Atch_8_Progress_Schedule.pdf
PDF 37 KB Posted
- Solicitation number
- FA301617R0061
About this file
Atach 8 Progress Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atach_1_Statement_of_Work_(Version__3).docx | DOCX document | |
| FA3016-17-R-0061_AMENDMENT_0003.pdf | ||
| Atach_1_Statement_of_Work_(Version__2).docx | DOCX document | |
| FA3016-17-R-0061_AMENDMENT_0002.pdf | ||
| Ceiling_Plan.pdf | ||
| Answers_to_Questions_at_Site_Walk_on_30_Jun_2017.docx | DOCX document | |
| Signed_amendment_001.pdf | ||
| Atach_1_Statement_of_Work.docx | DOCX document | |
| Atach_12_Recovered_Materials_Determination.pdf | ||
| Atch_10_Project_Location.pdf | ||
| Atch_6_Cost_Estimate_BreakdownV3.pdf | ||
| RFP,_16_Jun_2017.docx | DOCX document | |
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document | |
| Atach_11_Hazmat_Report.pdf | ||
| Atach_1_Appendix_A_SpecificationsV2.pdf | ||
| Atch_9_Local_Information.pdf | ||
| Atch_7__HAZMAT_Letter.pdf | ||
| Atch_3_Unescorted_Access_Request.pdf | ||
| Atach_2_Wage_Determination.docx | DOCX document | |
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT NO. 8. PROJECT TITLE: Upgrade Centralized Aircraft Support System 10. APPROVAL RECOMMENDED BY
DATE SIGNED
9. SUBMITTED BY:
Contractor's Name DATE SIGNED CONTRACTOR'S SIGNATURE 11. APPROVED BY Contractor's Address DATE SIGNED CONTRACTING OFFICER'S SIGNATURE Contractor's Address
LINE NO. WORK ELEMENTS % Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Feb A B C 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
1 Bonds 2.00% 2.00%
2 Schematic Drawing 5.00% 5.00% 3 Site Prep 13.00% 13.00% 4 Construction 60.00% 60.00% 5 Cleanup 15.00% 15.00% 6 Contract Closeout 5.00% 5.00%
100.00%
MONTHLY TOTAL: 7.00% 73.00% 15.00% 5.00% 100.00%
ACTUAL PROGRESS: 7.00% 80.00% 95.00% 100.00% 100.00%
Highlighted areas to be completed by the contractor; dates and percentages contained are for format example only
6. ACTUAL STARTING DATE:
7. ACTUAL COMPLETION DATE:
5. PROJECT NO. TYMX150127
4. PURCHASE REQUEST NO.
3. COMPLETION DATE:
FA3016-17-C-XXXX
FA301617R0061
Attachment 8
File details come from the government source that posted it. Updated .