This is a Questions and Answers document addressing contractor inquiries regarding a pool facility renovation project. The document does not contain specific information about contract vehicles, set asides, response dates, or award dates, as it focuses exclusively on technical clarifications related to project scope and specifications.

The government confirmed four key requirements: grating support replacement (4' by 4') at the Triangle Pool Equipment area to address safety concerns; concrete apron resurfacing per specification 09 90 02 section 3.3 A, with apron markings to be repainted; new warning markings that match existing placement and size, with locations identified in the Pool Apron Remarking Plan; and chlorinated rubber pool paint that meets specification 09 90 02, with paint brand selection left to contractor discretion and paint colors to be chosen by the customer post-award. The government declined to specify a particular paint brand, instead requiring compliance with the provided paint specification for all marking applications including depth markings, lane markings, warning markings, and apron markings.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question Government's Response

There is existing grating inside the privacy fence at the Triangle Pool Equipment area. The grating support is deteriorated and poses a safety issue. Does the Government prefer getting the grating support replaced to resolve the safety issue?

Yes, based off of the site visit the grating support needs to be replaced. Grate is 4' by 4'

We noticed during the site visit that there are numerous areas where the existing concrete apron is flaking. There is no information in the documents provided that call out these areas to resurfaced. Please advise.

Refer to specification 09 90 02 section 3.3 A for all information regarding concrete cracks and joints regarding surface condition. The apron marking are to be repainted.

There is not a detail in the drawings for the Warning Markings. Please advise

Pool Apron Remarking Plan calls out the locations of the warning markings. New warning markings are to match existing placement and size.

Please provide a specific brand of chlorinated rubber pool paint that is to be used for the markings and please clarify the colors to be used for the different marking depth markings, lane markings, warning markings, and apron markings.

We cannot provide a specific brand of chlorinated rubber pool paint. The paint has to meet the paint specification 09 90 02 that was provided. Colors will be chosen by the customer after award.