Register_18_Jul_Revised.pdf

PDF 247 KB Posted

Attached to
Replace Air Cooler and Chiller Federal contract opportunity
Solicitation number
FA3016-18-R-0060
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Replace Air Cooler and Chiller, newest first.
File Type Posted
Questions.pdf PDF
FA3016-18-R-0060-0004.pdf PDF
Questions.pdf PDF
SOW_Specification_13_July_2018.pdf PDF
FA3016-18-R-0060-0003.pdf PDF
Questions_and_Answers.pdf PDF
FA3016-18-R-0060-0002.pdf PDF
FA3016-18-R-0060-0001.pdf PDF
SOW_Specification_4_May_2018.DOC DOC document
4._Register_5_Feb_18.pdf PDF
wage_determination.pdf PDF
FA3016-18-R-0060.pdf PDF
SOW_Specification_4_May_2018.DOC DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

01 14 00 SD-01 Preconstruction Submittals Glist Construction Superintendent

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

GProject Schedule CPM 01 35 29 SD-01 Preconstruction Submittals

1.5 GAccident Prevention Plan (APP)

GActivity Hazard Analysis (AHA)

SD-06 Test Reports GAccident Reports GRegulatory Citations and

Violations 01 35 30 SD-08 Manufacturer’s Instructions

GSite Safety and Health Plan SD-09 Manufacturer’s Field Reports

GSafety and Health Phase-Out Report

01 35 35 SD-01 Preconstruction Submittals

1.6ENVIRONMENTAL

PROTECTION PLAN

SD-02 Shop Drawings Asbestos Work Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair ISR Primary Chiller, Rm 219 at B2000

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

01 35 35 Asbestos Certifications Asbestos Transporter License Asbestos Medical clearances (may be reviewed on site)

Asbestos Training Certificates Asbestos TDSHS License as applicable

Any Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

Lead Work Plans Lead Occupant Protection Plan.

Texas Department of State Health Services Lead Licenses

Lead Notifications Lead Training Certificates Lead Based Paint Reports Lead Inspection reports

SD-03 Product Data Asbestos Air Monitoring reports Lead Air Monitoring reports

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair ISR Primary Chiller, Rm 219 at B2000

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

01 35 35 Lead OSHA Negative Exposure Assessment or

Lead Work Plan.

EPA Lead Training Lead Awareness Training certificates

OSHA Air Monitoring Lead Training Certificates Waste Disposal Plan, May be included in work plan

Lead Inspection reports Lead Based Paint Reports

01 45 00.00 10 SD-01 Preconstruction Submittals 3.2Contractor Quality Control (CQC)

Plan 01 45 00.00 20 SD-01 Preconstruction Submittals

GContractor Quality Control (CQC) Plan

01 50 00 SD-01 Preconstruction Submittals

1.2 GConstruction Site Plan

GTraffic Control Plan 01 78 00 SD-01 Preconstruction Submittals

GAs-Built Drawings SD-02 Shop Drawings As-Built Record of Materials

FIO

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair ISR Primary Chiller, Rm 219 at B2000

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

01 78 00 SD-03 Product Data GWarranty Management Plan

SD-04 Samples GWarranty Tags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Repair ISR Primary Chiller, Rm 219 at B2000

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.