Attachment 12 - Proposal Completeness Checklist - 17MAY2021.docx
DOCX document 33 KB Posted
- Attached to
- Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ Federal contract opportunity
- Solicitation number
- FA301621R0017
About this file
This document is a proposal completeness checklist for solicitation number FA301621R0017, the Joint Base San Antonio Multiple Award Construction Contract IDIQ. The solicitation seeks to award approximately twelve construction contracts to support maintenance, sustainment, repair, and alteration projects at Joint Base San Antonio, Laughlin AFB, and Goodfellow AFB over ten years with a total ceiling value of $990 million. The acquisition is a total small business set-aside for NAICS code 236220. The Construction Wage Requirement will apply at the task order level. Proposals are due by the date specified in BetaSam.gov and must include three separate PDF volumes covering executed contracting documents, executive experience and technical approach, and past performance, adhering to specified page limits. Electronic copies in DoD Safe format are also required.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12 – Proposal Completeness Checklist
Contractor:____________________________________ Date:____________
CHECKLIST FOR PROPOSAL PACKAGE
| SOLICITATION PART |
| YES |
| NO |
| Notes |
| Proposal Submitted Timely IAW solicitation as noted in BetaSam.gov |
| BetaSam.gov Solicitation Notice; SF1442, Block 13A (unless amended). |
Three (3) separate Volumes (PDF format, labeled accordingly):
Volume I – Executed Contracting Documents CAGE#”XXXXX” Volume II – Executive Experience and Technical CAGE#”XXXXX” Volume III – Past Performance CAGE#”XXXXX”
“XXXX” refers to the offeror’s CAGE Code.
Attachment 18 Section L – 2.4.2
Each volume has a single cover sheet to include the following:
a) Volume Number
b) Title
c) Copy Number
d) Solicitation Identification and
e) Offeror’s Name (duplicate on spine of each binder) Attachment 18 Section L – 2.2
Proposal meets page size instructions.
· Proposal is on 8 1/2” x 11” paper, white output;
· Charts, tables or diagrams do not exceed 11” x 17”;
· All pages of each part appropriately numbered and identified with the Request for Proposal (RFP) number.
Attachment 18 Section L - 2.4
Each Volume contain a more detailed table of contents to delineate the subparagraphs within that file
· Tab indexing used to identify sections.
Attachment 18 Section L - 2.4.1
Each Volume conforms to the Page Limitation
· Volume II adheres to no page limitation.
· Volume II adheres to the 46 Page Limit.
· Volume III adheres to the 104 Page Limit.
Attachment 18 Section L - 2.4.2 Table
One (1) Electronic copy (DoD Safe Dropbox)
· Electronic Documents are in PDF Format
· Title of documents include corresponding Volume/Title, offeror’s Cage code (i.e. “Volume I – Executed Contracting Contracting”) Attachment 18 Section L – 2.1.1, 2.1.2, and 2.1.3
Volume I contains all required documents:
Tab A
· Executed Standard Form 1442
Tab B
· Exceptions to the Solicitation (Attachment 14)
Tab C
· Authorized Offeror Personnel & Company Information
· Notarized Bonding Letter from Surety
· Signed Teaming Agreements (if applicable)
Attachment 18 Section L - 3.1
Volume II contains all required documents:
· Six (6) DB Project References (See Attachment 13)
· All fields in the attachment are complete
· The project references meet the relevancy requirements in paragraph 3.1.1.1
· Team Experience Matrix (See Attachment 17) is included (only applicable when using teaming partner for Project References)
Tab B
Management Effectiveness and Capabilities plan.
Section L - 3.1.1.1
Section L - 3.1.2.1
Volume III contains all required documents:
· No more than eight (8) Past Performance Reports (See Attachment 16)
· The reports represent projects that meet the Recency requirements
· The reports represent projects that meet Relevancy requirements
Tab B
· Up to eight (8) Quality and Satisfaction Survey (one for each Past Performance Report – See Attachment 15).
· Only Sections 1 and 2 of the Quality and Satisfaction Survey are complete.
Section L - 3.1.3.1
Section L - 3.1.3.1.2
FA31621R0017 Page 3 of 3
File details come from the government source that posted it. Updated .