Register_18_Jul_Revised.pdf
PDF 247 KB Posted
- Attached to
- Replace Air Cooler and Chiller Federal contract opportunity
- Solicitation number
- FA3016-18-R-0060
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| FA3016-18-R-0060-0004.pdf | ||
| Questions.pdf | ||
| SOW_Specification_13_July_2018.pdf | ||
| FA3016-18-R-0060-0003.pdf | ||
| Questions_and_Answers.pdf | ||
| FA3016-18-R-0060-0002.pdf | ||
| FA3016-18-R-0060-0001.pdf | ||
| SOW_Specification_4_May_2018.DOC | DOC document | |
| 4._Register_5_Feb_18.pdf | ||
| wage_determination.pdf | ||
| FA3016-18-R-0060.pdf | ||
| SOW_Specification_4_May_2018.DOC | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
01 14 00 SD-01 Preconstruction Submittals Glist Construction Superintendent
01 30 00 SD-01 Preconstruction Submittals
1.2 GView Location Map
1.3 GProgress and Completion
Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals
GProject Schedule CPM 01 35 29 SD-01 Preconstruction Submittals
1.5 GAccident Prevention Plan (APP)
GActivity Hazard Analysis (AHA)
SD-06 Test Reports GAccident Reports GRegulatory Citations and
Violations 01 35 30 SD-08 Manufacturer’s Instructions
GSite Safety and Health Plan SD-09 Manufacturer’s Field Reports
GSafety and Health Phase-Out Report
01 35 35 SD-01 Preconstruction Submittals
1.6ENVIRONMENTAL
PROTECTION PLAN
SD-02 Shop Drawings Asbestos Work Plans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
Repair ISR Primary Chiller, Rm 219 at B2000
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
01 35 35 Asbestos Certifications Asbestos Transporter License Asbestos Medical clearances (may be reviewed on site)
Asbestos Training Certificates Asbestos TDSHS License as applicable
Any Asbestos Inspection reports that have not been provided by the area specific Environmental Office.
Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.
Lead Work Plans Lead Occupant Protection Plan.
Texas Department of State Health Services Lead Licenses
Lead Notifications Lead Training Certificates Lead Based Paint Reports Lead Inspection reports
SD-03 Product Data Asbestos Air Monitoring reports Lead Air Monitoring reports
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
Repair ISR Primary Chiller, Rm 219 at B2000
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
01 35 35 Lead OSHA Negative Exposure Assessment or
Lead Work Plan.
EPA Lead Training Lead Awareness Training certificates
OSHA Air Monitoring Lead Training Certificates Waste Disposal Plan, May be included in work plan
Lead Inspection reports Lead Based Paint Reports
01 45 00.00 10 SD-01 Preconstruction Submittals 3.2Contractor Quality Control (CQC)
Plan 01 45 00.00 20 SD-01 Preconstruction Submittals
GContractor Quality Control (CQC) Plan
01 50 00 SD-01 Preconstruction Submittals
1.2 GConstruction Site Plan
GTraffic Control Plan 01 78 00 SD-01 Preconstruction Submittals
GAs-Built Drawings SD-02 Shop Drawings As-Built Record of Materials
FIO
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
Repair ISR Primary Chiller, Rm 219 at B2000
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
01 78 00 SD-03 Product Data GWarranty Management Plan
SD-04 Samples GWarranty Tags
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
Repair ISR Primary Chiller, Rm 219 at B2000
CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it.