Responses to Questions at the Site Walk on 30 Jun 2017 FA301617R0061, Renovate 2nd Floor Hangar 70 & Upgrade AC System

1. Do architect and engineer need to be licensed in Texas?

Answer: Yes.

2. Does flooring require abatement?

Answer: Para 1.2.1 states; The Contractor shall conduct testing as necessary to support the design and construction effort and may include but is not limited asbestos and or lead based paint sampling/analysis, etc. (All In accordance with Section 01 35 35 Environmental Protection)

3. What material are the ceiling panels?

Answer: Lathe and Plaster ceiling.