RANDOLPH AFB TX 78150-4525
| AdmCode[0]: FA3016 |
| AdminBy[0]: SEE BLOCK 6 |
| ContName[0]: |
| ContStrt[0]: |
| ContCnty[0]: |
| ContSt[0]: |
| ContZIP[0]: |
| Code[0]: |
| FacCode[0]: |
| SolChgYs[0]: Yes |
| SolChgNo[0]: Off |
| SolAmdNo[0]: SAM.gov RFQ#FA301622U0214 |
| AmendDate[0]: 15 July 2022 |
| ModNo[0]: |
| ModDate[0]: |
| NoCopies[0]: 1 |
| Amended[0]: Yes |
| OffrExt[0]: Off |
| OffrNoEx[0]: No |
| ApprData[0]: |
| ChgeOrd[0]: Off |
| ChgeOrder[0]: |
| Modify[0]: Off |
| SuppAgre[0]: Off |
| SuppAuth[0]: |
| ModOthr[0]: Off |
| OthrSpec[0]: |
| NoReq[0]: Off |
| Require[0]: Off |
| Copies[0]: |
| Descript[0]: The purpose of this amendment is to: |
- provide the answer to the following question.
Q: What providers currently have a circuit in 2225?
A: Lumen, AT&T, and Spectrum are in the DEMARC, and Spectrum also has coax coming into 2840.
POC: Sharla Blalock, sharla.blalock@us.af.mil
| SignName[0]: |
| SignTitl[0]: |
| ContDate[0]: |
| CoName[0]: |
| CoTitle[0]: |
| CODate[0]: |
| 2022-08-02T09:28:26-0500 | |
| DELGADO.DAVID.ALVAREZ.JR.1130168236 |
File details come from the government source that posted it. Updated .