About this file

This document contains a Material Approval Submittal form and information regarding a Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity solicitation.

The Material Approval Submittal form is used by contractors to submit shop drawings, equipment data, manufacturer literature, certificates, and material samples to the government for approval according to contract provisions. It requires the contractor's signature certifying compliance with all specifications and includes blocks for item descriptions, specification references, contractor and government approvals and comments.

The Multiple Award Construction Contract IDIQ solicitation is to establish approximately twelve contracts totaling $990 million over ten years. The contracts will fulfill various construction requirements including design-build projects for all installations comprising Joint Base San Antonio, with support for Laughlin AFB and Goodfellow AFB. Requirements include maintenance, sustainment, repair and alteration projects for real property, road paving, and various construction projects in support of installation maintenance. The Construction Wage Requirement applies at the task order level. The solicitation is a total small business set-aside for NAICS code 236220.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ, newest first.
File Type Posted
Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021).pdf PDF
FA301621R00170001 - Conformed Solicitation.pdf PDF
Attachment 16 - Past Performance Information Sheet_Aug2021.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 20Aug2021.docx DOCX document
QA Session for FA301621R0017_08202021.pdf PDF
FA301621R00170001 SF 30.pdf PDF
Attachment 13 - DB Experience Project Reference_Aug2021.pdf PDF
Attachment 1 - SOW Dated (Rev 20 Aug 2021).pdf PDF
Attachment 15 - Quality and Satisfaction Survey_Aug2021.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev20Aug2021.docx DOCX document
Attachment 3 - Contract Insurance Compliance Notification.pdf PDF
Attachment 12 - Proposal Completeness Checklist - 17MAY2021.docx DOCX document
Attachment 17 - Teaming Experience Matrix.docx DOCX document
FA301621R0017.pdf PDF
Attachment 1 - SOW dated 20Aug2020_Revised MACC Specifications 6Jun2021.pdf PDF
Attachment 8 - Progress Payment Request.xlsx XLSX spreadsheet
Attachment 16 - Past Performance Information Sheet.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 01July2021.pdf PDF
Attachment 2 - Contract Progress Schedule (AF 3064).xls XLS spreadsheet
Attachment 5 - RFI Template V2.pdf PDF
Attachment 6 - Contract Progress Report (AF 3065).pdf PDF
Attachment 10 - Base Access Request Form.pdf PDF
Attachment 11 - SF1413.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev 01July2021.pdf PDF
Attachment 4 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 9 - Warranty Call Worksheet.pdf PDF
Attachment 13 - DB Experience Project Reference.pdf PDF
Attachment 14 - Solicitation Exceptions.docx DOCX document
Attachment 15 - Quality and Satisfaction Survey.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE

TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUESTAPPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE

SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer:
FROM Contractor:
YYYYMMDD:
CONTRACT NUMBER:
SUBMISSION NUMBER:
NEW: Off
RESUBMITTAL: Off
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1:
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
INITIAL:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
INITIAL_2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
INITIAL_3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
INITIAL_4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
INITIAL_5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
INITIAL_6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
INITIAL_7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
INITIAL_8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
INITIAL_9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
INITIAL_10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
INITIAL_11:
YYYYMMDD_2:
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT:
FOR GOVERNMENT USE ONLY:
For Evaluation and Action:
YYYYMMDD_3:
TYPE OR PRINT NAME AND GRADE:
AF Contracting Office:
YYYYMMDD_4:
DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE:
TO Contractor:
DAYS OF DATE SHOWN BELOW:
YYYYMMDD_5:
TYPE OR PRINT NAME AND GRADE_2:
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off

File details come from the government source that posted it. Updated .