Questions_and_Answers.pdf
PDF 334 KB Posted
- Attached to
- Replace Air Cooler and Chiller Federal contract opportunity
- Solicitation number
- FA3016-18-R-0060
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Register_18_Jul_Revised.pdf | ||
| FA3016-18-R-0060-0004.pdf | ||
| Questions.pdf | ||
| Questions.pdf | ||
| SOW_Specification_13_July_2018.pdf | ||
| FA3016-18-R-0060-0003.pdf | ||
| FA3016-18-R-0060-0002.pdf | ||
| SOW_Specification_4_May_2018.DOC | DOC document | |
| 4._Register_5_Feb_18.pdf | ||
| wage_determination.pdf | ||
| FA3016-18-R-0060-0001.pdf | ||
| SOW_Specification_4_May_2018.DOC | DOC document | |
| FA3016-18-R-0060.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3016-18-R-0060
REPLACE CHILLER BLDG 2000
QUESTIONS AND ANSWERS
1. Is there an asbestos report available for the Pipe insulation and duct wrap?
a. Response: There is no asbestos report for the project site. Recent testing
By CE Environmental Section indicates there is no asbestos materials or Hazmat
Issues in the project site. However, if any suspect materials is found, the contractor should stop work and call the 502 Environmental Flight for further sampling.
2. Will CAD drawings be available for new design drawings?
a. Response: Yes, Auto CAD Template Files will be furnished to the Contractor for preparation of design drawings during the Design phase of this Design-Build
Project.
3. Will this be a Women-Owned Business Set Aside or a Small Business Set-A-Side?
a. This acquisition as stated in section 10 of the RFP FA3016-18-R-0060 is set a side for Women-Owned small businesses.