Attachment 13 - DB Experience Project Reference_Aug2021.pdf
PDF 288 KB Posted
- Attached to
- Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
- Solicitation number
- FA301621R0017
About this file
This document provides details for the Joint Base San Antonio Multiple Award Construction Contract IDIQ solicitation. The solicitation will establish an indefinite-delivery, indefinite-quantity multiple award construction contract to fulfill various construction requirements including design-build projects for all installations comprising Joint Base San Antonio. Support for decentralized task orders at Laughlin AFB and Goodfellow AFB will also be included. The total program ceiling is $990 million over ten years. The Air Force expects to award approximately twelve contracts under this total small business set-aside for NAICS code 236220. Construction requirements will involve maintenance, sustainment, repair, and alteration projects including real property maintenance, road paving, and various construction projects in support of installation maintenance. The Construction Wage Requirement will apply to task orders issued under the program.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 13 – DB Experience Project Reference (Present projects only from the Prime or Teaming Partners with a signed TA included in the proposal).
EXAMPLE PROJECT KEY NUMBER
Project No.
PROJECT SAMPLE REFERENCE FOR:
Prime Joint Venture Teaming Partner
TITLE AND LOCATION (City and State) Contract No. Task Order (if applicable)
DoD Agency or Private/Commercial Entity:
Project Title:
Location (i.e. JBSA Lackland, San Antonio, Texas)
COMPLETE THE TYPE OF PROJECT INFORMATION
Divisions/Trades Included as part of the Scope of Project:
Electrical Carpentry Insulation Roofing Plumbing
Flooring (Tile) Cement/Concrete Work Flooring (Carpet/Laminate)
Fire Suppression HVAC Repair/Installation Dry Wall/Ceiling Installation
HazMat Abatement Remediation (Asbestos/Mold/Lead-based Paint)
Other (Explain):
Disciplines Included as part of the Scope of Project:
Architectural Structural Mechanical Fire Protection
Electrical Civil Work Other (explain):
PROJECT INFORMATION
Award Date Completion Date Period of Performance (Actual)
Award Amount Final Contract Amount Project Size (Sq. Ft) to
If Final Amount is different from Contract Amount, please explain reason.
If PoP had to be extended beyond original PoP on Awardee, please explain reason.
Project Owner Point Of Contact Name Point Of Contact (Email & Telephone Number)
Enter Owner (i.e. 502 CES;
JBSA Lackland)
Enter validated/current POC Enter validated/current information
k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. Include a description of the design-effort.
Provide a detailed description of what work your firm self-performed on this project.
Provide a detailed description of challenges faces, actions taken, and result achieved.
| Project No: |
| Award DateRow1: |
| Completion DateRow1: |
| Award AmountRow1: |
| Final Contract AmountRow1: |
| Project Size Sq FtRow1: |
| If Final Amount is different from Contract Amount please explain reasonRow1: |
| If PoP had to be extended beyond original PoP on Awardee please explain reasonRow1: |
| Enter Owner ie 502 CES JBSA Lackland: |
| Enter validatedcurrent POC: |
| Enter validatedcurrent information: |
| k Provide a detailed description of the project and the relevancy to the project requirements of this RFP Include a description of the designeffortRow1: |
| Provide a detailed description of what work your firm selfperformed on this projectRow1: |
| Provide a detailed description of challenges faces actions taken and result achievedRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Date31_af_date: |
| Date32_af_date: |
File details come from the government source that posted it. Updated .