This document is a Material Submittals Schedule for a construction project to Construct Troop Walk, with the solicitation number FA301025R0019. The project is a Service-Disabled Veteran-Owned Small Business set-aside with an estimated construction value between $500,000 and $1,000,000. The schedule details 22 specific material submittals required throughout the project, including HAZMAT documentation, warranty information, concrete mix designs, pavement markings, geotextile fabric specifications, and various construction material requirements.

Key submission requirements include 3 copies of most documents, with specific submission timelines ranging from 5 days prior to construction to the end of the contract. Mandatory submittals include a Stormwater Pollution Prevention Plan (SWPPP), traffic and pedestrian control plan, equipment list, and detailed specifications for materials like asphalt seal coating, crushed limestone base, waterstops, and joint sealants. An organized site visit is scheduled for 30 July at 2:00 PM CDT, with specific access requirements for attendees. The project is being managed by the Department of the Air Force Air Education and Training Command, with a note that funds are not currently available and the government reserves the right to cancel the solicitation.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG 221063Project Title:
Construct Troop WalkSolicitation / Contract Number:

FA301025R0019 - ATTACHMENT 4

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1HAZMAT Questionnaire335 DAYS PRIOR TO CONSTRUCTION
2HAZMAT MSDS35 DAYS PRIOR TO CONSTRUCTION
3HAZMAT Reporting Entry Form335 DAYS PRIOR TO CONSTRUCTION
4HAZMAT Reporting Entry Form33END OF CONTRACT
5Recycling and Landfill Report33END OF CONTRACT
6Warranty (Manufacturer's)33END OF CONTRACT
71-Year Warranty (Contractor's)3END OF CONTRACT
832 01 13.62 Asphalt Seal Coating133333314 DAYS BEFORE MANUFACTURE
932 17 23 Parking Pavement Markings- Waterborne Paints3332 WEEKS PRIOR TO PLACEMENT
10Equipment List3335 DAYS PRIOR TO CONSTRUCTION
1132 01 13.62 Blacktop Crack Fillers3333335 DAYS PRIOR TO CONSTRUCTION
12SWPPP -Complete Plan33332WK AFTER AWARD
13Traffic and Pedestrians Control Plan3335 DAYS PRIOR TO CONSTRUCTION
1431 05 19.13 Geotextile Fabric333335 DAYS PRIOR TO CONSTRUCTION
1531 05 19.13 Size 610 Crushed Limestone Base3332 WEEKS PRIOR TO PLACEMENT
1603 30 00 Concrete Mix Design3332 WEEKS PRIOR TO PLACEMENT
1832 16 19 Waterstops32 WEEKS PRIOR TO PLACEMENT
1932 16 19 Joint Filler3332 WEEKS PRIOR TO PLACEMENT
2032 16 19 Joint Sealant3332 WEEKS PRIOR TO PLACEMENT
2132 16 19 Thermoplastic compound3332 WEEKS PRIOR TO PLACEMENT