FA301621R00170001 SF 30.pdf

PDF 589 KB Posted

Attached to
Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
Solicitation number
FA301621R0017
Issued by
Department of the Air Force Air Education and Training Command

About this file

This solicitation seeks proposals for a Multiple Award Construction Contract (MACC) Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide various construction services for Joint Base San Antonio and support for Laughlin AFB and Goodfellow AFB. The Air Force expects to award approximately twelve contracts under a total small business set-aside for NAICS code 236220, with a total program ceiling of $990 million over ten years. Services will include maintenance, sustainment, repair, and alteration projects for real property and facilities. Task orders will be issued on a firm-fixed-price basis and follow the contract line item structure. The Construction Wage Requirement will apply to task orders over $2,000. Offerors must submit proposals in response to task order solicitation by the specified due dates to be eligible for consideration.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ, newest first.
File Type Posted
Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021).pdf PDF
FA301621R00170001 - Conformed Solicitation.pdf PDF
Attachment 16 - Past Performance Information Sheet_Aug2021.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 20Aug2021.docx DOCX document
QA Session for FA301621R0017_08202021.pdf PDF
Attachment 13 - DB Experience Project Reference_Aug2021.pdf PDF
Attachment 1 - SOW Dated (Rev 20 Aug 2021).pdf PDF
Attachment 15 - Quality and Satisfaction Survey_Aug2021.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev20Aug2021.docx DOCX document
Attachment 3 - Contract Insurance Compliance Notification.pdf PDF
Attachment 12 - Proposal Completeness Checklist - 17MAY2021.docx DOCX document
Attachment 17 - Teaming Experience Matrix.docx DOCX document
FA301621R0017.pdf PDF
Attachment 1 - SOW dated 20Aug2020_Revised MACC Specifications 6Jun2021.pdf PDF
Attachment 8 - Progress Payment Request.xlsx XLSX spreadsheet
Attachment 16 - Past Performance Information Sheet.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 01July2021.pdf PDF
Attachment 2 - Contract Progress Schedule (AF 3064).xls XLS spreadsheet
Attachment 5 - RFI Template V2.pdf PDF
Attachment 6 - Contract Progress Report (AF 3065).pdf PDF
Attachment 7 - Material Approval (AF3000).pdf PDF
Attachment 10 - Base Access Request Form.pdf PDF
Attachment 11 - SF1413.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev 01July2021.pdf PDF
Attachment 4 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 9 - Warranty Call Worksheet.pdf PDF
Attachment 13 - DB Experience Project Reference.pdf PDF
Attachment 14 - Solicitation Exceptions.docx DOCX document
Attachment 15 - Quality and Satisfaction Survey.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate the following into the solicitation and Block 14 (Description of Amendment/Modification):

resulting contract:

1) The due date for proposals on box 13 has been extended to 1:00 p.m. local time on Monday, September 13, 2021.

2) The Multiple Award Construction Award (MACC) Ordering Guide at Section G of the solicitation was modified to remove all reference to RS Means requirements (see paragraph D).

3) The following attachments at Section J have been updated, will supersede any previous versions, and should be used in the proposal preparation.

(a) Attachment 1 - SOW Dated (Rev. 20 Aug 2021)

(b) Attachment 13 - DB experience Project Reference (Rev. Aug 2021)

(c) Attachment 15 - Quality and Satisfaction Survey (Rev. Aug 2021)

(d) Attachment 16 - Past Performance Information Sheet (Rev. Aug 2021)

(e) Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021)

(f) Attachment 18 - Section L Instructions to Offerors (Rev. 20 Aug 2021)

(g) Attachment 19 - Section M Evaluation Factors for Award (Rev. 20 Aug 2021)

No other changes to the solicitation have been incorporated.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 06 Sep 2021 13 Sep 2021

Section G - Contract Administration Data

Miscellaneous text in this section has been modified to:

FUNDING

Funding will be provided at the Task Order level.

A. Unfunded Requirements. Offerors are cautioned that the Government may request proposals with no assurance of funding and provides no assurance that orders will be issued; in the event a TOPR is issued for unfunded requirements a notice to offerors will be included.

B. Non-Appropriated Funds (NAF). Task Orders that make use of NAF will be identified at the TOPR; the NAF GENERAL PROVISIONS and procedures at Section H Special Contracting Procedures will apply to those respective TOs.

C. The following payment instructions are applicable for any task orders issued under this program:

PAYMENT INSTRUCTIONS:

The payment office shall allocate and record the amounts paid to the accounting classification citations in the contract using the instructions posted at https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/current/PGI204_71.

htm#payment_instructions.

MULTIPLE AWARD CONSTRUCTION AWARD (MACC) IDIQ ORDERING GUIDE

During the ordering period of this IDIQ, the Government will implement the process set forth to develop and

FA301621R00170001

issue TOPRs for performance under this IDIQ. The procedures for selecting contractors for order awards under this contract are governed by FAR 16.505 and supplements. Unless otherwise specified in a Task Order Proposal Request (TOPR), the following guidance defines the process by which fair opportunity will be afforded, how Task Order (TOs) will be processed and priced, and how a TO will be awarded.

A. General Information Orders processed under this IDIQ contract will be decentralized meaning installation Contracting Officers (ordering Contracting Officer (CO)) will solicit IDIQ holders for local requirements and administer the resulting orders. Orders may only come from Contracting Officers assigned to Joint Base San Antonio, Laughlin AFB, or Goodfellow AFB to be performed at those installations. Contracting Officers may solicit task order proposal requests (TOPRs) for real property maintenance, repair, alteration construction at Joint Base San Antonio (JBSA) Texas, including Lackland, Ft. Sam Houston, Randolph, Camp Bullis, Canyon Lake, Seguin Auxiliary Field, Medina Annex (Chapman Annex), Port Annex, Kelly Field Annex, Medical Center Annex and Grayson Street Annex.

Each Contractor is required to submit a response/proposal to all TOPRs. Contractors are not obligated to propose on all TOs; however, they are required to contact the Contracting Officer prior to the proposal due date if they cannot participate in the walk through or submit an offer. Failure to provide this notification may impact future consideration for TOPRs or lead to off-ramping from the IDIQ. If a Contractor is below 80% and not submitting a proposal for a TOPR, a brief written statement as to why the Contractor is unable to provide a proposal shall be submitted to the contracting officer. Failure to meet the 80% participation rate will be considered in the Government's evaluation of the Contractor's performance (Note: participation in the performance of Task Orders at Laughlin AFB or Goodfellow AFB will not be counted against the 80% participation requirement); please refer to paragraph M.

TOPRs for proposals will indicate funds availability. Orders shall be issued on a Firm-Fixed Price (FFP) basis.

The Contract Line Item Number (CLIN) structure on each order will reflect the FFP for each line item, and must strictly follow the CLIN structure outlined in the IDIQ contract.

If the Contractor believes it was not fairly considered for a particular order, the Contractor may present the matter to the Contracting Officer. The Contractor may appeal the explanation of the Contracting Officer's decision to the corresponding Ombudsman for the agency. The Ombudsman will review the Contractor's complaint and, in coordination with the Contracting Officer, ensure that the Contractor was afforded a fair opportunity to be considered for a Task Order. The DO ombudsman is responsible for reviewing complaints from multiple award contractors and ensuring that all of the contractors are afforded a fair opportunity to be considered for TOs in excess of $3,500 consistent with procedures in the contract. However, it is not within the designated TO/DO contract ombudsman's authority to prevent the issuance of an order or disturb an existing order. This clause does not guarantee the contractor issuance of any TO above the minimum guarantee stated in the MACC ID/IQ contract.

B. Task Order Procedures As the need exists for performance under the terms of this contract, the Contracting Officer will notify each prime contractor in the Active Pool of an existing requirement with a Task Order Proposal Request (TOPR), unless the Contracting Officer determines that an exception to Fair Opportunity applies. FFP Task Orders will be awarded hereunder within the scope of the terms and conditions and specifications of this contract IAW FAR 16.505, the fair opportunity principles at FAR 16.505(b), and DFARS 216.505. The contractor shall submit a proposal IAW the Task Order SOW or specifications specified by the Contracting Officer in the individual Task Order RFP. The relative importance of selection criteria may vary among task order requirements, and will be identified in each TOPR.

Contractors MAY be ineligible from award on individual Task Orders if prior to TO Award any of the following conditions apply at the Government's discretion:

(a) The Contractor is more than 15% behind schedule on any active Task Orders (barring those that are behind due to acts beyond the contractor's control or negligence).

(b) If the Contractor has unfavorable CPARS rating on any Task Orders within the previous calendar year.

C. Task Order Proposal Request (TOPR) Process Order competition for all future requirements beyond the minimum guarantee Task Order will be initiated by issuance of a Task Order Proposal Request (TOPR). Costs for preparation of proposals and pre-award activities shall be the sole responsibility of the contractor. Contractors will not be reimbursed for attendance during negotiations, site visits, walk-throughs, or any other pre-award activities/expenses.

1. The TOPR will be issued to all awarded contractors under this IDIQ to perform the required Design-Bid Build or Design-Build Construction projects. Terms and conditions of that task order, to include proposal preparation instructions, period of performance, tailored SOW/specifications, and proposal due date will be specified in the TOPR. All contract clauses contained in the IDIQ shall be considered incorporated in each proposal request unless otherwise specified in the TOPR and resultant Task Order. If conflict exist between the contract clauses and the information contained in the TO, the IDIQ language shall take precedence.

2. The TOPR shall include at minimum the following documents:

(a) Description of the specified work required.

(b) Task Order tailored SOW to identify specific requirements and specifications.

(c) Location of the work

(d) Period of Performance.

(e) Maximum proposal response time.

(f) Bonding Requirements

(g) Any other pertinent information for the contractor.

(h) If a site visit is scheduled, the TOPR shall identify the specific schedule and limitations.

(i) All TOPR and resultant TO issued under this contract shall incorporate the clauses contained in the contract.

Language incorporated in the contract and contract clauses takes precedence in the event of conflict for clauses incorporated in the TO.

3. All Contractors are highly encouraged to submit a proposal for every TOPR under this contract. If no proposal or only one proposal is received, the Government, at its discretion, may revalidate the TOPR requirement. The validation process may include communication with some or all the Contractors to determine whether there are concerns about the TOPR requirement. Should the requirement be validated, the ordering CO may reissue the TOPR package. After the Government revalidates the TOPR requirement and if only one proposal is received, the ordering CO must follow the procedures at DFARS 215.371.

4. Any questions pertaining to the TOPR package shall be submitted to the ordering CO in writing within three

(3) business days of TOPR issuance date. In the event issues pertaining to a TOPR package cannot be resolved to the satisfaction of the ordering CO, the ordering CO reserves the right to withdraw or cancel the proposed TOPR package. In such event, Contractors will be notified, via letter or email, of the ordering CO's decision, and the decision shall be final and conclusive and shall not be subject to the "Disputes" clause or the "Contract Disputes Act".

D. Pricing of Task Orders The Contractor's proposal shall be submitted to the ordering CO on or before the time and date specified in the TOPR letter.

1. Pricing on task order proposals shall be valid for 120 calendar days after the required submission date unless otherwise noted in the TOPR. Task Orders that exceed the threshold at 15.403-4 are subject to Certified Cost or Pricing Data. Other than certified cost or pricing data will be required to support all other proposals.

2. Task Order Proposals. Proposal shall include one electronic copy in Microsoft Excel using the TOPR Construction Cost Estimate Breakdown Template, (Attachment 4) identified in the ordering guide to lend themselves for review and analyses by the Government. Therefore, the Excel spreadsheets must not be submitted in Portable Document Format (PDF) or with locked spreadsheet cells.

3. For task order requiring design efforts (i.e. Design-Build requirements), the price for fee for the production and delivery of designs, plans, drawings, and specifications cannot exceed 6% of the estimated construction as imposed by 10 U.S.C 2306(d) and 41 U. S.C. 254(b) excluding those for requirements funded using Non- Appropriated Funds (NAF). The contractor shall include in the Division I cost breakdown the following:

(a) A Cost element for the design fee associated with the 6% limitation.

(b) A separate cost element for any other architect/engineering fees associated with the design costs.

E. Task Order Evaluation Upon receipt of the contractors' proposals, the Government will evaluate the proposals for completeness and reasonableness utilizing the evaluation procedures outlined in the TOPR. The contracting officer may exercise broad discretion in developing appropriate order placement and evaluation procedures. Task Orders may be awarded after evaluation on price, best value, past performance, Tradeoffs process, Lowest Price Technically Acceptable (LPTA) process, VATEP process, or any other evaluation process basis identified in the TOPR depending on the unique requirements of each Task Order.

1. The Contracting Officer issuing the Task Order has full discretion to include various evaluation factors and relative weights in addition to price or cost such as (but not limited to):

(a) Past Performance - Task Order past performance or prior past performance on other contracts in the absence of recent Task Order past performance.

(b) Quality of Deliverables.

(c) Ability to Meet Schedule Requirements.

(d) Relevant Experience.

(e) Cost Control.

(f) Potential impact on other orders placed with the contractor.

(g) Current capacity and workload.

(h) Design.

(i) The contractor's technical understanding of the work.

(j) The most efficient and effective plan to accomplish the work.

(k) Rationale for proposed materials, type and quantities.

(l) Sustainable design features.

2. The past performance assessment for all Contractors will be considered as SATISFACTORY for the first six

(6) months of performance to allow the Government to build a past performance record on this contract. On month seven (7) of the contract and thereafter, the Contracting Officer may rely on information available on contractors' past performance record of the Contractor in previous task orders under this contract and any information available from other sources such as Contractor Performance Assessment Reporting System (CPARS) and the Past Performance Information Retrieval System (PPIRS), or references from other Contracting Officers.

3. The proposal shall include detailed cost/price amounts of all resources required to accomplish the task, (i.e.

labor hours, rates, travel, incidental equipment, etc.). The level of detail required shall be primarily based on the contract type planned for use, as further discussed below. Cost/price proposals shall include, as a minimum, a complete Contractor Work Breakdown Structure (CWBS), which coincides with the detailed technical level of effort to complete the task order; and provides all information as specified in the TOPR.

Information other than cost and pricing data maybe required at the TO level for fixed price orders. No detailed price information will be submitted if not required by the TO. The proposed price on the task order proposal will be evaluated using pricing analysis described in FAR 15.404. The following will be used in evaluating prices proposed to ensure the price is fair and reasonable:

(a) COMPLETENESS. All price information required by the TOPR has been submitted, to include option period pricing when applicable.

(b) REASONABLENESS. The degree to which the proposed prices compare to the prices a reasonably prudent person would expect to incur for the same or similar services. The hourly wages will be examined to identify unbalanced pricing because of unusually low price estimates, understatements of prices, inconsistent pricing patterns, or potential misunderstandings of the task order requirements.

F. Interchanges The Contracting Officer will evaluate the proposal(s) in response to the TOPR and may enter into Interchanges as necessary to reach an award or fair and reasonable price determination. Interchanges are fluid interactions between the Contracting Officer and the offeror(s) that may address any aspect of the proposal and may or may not be documented in real time. Interchanges may address all aspects of the proposal: technical, cost/price, past performance, contract documentation, and/or any other matter in the evaluation process and while not required may be conducted with all, some, or none of the offerors at the discretion of the Contracting Officer.

The Contracting Officer will have discretionary authority on format and method to hold interchanges.

Interchanges may be written as Interchange Notices (INs), which would accurately capture the contemporaneous sharing of information between the Government and the Offerors; or may also be oral conversations between the Government and the Offeror(s) captured later in a finalized Interchange Record.

G. Task Order Issuance Contracting Officers are the only individuals authorized to issue orders Task Order (TO) and to provide written confirmation of oral orders under this contract. Award will only be made upon receipt of certified funds; unless specifically authorized by the Contracting Officer, the contractor shall not commence performance or incur in any costs until a fully executed task order is issued. Consequently the Government is not obligated to reimburse the contractor for any work or any costs incurred nor is the contractor expected or obligated to perform or make any deliverables unless directed by issuance of a task order.

1. Only a Contracting Officer from 502 CONS, Laughlin AFB, or Goodfellow AFB may issue TOs to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the Specifications.

2. TOs will be issued using the DD 1155. Orders may be issued electronically via e-mail, regular mail, telephone, facsimile, or other authorized electronic means. The Contracting Officer is authorized to issue orders and provide written confirmation of oral orders, if applicable, under the contract.

3. Unless specifically authorized by the Contracting Officer, the Contractor shall not commence work until a fully executed Task Order has been awarded and a notice to proceed has been issued. The Contracting Officer will issue a TO that will include at minimum the following documentation:

(a) TO effective date.

(b) Tailored SOW, including any applicable specifications and Contract Data Requirements List (CDRLs).

(c) Government Furnished Property, material, equipment, and/or information available for the performance of this TO.

(d) TO award amount.

(e) Period of Performance.

(f) Liquidated Damages if applicable.

(g) Project Manager and any other technical points of contact for the TO.

(h) Any other pertinent information required/requested for the performance of the TO.

4. Contracting Officers reserve the right to negotiate or direct accelerated performance periods at the individual Task Order level. Task Order Period of Performance (POP) shall be determined at the individual Task Order level.

H. Task Order Administrative Authority The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the TOs issued under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO.

1. In the event the contractor effects any such changes at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.

2. Modifications to TOs will be issued on Standard Form (SF) 30.

I. Task Order Performance Upon receipt of the TO, the designated Project Manager shall be responsible for the prosecution of the TO and shall be the POC for the Government's Project Manager.

1. The Prime Contractor and any subcontractor or lower tier subcontractor performing construction on the MACC Program shall be responsible for compliance with all contract clauses cited within the contract.

(a) All subcontracted effort over $2,500 shall be competed, unless published price lists are available and included with the proposal (i.e. equipment rental). In rare instances, if subcontractor competition cannot be obtained, the Prime Contractor shall ensure enough information is provided in the proposal for the Government to thoroughly evaluate the level of effort of subcontracted work (labor, equipment, materials, overhead, and profit) for the Government.

(b) Task Orders that require specialty trades that are associated with engineering services, but that do not require a Professional Engineer to 'stamp' a final product, are authorized to be subcontracted. If the final product requires an Engineering stamp or certification, the inspections can be subcontracted, so long as the Prime Contractor or its Teaming Partner provides the appropriate 'stamp' or certification.

2. Contractors shall be required to furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, limited design if applicable, taxes (local, state and federal) and all other associated costs necessary to fulfill the requirement specified in each TOPR.

3. Sub-contractors shall be identified to the Contracting Officer through a completed SF1413-Statement and Acknowledgement in accordance with FAR Clause 52.222-11-Subcontracts (Labor Standards). The SF 1413 shall be submitted at or prior to the pre-construction meeting. The Contractor is solely responsible for updating the Government via SF 1413 when/if a new subcontractor will work on the MACC Program. The form can be found at the following link:

https://www.gsa.gov/portal/forms/download/115794

The Notice to Proceed (NTP) will not be issued until a SF 1413 is properly submitted.

4. No construction, alteration, or repair (including painting and decorating) of public buildings or public works shall be performed under this contract without the utilization of qualified persons/licensed mechanics, or certified technicians who meet the requirements of the work to be performed and accepted.

5. Construction Wage Rate Requirements formerly known as the Davis-Bacon Act shall be applied at the TO level for all requirements above $2,000.00. Contractors are hereby given notice that up-to-date Wage Determinations may be found online at the following link:

https://sam.gov/content/wage-determinations

6. The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m.

Monday through Friday, Federal Holidays excepted unless otherwise noted in the Statement of Work or Specifications. The Contractor may elect, at his option, to work hours other than normal duty hours provided that the requirement is submitted in writing at least 72 hours in advance and the Contracting Officer approves the request.

(a) All contractor requests for other than standard working hours shall be at no additional cost to the government, unless specified differently in the TOPR. In the event of a discrepancy about standard working period between the IDIQ and Task Order, the IDIQ language shall take precedence.

(b) Non-standard working hours are defined as the period from 4:31 p.m. to 7:29 a.m. Monday through Friday, as well as weekends and Federal Holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor cost proposals, including justification for the request.

7. Select Government facilities and areas have been designated as restricted or controlled areas, for security purposes, requiring special procedures for entering, exiting, or operations within those areas. Any such areas within the scope of a task order issued against the basic contract will be clearly identified in the Government statement of work/specifications in the TOPR. All work inside restricted/controlled area(s) is inherently subject to brief delays due to security processing, as well as interruptions to the normal work schedule to protect mission essential operations.

Delays/interruptions within these areas are considered an inherent element of work, and shall be factored into the initial proposal for work in select security areas. Specific items of work to be accomplished in select security areas will be clearly identified in contractor technical/cost proposals, indicating justification for the request.

8. Select Government facilities and areas have been designated as Medical, requiring special procedures for entering, exiting, or operations within those areas. Any such areas within the scope of a task order issued against the basic contract will be clearly identified in the Government statement of work/specifications. All work in these facilities is inherently subject to brief delays due to processing, as well as interruptions to the normal work schedule to protect essential operations. Delays, interruptions, and special requirements within these areas are considered an inherent element of work, and shall be factored into the initial proposal for work in medical facilities.

J. Protest In accordance with FAR 16.505(a)(10)(i) and (ii) no protest under subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract; or a protest of an order valued in excess of $25 million (10 U.S.C. 2304c(e)). Protests of orders in excess of the thresholds stated in 16.505(a)(10(i)(B) may only be filed with the Government Accountability Office, in accordance with the procedures at 33.104.

K. Evaluation of Contractor Performance.

At the conclusion of each full year of this contract and upon completion of each task order equal to or greater than $750,000, or any reflected change as noted in FAR 42.105(e), the Contracting Officer will complete a Contractor Performance Evaluation Report (CPAR) taking into account all aspects of the Contractor's performance for input into the CPAR system or internal database as appropriate. Contractors will be provided a copy of the evaluation and afforded the opportunity to comment. The Contracting Officer may submit a performance evaluation report for orders under CPARS threshold in FAR 42.105(e). Negative performance evaluations may result in off ramping of an active contract holder.

Contractors are required to designate a point of contact (POC) to receive notification of performance evaluations for the MACC program and subsequent TOs. The POC must maintain a current email address on file with the Contracting Officer. Contracting Officers must be notified of any changes to the POC. All active IDIQ contract holders are required to attend an annual Program Management Review (PMR). The PMR is designed to enhance contractor performance and address issues. Some areas that may be discussed are compliance with statutes, regulations and policies; structure, processes and practices of the contractors as they relate to meeting Task Order requirements; and factors that enable or hinder success.

L. Small Business Status All MACC IDIQ active and inactive contract holders shall be required to recertify their small business status within 60 to 120 calendar days prior to the end of the fifth year of this contract

M. On and Off Ramping General Conditions On ramping is defined as switching a qualified inactive contract holder to active status to compete for subsequent requirements under the fair opportunity process identified at FAR 16.505. Off ramping is defined as switching a qualified active contract holder to inactive status, therefore removing the ability to compete under the fair opportunity process. Once off ramped, contractors will be completely removed from the MACC Program and will no longer be eligible to compete for future Task Order awards. If an active contractor is off ramped, an inactive contractor may be on ramped.

Contract holders are expected, in good faith, to participate in task order competitions, and if successful, to deliver quality projects on schedule and at cost, to include management and supervision of subcontractors. If, for any reason, a contractor cannot participate in a competition, the contractor shall provide written notice of the reason(s) for non-participation prior to the proposal due date. Before the exercise of any option period(s), the Government will evaluate the participation rates, reason(s) for non-participation and performance evaluations for task orders completed or in effect. Failure to participate in good faith and/or an overall performance CPAR Rating of Marginal or Unsatisfactory may result in the contractor being off-ramped from the MACC IDIQ program.

Periodically, the Government will assess the quality of performance by each IDIQ holder, the number, value and complexity of work assigned to each holder and amount of competition achieved. In addition, the government will assess the internal transaction cost for issuing each task order.

N. On Ramp Procedures

The Government reserves the right to on ramp inactive contractors during the term of this IDIQ contract. On ramping procedures may take place at any time after the basic IDIQ is awarded. The Government may choose to on ramp any number of inactive IDIQ awardees when the Contracting Officer determines it is in the Government's best interest to do so in order to enhance the competitive environment of TOPR solicitations under the originally awarded IDIQ contracts. This may be due to any reason, including the lack of robust competition for TOs or a shrinking of the competitive pool of original active IDIQ awardees.

On ramping procedures apply when the government decides to switch the status of a MACC Program basic contract holder from inactive status to active status. No offeror outside the MACC Program pool of contractors will be allowed to be on ramped. If it becomes necessary to on ramp an IDIQ contract holder to replace an off ramped contractor, the Government will replace the off ramped contractor with the next highest rated offeror amongst the inactive pool.

To make an on ramped contract active, the Government will give the on ramped contractor a 30-day notice. The contractor will be required to recertify their small business status and, at the end of the 30 days, the Government will unilaterally modify the basic IDIQ contract changing the Contract Status from "Inactive MACC Program Contract Holder" to "Active MACC Program Contract Holder". No terms or conditions will be changed. The on ramped contractor would then be included in the active IDIQ contract pool and may compete for future TOs.

The Government will promptly send written notices to existing active IDIQ contract holders of any on ramp actions. Any IDIQ contracts made active under these on ramp procedures will not exceed the program ordering period or period of performance. The Government's actions to on ramp inactive contract holders under this process shall not constitute a basis of contractual adjustment or protest for any active IDIQ contract awardees.

O. Off-Ramp Procedures The Off-Ramp process under the MACC Program encompasses a procedure by which the Government may exercise its unilateral right to remove a contractor from the pool of active IDIQ contract awardees. The Government, at its sole discretion, reserves the right to off ramp a contractor by enforcing a contract Termination, at no cost to the Government, for the reasons below as applied to the contractor or any of its subcontractors.

(a) Failure to provide competitive proposals for at least 80% of TOPR requests over a twelve month period of performance (It is the responsibility of the contractor to track percentage submitted)

(b) Failure to self-perform at least 15% of the work over a twelve month period of Performance

(c) Late performance of TO workload

(d) Failure to maintain and provide required data requested by the Contracting Officer

(e) Inability of prime contractor or subcontractors performing work to maintain proper certification

(f) Failure to participate in the annual program management review

(g) Consistently poor TO performance as evidence by customer feedback to the Contracting Officer

(h) Unresponsiveness to warranty work

(i) Failure to provide responsive customer service

(j) Unsafe site conditions

(k) Any other reason seen suitable by the Contracting Officer

The Government will provide a 30-day written notice if it intends to off ramp an IDIQ contractor. However, it is the Government's intent to maintain a strategic relationship with all IDIQ contractors for the duration of the IDIQ ordering period. Off ramping of contractors utilizing the off ramping procedures found in the MACC Program basic contract shall not constitute a basis of contractual adjustment or a claim under the Disputes clause. Additional Procedures to remove a contractor from the pool of active IDIQ contract awardees includes FAR Part 49 for contracts or orders under (Termination for Default, Termination for Convenience of the Government).

(End of Ordering Guide)

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 1 - SOW Dated (Rev. 20 Aug 2021) Attachment 2 - Contract Progress Schedule (AF 3064) Attachment 3 - Contract Insurance Compliance Notification Attachment 4 - Construction Cost Estimate Breakdown Attachment 5 - RFI Template V2 Attachment 6 - Contract Progress Report (AF 3065) Attachment 7 - Material Approval (AF3000) Attachment 8 - Progress Payment Request Attachment 9 - Warranty Call Worksheet Attachment 10 - Base Access Request Form Attachment 11 - SF1413

**Attachments 12 - 19 will NOT be part of the resulting IDIQ Contract(s)

Attachment 12 - Proposal Checklist Attachment 13 - DB Experience Project Reference (Rev. Aug 2021)

Attachment 14 - Solicitation Exceptions Attachment 15 - Quality and Satisfaction Survey (Rev. Aug 2021) Attachment 16 - Past Performance Information Sheet (Rev. Aug 2021) Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021) Attachment 18 - Section L Instructions to Offerors (Rev. 20 Aug 2021) Attachment 19 - Section M Evaluation Factors for Award (Rev. 20 Aug 2021)

IDCode:
Page: 1
Pages: 11
AmendNo: 0001
EffDate: 20 Aug 2021
ReqNo:
ProjNo: 00000
IssCode: FA3016
AdmCode:
IssuedBy: FA3016 502 CONS CL

1655 SELFRIDGE AVE BLDG 5450

CP 210-671-3617

JBSA LACKLAND, TX 78236-5286

UNITED STATES

ZANDRA HEARN, Email: zandra.hearn@us.af.mil Telephone: (210) 671-0474

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA301621R0017
SolDate: 21 Jul 2021
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: ANDREW S. SORENSEN

Email: andrew.sorensen.1@us.af.mil Telephone: 210-671-6083

ContDate:
CODate: