FA301622B0001 Repair Schofield Road Q and A Govt Response 45 to 47.pdf

PDF 413 KB Posted

Attached to
REPAIR SCHOFIELD ROAD -JBSA FORT SAM HOUSTON, TX
Solicitation number
FA301622B0001
Issued by

About this file

This document contains a government file related to a federal contract opportunity for repair work on Schofield Road at Joint Base San Antonio Fort Sam Houston in Texas. The opportunity is set aside for women-owned small businesses and involves lime stabilizing the subgrade and base course, with portland cement stabilization required for the base course. Binder course for base repair sections must be Type B asphalt. The estimated value of the contract is between $1 million and $5 million. Offerors must submit electronic bids and cost proposals in RS Means format by the closing date.

The file includes questions and answers clarifying that both subgrade and base course stabilization are required, as well as confirming the asphalt type for binder courses. Eligible women-owned small businesses are invited to respond with electronic bids and cost proposals by the specified closing date to be considered for this contract to repair Schofield Road at Joint Base San Antonio Fort Sam Houston in Texas.

View the file

Other files

File Type Posted
FA301622B00010004 AMENDMENT 0004.pdf PDF
FA301622B0001 Repair Schofield Road Q AND A 2.pdf PDF
Attachment 1 Revised SOW and Specifications dated 23Jun2022.pdf PDF
Attachment 14- Appendix. G - Union Pacific ROW.pdf PDF
Attachment 13 -Appendix F - Rideshare Req..pdf PDF
Revised Attachment 11 - Section L Rev06Jun2022.pdf PDF
Revised Attachment 1 SOW and Specifications 6 Jun 22.pdf PDF
Revised Attachment 2 -Appendix A - Schofield Rd Site Map.pdf PDF
Solicitation Amendment FA301622B00010003 SF 30.pdf PDF
FA301622B00010002.pdf PDF
Rideshare Requirements.pptx PPTX presentation
FA301622B0001 REPAIR SCHOFIELD ROAD Questions and Answers Goverment Response 45 to 47 REVSION 1 27MAY22.pdf PDF
Attachment 11 - Section L.pdf PDF
FA301622B0001 Repair Schofield Road QA - Govt Response 18May2022.pdf PDF
Attachment 1 SOW and Specifications REVISED 16 May 22.pdf PDF
Solicitation Amendment AMENDMENT 0001 FA301622B00010001 .pdf PDF
SITE VISIT SIGN IN SCHOFIELD.pdf PDF
Attachment 11 - Section L (1).pdf PDF
Attachment 12 - Section M.pdf PDF
Attachment 8-Climatology Report 2022-2021.pdf PDF
Attachment 7-Wage Determination.pdf PDF
Attachment 1- SOW and Division 01 Specifications 19 APR 22.pdf PDF
Solicitation - FA301622B0001.pdf PDF
Attachment 10- Construction Cost breakdown.xlsx XLSX spreadsheet
Attachment 9 -1354 15feb22.pdf PDF
Attachments 2-6 Apdix A-Ezip.zip ZIP file
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS 45-47

45) To confirm specification to lime stabilize the subgrade, typically we lime stabilize the base course and not the subgrade?

Government Response: Statement of Work indicates stabilization of base course and subgrade are required. See page 13, para 1.3.1.14.

46) Will geogrid be required for the subgrade if the prior question is to lime stabilize the base course?

Government Response: Per the SOW; Portland Cement-Stabilization is required for the base course stabilization. SEE UFGS specification 32 11 33.13

47) Will the 3” binder course for the base repair sections be required to be Type B asphalt?

Government Response: Please refer to Question 34, of the Government Response to the Q&A.

File details come from the government source that posted it. Updated .