This document contains revised questions and answers regarding Solicitation Number FA301023R0027 for structural repairs to Dragon Fitness. The solicitation, issued by the Department of the Air Force Air Education and Training Command, requires the contractor to perform structural repair work including replacing seven roof trusses, installing new vapor barriers and rubber gym flooring. The questions and answers clarify details such as key notes on drawing A101, the addition of mold remediation to the scope of work, storage locations for the rubber flooring, and requirements for shoring all roof trusses where repairs are being performed.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301023R0027

Attachment 10

Structural Repairs to Dragon Fitness

MAHG22-1030 -- FA301023R0027

Revised Questions & Answers

1. Drawings A101 - Interior Renovations Key Notes: No. 13 appear to have gotten cut off.

Please clarify what No. 13 states and clarify if any other notes followed.

Answer: Drawing A101 Key Note No. 13 indicates “Prep and Paint Walls”. No notes follow No. 13.

2. Mold was spotted during the site-visit. Suggest the addition of duct cleaning to scope of work.

Answer: Mold/Mildew remediation for ceiling and air vents will be addressed as part of this requirement. An addendum is forthcoming.

3. Clarify the logistics for the rubber flooring.

Answer: The rubber flooring is currently stored in 2 locations on base (B4002 & B4707).

When the time comes to install flooring, contractor shall coordinate access with the Construction Manager (CM).

*SOW Paragraph 3.2.4 SCOPE (Site Preparation) states “Contractor to transport rubber gym flooring to site from Owner Furnished storage facility prior to installation.”

*SOW Paragraph 3.2.4 SCOPE (Provide and Install New) states “… installation of new vapor barrier and rubber gym flooring…”

4. Does the paragraph below refer to the entire roof (all trusses) or just the trusses where columns are to be replaced?

a. SOW Paragraph 3.2.4 SCOPE states: “…SITE PREPARATION: Contractor to shore existing roof trusses prior to commencing structural repair work. Shoring shall remain in place until all structural repair work is complete. Submit shoring plan for approval to Contracting Officer.”

Answer: Shoring is required at all roof trusses where repairs are to be performed (T-1 through T-7). Shoring shall be in place prior to commencing structural repair work and remaining in place until all structural repair work is complete for each truss. It is the Contractor’s option to shore all trusses at once or to shore one at a time.