AF 3052 Construction Cost Estimate Breakdown.xls
XLS spreadsheet 35 KB Posted
- Solicitation number
- FA301620B0010
About this file
This document contains a construction cost estimate breakdown template for a project to remove rubber from Kelly Airfield at Joint Base San Antonio Lackland. The template includes lines to estimate material, labor, equipment, and other costs for up to 46 line items. It also specifies the contractor address, applicable RSMeans location for cost indices, overhead and profit rates, bonding costs, and contingency percentage. The related federal contract opportunity is a solicitation from the Air Force Air Education and Training Command to remove rubber from Kelly Airfield at Joint Base San Antonio Lackland. The solicitation number is FA301620B0010 and project number is KELL201914. The period of performance is not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| General Construction Subtotal | $0.00 | ||||||||||
| General Construction Labor Burden | % | $0.00 | |||||||||
| % | RSMeans San Antonio, TX CCI | 0.00% | $0.00 | ||||||||
| General Construction Subcontractor Overhead | 0.00% | $0.00 | |||||||||
| General Construction Subcontractor Profit | 0.00% | $0.00 | |||||||||
| General Construction Prime Contractor Overhead | $0.00 | ||||||||||
| General Construction Prime Contractor Profit | $0.00 | ||||||||||
| General Construction Prime Contractor Bonding | $0.00 | ||||||||||
| General Construction Contingency | 0.00% | $0.00 | |||||||||
| CONTRACT FOR (Work to be performed) | This cost proposal is valid for XX calendar days | Proposed Project Amount | $0.00 | ||||||||
| The period of performance to perform this work is XX calendar days. | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| LINE | |||||||||||
| NO. | ITEM DESCRIPTION | UNIT OF | |||||||||
| MEASURE | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE |
TOTAL
| QUANTITY | UNIT | TOTAL | CREW | LABOR | ||||||
| HOURS | AVERAGE | |||||||||
| RATE | TOTAL | UNIT | TOTAL | UNIT | TOTAL | |||||
| 1 | $0.00 | |||||||||
| 2 | $0.00 | |||||||||
| 3 | $0.00 | |||||||||
| 4 | $0.00 | |||||||||
| 5 | $0.00 | |||||||||
| 6 | $0.00 | |||||||||
| 7 | $0.00 | |||||||||
| 8 | $0.00 | |||||||||
| 9 | $0.00 | |||||||||
| 10 | $0.00 | |||||||||
| 11 | $0.00 | |||||||||
| 12 | $0.00 | |||||||||
| 13 | $0.00 | |||||||||
| 14 | $0.00 | |||||||||
| 15 | $0.00 | |||||||||
| 16 | $0.00 | |||||||||
| 17 | $0.00 | |||||||||
| 18 | $0.00 | |||||||||
| 19 | $0.00 | |||||||||
| 20 | $0.00 | |||||||||
| 21 | $0.00 | |||||||||
| 22 | $0.00 | |||||||||
| 23 | $0.00 | |||||||||
| 24 | $0.00 | |||||||||
| 25 | $0.00 | |||||||||
| 26 | $0.00 | |||||||||
| 27 | $0.00 | |||||||||
| 28 | $0.00 | |||||||||
| 29 | $0.00 | |||||||||
| 30 | $0.00 | |||||||||
| 31 | $0.00 | |||||||||
| 32 | $0.00 | |||||||||
| 33 | $0.00 | |||||||||
| 46 | 34 | $0.00 | ||||||||
| 47 | 35 | $0.00 | ||||||||
| 36 | $0.00 | |||||||||
| 37 | $0.00 | |||||||||
| 38 | $0.00 | |||||||||
| 39 | $0.00 | |||||||||
| 40 | 0.0000 | $0.00 | ||||||||
| 41 | $0.00 | |||||||||
| 42 | $0.00 | |||||||||
| 43 | $0.00 | |||||||||
| 44 | $0.00 | $0.00 | ||||||||
| 45 | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .