Attachment 9 - MAHG221063 Construct Troop Walk - Addendum 1.pdf
PDF 104 KB Posted
- Attached to
- Construct Troop Walk
- Solicitation number
- FA301025R0019
About this file
This document is an Addendum to a federal construction contract for a project at Keesler Air Force Base in Mississippi. The project, titled "Construct Troop Walk" and identified by project number MAHG221063, involves modifications to the original contract specifications. The key change eliminates the requirement for the contractor to install a 10-foot by 10-foot slab sample, specifically removing Section 1.6.4 on Field Samples from the original specifications. The addendum is dated 08/12/2025 and is part of solicitation FA301025R0019, with the modification applying to all related architectural, civil, structural, mechanical, plumbing, and electrical drawings.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301025R0019
Attachment 9
ADDENDUM # 1 Date: 08/12/2025
PROJECT NAME: Construct Troop Walk
LOCATION: Larcher Boulevard – Keesler AFB, Mississippi
PROJECT NUMBER: MAHG221063
This Addendum is hereby part of the Contract Documents and as must be acknowledged with the Contract. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract Document.
When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing, and electrical drawings. The Contract Documents are hereby amended in the following particulars:
Changes to the Specifications:
Changes to the original Specifications:
The original specifications stated: Para.1.6.4.1 Slab Finish Sample 1.6.4.1.1 “Install a minimum of 10 foot by 10-foot slab. Slab finish sample must not be part of the final project. Finish as required by specifications.
The addendum will include the following changes:
1) The contractor will not be responsible for installing a sample slab for this project.
Changes to the Specifications:
Remove Section 1.6.4 Field Samples
ATTACHMENTS:
Updated Specifications
END OF ADDENDUM # 1