Attachment 4 - Construction Cost Estimate Breakdown 17JUN2021.xls

XLS spreadsheet 47 KB Posted

Attached to
Repair Storm Drainage at the Medical Education Training Campus (METC).
Solicitation number
FA301621B0002
Issued by

About this file

This document contains a federal contract opportunity solicitation for repair work and a related construction cost estimate breakdown attachment. The solicitation seeks bids to repair storm drainage at the Medical Education and Training Campus dormitories located at Joint Base San Antonio - Fort Sam Houston in Texas. The project magnitude is between $500,000 to $1 million. The solicitation is a restricted acquisition set aside for Historically Underutilized Business Zone small businesses. The period of performance for the repair work is 260 calendar days. Bids must be submitted electronically by the deadline and include a detailed cost estimate using the RS Means format and any supporting documentation. The sponsoring agency is the Air Force Air Education and Training Command. The attached construction cost estimate breakdown provides a template to itemize material, labor, equipment, and other costs for the repair project.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Details

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
General Construction Subtotal$0.00
General Construction Labor Burden%$0.00
%RSMeans San Antonio, TX CCI0.00%$0.00
General Construction Subcontractor Overhead0.00%$0.00
General Construction Subcontractor Profit0.00%$0.00
General Construction Prime Contractor Overhead$0.00
General Construction Prime Contractor Profit$0.00
General Construction Prime Contractor Bonding$0.00
General Construction Contingency0.00%$0.00
CONTRACT FOR (Work to be performed)This cost proposal is valid for XX calendar daysProposed Project Amount$0.00
Repair Storm Drainage METC DormsThe period of performance to perform this work is 260 calendar days.
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
JBSF160208JBSA - Fort Sam Houston
LINE
NO.ITEM DESCRIPTIONUNIT OF
MEASUREMATERIAL COSTSLABOR COSTSEQUIPMENT COSTSOTHER COSTSLINE

TOTAL

QUANTITYUNITTOTALCREWLABOR
HOURSAVERAGE
RATETOTALUNITTOTALUNITTOTAL
1$0.00
2$0.00
3$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
12$0.00
13$0.00
14$0.00
15$0.00
16$0.00
17$0.00
18$0.00
19$0.00
20$0.00
21$0.00
22$0.00
23$0.00
24$0.00
25$0.00
26$0.00
27$0.00
28$0.00
29$0.00
30$0.00
31$0.00
32$0.00
33$0.00
4634$0.00
4735$0.00
36$0.00
37$0.00
38$0.00
39$0.00
400.0000$0.00
41$0.00
42$0.00
43$0.00
44$0.00$0.00
45$0.00$0.00

File details come from the government source that posted it. Updated .