Attachment 9 - Structural Repairs to Dragon Fitness_Q and As.pdf

PDF 128 KB Posted

Attached to
Structural Repairs to Dragon Fitness
Solicitation number
FA301023R0027
Issued by

About this file

This document contains questions and answers regarding structural repairs to Dragon Fitness at a Department of the Air Force base. The repairs include prepping and painting walls, transporting rubber gym flooring from an owner-furnished storage facility for installation with a new vapor barrier, and clarifying logistics for staging the flooring material. Potential mold remediation is out of scope.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301023R0027

Attachment 9

Structural Repairs to Dragon Fitness

MAHG22-1030 -- FA301023R0027

Questions & Answers

1. Drawings A101 - Interior Renovations Key Notes: No. 13 appear to have gotten cut off.

Please clarify what No. 13 states and clarify if any other notes followed.

Answer: Drawing A101 Key Note No. 13 indicates “Prep and Paint Walls”. No notes follow No. 13.

2. Mold was spotted during the site-visit. Suggest the addition of duct cleaning to scope of work.

Answer: Potential mold remediation for ceiling and air vents will not be addressed as part of this requirement.

3. Clarify the logistics for the rubber flooring.

Answer: The rubber flooring is currently stored in 2 locations on base (B4002 & B4707).

When the time comes to install flooring, contractor shall coordinate access with the Construction Manager (CM).

*SOW Paragraph 3.2.4 SCOPE (Site Preparation) states “Contractor to transport rubber gym flooring to site from Owner Furnished storage facility prior to installation.”

*SOW Paragraph 3.2.4 SCOPE (Provide and Install New) states “… installation of new vapor barrier and rubber gym flooring…”