Attachment 3 - MAHG251029 Repair Water Tower 8 F6009 MSS .xls
XLS spreadsheet 69 KB Posted
- Attached to
- MAHG251029 Repair Water Tower #8
- Solicitation number
- FA301026Q0033
About this file
This is a Material Submittals Schedule for a federal construction project to repair Water Tower #8 at Keesler Air Force Base. The document serves as a template for tracking contractor submittals throughout the project lifecycle, establishing submission requirements, review timelines, and approval processes for various construction-related documents and materials.
The schedule requires contractors to submit multiple categories of submittals with specific deadlines relative to the Notice to Proceed (NTP). Hazardous materials documentation, including questionnaires, Material Safety Data Sheets (MSDS), and reporting forms, must be submitted 5 days prior to work start, with final recycling and landfill reports due at contract completion. Warranty documentation—both manufacturer warranties and one-year contractor warranties—are due at project end. Technical submittals for the water tank repair work, including shop drawings, samples, and manufacturer recommendations for specific construction sections (interior coating of welded steel tanks, high-performance coatings for steel structures, cathodic protection systems, lightning protection systems, lighting and navigation aids, and steel tank storage), are due 10 days following NTP. The schedule provides columns for tracking submission dates, receipt dates, Civil Engineering review timelines, approval or disapproval notifications, and resubmittal cycles, with multiple columns allowing for tracking of initial and revised submissions through final approval. The template accommodates up to 70 line items for additional submittals as needed for the project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG251029 Repair Water Tower #8, F6009 | Project Title: | ||
| Paint Repair Water Tower #8 | Solicitation / Contract Number: |
FA301026Q00330001
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | (To be completed by Contractor) | ||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | ||||||||||||||||||||
| Item or Description of Item, Contract Reference, Spec Number, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Transmittal / Submittal Numbers | Date Contractor |
Notified
(H) Contractor Resubmittal Final Approval Submmittal Status Date to Contracting Return Suspense Date Submittal Numbers Date Contractor
Notified
| (O) | Contractor Resubmittal | Approval by | ||||||||||||||||||||||||||||
| Approved | Disapproved | Approved | Disapproved | |||||||||||||||||||||||||||
| (A) | (B) | (C) | (D) | (E) | (F) | (G) | (I) | (J) | (K) | (L) | (M) | (N) | (P) | (Q) | (R) | |||||||||||||||
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||||||||||||||||||||||
| 2 | HazMat MSDS | 3 | 3 | 5 Days Prior to Start Date | ||||||||||||||||||||||||||
| 3 | HazMat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submit Final Quantities | |||||||||||||||||||||||||
| 4 | HazMat Reporting Entry Form | 3 | 3 | End of Contract | ||||||||||||||||||||||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||||||||||||||||||||||
| 6 | Warranty (Manufacturer's) | 3 | End of Contract | |||||||||||||||||||||||||||
| 7 | 1-Year Warranty (Contractor) | 3 | End of Contract | |||||||||||||||||||||||||||
| 8 | Section 09 97 13.16 | INTERIOR COATING OF WELDED STEEL WATER TANKS | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||||||||
| 9 | Section 09 97 13.27 | HIGH PERFORMANCE COATING FOR STEEL STRUCTURES | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||||||||
| Section 26 42 15 CATHODIC PROTECTION SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||||||||||
| 10 | Section 26 41 LIGHTNING PROTECTION SYSTEM | 1 | 1 | 1 | 1 | 10 Days Following NTP | ||||||||||||||||||||||||
| 11 | Section 26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS | 1 | 1 | 1 | 1 | 10 Days Following NTP | ||||||||||||||||||||||||
| 13 | Section 33 16 15 WATER STORAGE STEEL TANKS | 1 | 1 | 1 | 1 | 10 Days Following NTP | ||||||||||||||||||||||||
| 14 | ||||||||||||||||||||||||||||||
| 15 | ||||||||||||||||||||||||||||||
| 16 | ||||||||||||||||||||||||||||||
| 17 | ||||||||||||||||||||||||||||||
| 18 | ||||||||||||||||||||||||||||||
| 19 | ||||||||||||||||||||||||||||||
| 20 | ||||||||||||||||||||||||||||||
| 21 | ||||||||||||||||||||||||||||||
| 22 | ||||||||||||||||||||||||||||||
| 23 | ||||||||||||||||||||||||||||||
| 24 | ||||||||||||||||||||||||||||||
| 25 | ||||||||||||||||||||||||||||||
| 26 | ||||||||||||||||||||||||||||||
| 27 | ||||||||||||||||||||||||||||||
| 28 | ||||||||||||||||||||||||||||||
| 29 | ||||||||||||||||||||||||||||||
| 30 | ||||||||||||||||||||||||||||||
| 31 | ||||||||||||||||||||||||||||||
| 32 | ||||||||||||||||||||||||||||||
| 33 | ||||||||||||||||||||||||||||||
| 34 | ||||||||||||||||||||||||||||||
| 35 | ||||||||||||||||||||||||||||||
| 36 | ||||||||||||||||||||||||||||||
| 37 | ||||||||||||||||||||||||||||||
| 38 | ||||||||||||||||||||||||||||||
| 39 | ||||||||||||||||||||||||||||||
| 40 | ||||||||||||||||||||||||||||||
| 41 | ||||||||||||||||||||||||||||||
| 42 | ||||||||||||||||||||||||||||||
| 43 | ||||||||||||||||||||||||||||||
| 44 | ||||||||||||||||||||||||||||||
| 45 | ||||||||||||||||||||||||||||||
| 46 | ||||||||||||||||||||||||||||||
| 47 | ||||||||||||||||||||||||||||||
| 48 | ||||||||||||||||||||||||||||||
| 49 | ||||||||||||||||||||||||||||||
| 50 | ||||||||||||||||||||||||||||||
| 51 | ||||||||||||||||||||||||||||||
| 52 | ||||||||||||||||||||||||||||||
| 53 | ||||||||||||||||||||||||||||||
| 54 | ||||||||||||||||||||||||||||||
| 55 | ||||||||||||||||||||||||||||||
| 56 | ||||||||||||||||||||||||||||||
| 57 | ||||||||||||||||||||||||||||||
| 58 | ||||||||||||||||||||||||||||||
| 59 | ||||||||||||||||||||||||||||||
| 60 | ||||||||||||||||||||||||||||||
| 61 | ||||||||||||||||||||||||||||||
| 62 | ||||||||||||||||||||||||||||||
| 63 | ||||||||||||||||||||||||||||||
| 64 | ||||||||||||||||||||||||||||||
| 65 | ||||||||||||||||||||||||||||||
| 66 | ||||||||||||||||||||||||||||||
| 67 | ||||||||||||||||||||||||||||||
| 68 | ||||||||||||||||||||||||||||||
| 69 | ||||||||||||||||||||||||||||||
| 70 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter the date received from the Contractor. (MM/DD/YY)
File details come from the government source that posted it. Updated .