Attachment 12 - Proposal Completeness Checklist - 17MAY2021.docx

DOCX document 33 KB Posted

Attached to
Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
Solicitation number
FA301621R0017
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a proposal completeness checklist for solicitation number FA301621R0017, the Joint Base San Antonio Multiple Award Construction Contract IDIQ. The solicitation seeks to award approximately twelve construction contracts to support maintenance, sustainment, repair, and alteration projects at Joint Base San Antonio, Laughlin AFB, and Goodfellow AFB over ten years with a total ceiling value of $990 million. The acquisition is a total small business set-aside for NAICS code 236220. The Construction Wage Requirement will apply at the task order level. Proposals are due by the date specified in BetaSam.gov and must include three separate PDF volumes covering executed contracting documents, executive experience and technical approach, and past performance, adhering to specified page limits. Electronic copies in DoD Safe format are also required.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ, newest first.
File Type Posted
Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021).pdf PDF
FA301621R00170001 - Conformed Solicitation.pdf PDF
Attachment 16 - Past Performance Information Sheet_Aug2021.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 20Aug2021.docx DOCX document
QA Session for FA301621R0017_08202021.pdf PDF
FA301621R00170001 SF 30.pdf PDF
Attachment 13 - DB Experience Project Reference_Aug2021.pdf PDF
Attachment 1 - SOW Dated (Rev 20 Aug 2021).pdf PDF
Attachment 15 - Quality and Satisfaction Survey_Aug2021.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev20Aug2021.docx DOCX document
Attachment 3 - Contract Insurance Compliance Notification.pdf PDF
Attachment 17 - Teaming Experience Matrix.docx DOCX document
FA301621R0017.pdf PDF
Attachment 1 - SOW dated 20Aug2020_Revised MACC Specifications 6Jun2021.pdf PDF
Attachment 8 - Progress Payment Request.xlsx XLSX spreadsheet
Attachment 16 - Past Performance Information Sheet.pdf PDF
Attachment 19 - Section M Evaluation Factors for Award_Rev 01July2021.pdf PDF
Attachment 2 - Contract Progress Schedule (AF 3064).xls XLS spreadsheet
Attachment 5 - RFI Template V2.pdf PDF
Attachment 6 - Contract Progress Report (AF 3065).pdf PDF
Attachment 7 - Material Approval (AF3000).pdf PDF
Attachment 10 - Base Access Request Form.pdf PDF
Attachment 11 - SF1413.pdf PDF
Attachment 18 - Section L Instructions to Offerors _Rev 01July2021.pdf PDF
Attachment 4 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 9 - Warranty Call Worksheet.pdf PDF
Attachment 13 - DB Experience Project Reference.pdf PDF
Attachment 14 - Solicitation Exceptions.docx DOCX document
Attachment 15 - Quality and Satisfaction Survey.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12 – Proposal Completeness Checklist

Contractor:____________________________________ Date:____________

CHECKLIST FOR PROPOSAL PACKAGE

SOLICITATION PART
YES
NO
Notes
Proposal Submitted Timely IAW solicitation as noted in BetaSam.gov
BetaSam.gov Solicitation Notice; SF1442, Block 13A (unless amended).

Three (3) separate Volumes (PDF format, labeled accordingly):

Volume I – Executed Contracting Documents CAGE#”XXXXX” Volume II – Executive Experience and Technical CAGE#”XXXXX” Volume III – Past Performance CAGE#”XXXXX”

“XXXX” refers to the offeror’s CAGE Code.

Attachment 18 Section L – 2.4.2

Each volume has a single cover sheet to include the following:

a) Volume Number

b) Title

c) Copy Number

d) Solicitation Identification and

e) Offeror’s Name (duplicate on spine of each binder) Attachment 18 Section L – 2.2

Proposal meets page size instructions.

· Proposal is on 8 1/2” x 11” paper, white output;

· Charts, tables or diagrams do not exceed 11” x 17”;

· All pages of each part appropriately numbered and identified with the Request for Proposal (RFP) number.

Attachment 18 Section L - 2.4

Each Volume contain a more detailed table of contents to delineate the subparagraphs within that file

· Tab indexing used to identify sections.

Attachment 18 Section L - 2.4.1

Each Volume conforms to the Page Limitation

· Volume II adheres to no page limitation.

· Volume II adheres to the 46 Page Limit.

· Volume III adheres to the 104 Page Limit.

Attachment 18 Section L - 2.4.2 Table

One (1) Electronic copy (DoD Safe Dropbox)

· Electronic Documents are in PDF Format

· Title of documents include corresponding Volume/Title, offeror’s Cage code (i.e. “Volume I – Executed Contracting Contracting”) Attachment 18 Section L – 2.1.1, 2.1.2, and 2.1.3

Volume I contains all required documents:

Tab A

· Executed Standard Form 1442

Tab B

· Exceptions to the Solicitation (Attachment 14)

Tab C

· Authorized Offeror Personnel & Company Information

· Notarized Bonding Letter from Surety

· Signed Teaming Agreements (if applicable)

Attachment 18 Section L - 3.1

Volume II contains all required documents:

· Six (6) DB Project References (See Attachment 13)

· All fields in the attachment are complete

· The project references meet the relevancy requirements in paragraph 3.1.1.1

· Team Experience Matrix (See Attachment 17) is included (only applicable when using teaming partner for Project References)

Tab B

Management Effectiveness and Capabilities plan.

Section L - 3.1.1.1

Section L - 3.1.2.1

Volume III contains all required documents:

· No more than eight (8) Past Performance Reports (See Attachment 16)

· The reports represent projects that meet the Recency requirements

· The reports represent projects that meet Relevancy requirements

Tab B

· Up to eight (8) Quality and Satisfaction Survey (one for each Past Performance Report – See Attachment 15).

· Only Sections 1 and 2 of the Quality and Satisfaction Survey are complete.

Section L - 3.1.3.1

Section L - 3.1.3.1.2

FA31621R0017 Page 3 of 3

File details come from the government source that posted it. Updated .