Attachment 8 - Additional Q and A.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- MAHG251029 Repair Water Tower #8
- Solicitation number
- FA301026Q0033
About this file
This is a Contractor Questions and Answers (Q&A) document addressing clarifications on certification requirements for the Water Tower #8 repair project at Keesler Air Force Base. The document contains a single reviewed comment addressing whether ISO 9001, SSPC QP1, and SSPC QS1 certifications are mandatory for contractors or whether extensive relevant experience alone qualifies bidders for consideration. The government's response confirms that all contractors and subcontractors performing surface preparation or coating application must be certified to either ISO 9001 or SSPC QP 1 AND SSPC QS 1 prior to contract award and must maintain these certifications throughout performance of surface preparation and coating application work. The government explicitly states that waivers and alternative demonstrations of equivalent qualifications are not authorized and will not be considered, with no exceptions permitted for contractors with extensive experience but lacking these specific certifications.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Q&A
| REVIEW COMMENTS | ||
| PROJECT: | ||
| MAHG251029 Repair Water Tower #8, F6015 tank, F6009 well. | Responses to Government will be stoplight chart colored |
1. Red text: No Change, then provide justification
2. Yellow fill: Response to a question or requires further discussion
3. Green Text: Indicates requested change was made.
LOCATION:
Keesler AFB, MS
| PROJECT MANAGER: Andy Towe | Arch/LA | Action taken on comment by: | |||||
| PROJ. #: MAHG251029 | BOD | Charrette | Civ/San | REVIEW | DESIGN OFFICE | BACK CHECK (initial) | |
| REVIEW MEETING: Date | CONF | ||||||
| 35% | 65% | Mech/El | C-Correction made. List dwg or para number where correction is made | ||||
| 95% | Final | Struct | A-Accept | ||||
| Item No. | Drawing Sht. |
SOW Para
| Spec. Para | Government Comments | Comment Type | Reviewer | Email/Phone | Org | Contractor Responses | Discipline | W-Withdraw |
| 60 | Can you confirm whether ISO 9001, SSPC QP1, and QS1 certifications are mandatory for the Water Tower 8 project, or whether contractors with extensive relevant experience but without these certifications remain eligible for consideration? | Our stated requirements within the SPECS document shall be followed. |
1.4.6.8: All Contractors and Subcontractors that perform surface preparation or coating application shall be certified to either ISO 9001 or SSPC QP 1 AND SSPC QS 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application.”
| Waivers and/or alternative demonstration of equivalent qualifications is not authorized and will not be considered. | JEC | ||
| END OF COMMENTS | END OF COMMENTS |