Attachment 4 - MAHG221030 Structural Repair to Dragon Fitness_MSS.pdf

PDF 82 KB Posted

Attached to
Structural Repairs to Dragon Fitness
Solicitation number
FA301023R0027
Issued by

About this file

This document is a schedule of material submittals required for the structural repair of Dragon Fitness at Kirtland Air Force Base. The schedule lists 19 submittal items required from the contractor, including sections covering structural steel, metal fabrications, rough carpentry, thermal insulation, joint sealants, storefronts, door hardware, glazing, metal framing, gypsum board, acoustical ceilings, interior painting and other items. Each item requires shop drawings, product data, test reports, samples, manufacturer and contractor warranties to be submitted to the civil engineer 10 days after award. The schedule also includes hazard reporting forms requiring material safety data sheets and questionnaires to be submitted prior to and at the end of the project. The solicitation number for the structural repairs is FA301023R0027, issued by the Department of the Air Force Air Education and Training Command.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved 1 HazMat Questionnaire 1 5 Days Prior to Start Date 2 HazMat MSDS 1 5 Days Prior to Start Date 3 Hazmat Reporting Entry Form 1 5 Days Prior to Start Date 4 Hazmat Reporting Entry Form 1 End of

Contract 5 Recycling and Landfill Report 1 End of

Contract 6 Warranty (Manufacturer's) 1 End of

Contract 7 1-Year Warranty (Contractor) 1 End of

Contract 8 Section 05 12 00 - Structural Steel 1 1 1 1 10 Days After

Issuance of Award

9 Section 05 50 00 - Metal Fabircations

1 1 1 1 1 10 Days After Issuance of

Award

10 Section 06 10 00 - Rough Carpentry 1 1 1 1 1 10 Days After Issuance of

Award 11 Section 07 21 00 - Thermal

Insulation 1 1 1 1 1 10 Days After

Issuance of Award

12 Section 07 82 00 - Joint Sealants 1 1 1 1 1 10 Days After Issuance of

Award

13 Section 08 41 13 - Aluminum- Framed Entrances and Storefronts

1 1 1 1 1 10 Days After Issuance of

Award

14 Section 08 71 00 - Door Hardware 1 1 1 1 1 10 Days After Issuance of

Award

15 Section 08 80 00 - Glazing 1 1 1 1 1 10 Days After Issuance of

Award

16 Section 09 22 16 - Non-Structural Metal Framing

1 1 1 1 1 10 Days After Issuance of

Award

17 Section 09 29 00 - Gypsum Board 1 1 1 1 1 10 Days After Issuance of

Award

18 Section 09 51 13 - Acoustical Panel Ceilings

1 1 1 1 1 10 Days After Issuance of

Award

19 Section 09 91 23 - Interior Painting 1 1 1 1 1 10 Days After Issuance of

Award

R et ur n

Su sp en se

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

C ol or S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip

C at al og

D at a

Project Number:

MAHG 22-1030

Project Title:

STRUCTURAL REPAIR OF DRAGON FITNESS FOR KAFB

Solicitation / Contract Number:

FA301023R0027

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d Su bm is si on

D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required (if not electronically submitted)

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

1591213691C Text Box Attachment 4

File details come from the government source that posted it. Updated .