Industry Questions and Government Response

View the file

Other files for this federal contract opportunity

Other files attached to Electronic Door Access System, newest first.
File Type Posted
Amendment_002.docx DOCX document
Attachment_2_PWS.doc DOC document
FA3002-17-R-0020-001_Amendment.pdf PDF
Q&A_1.xlsx XLSX spreadsheet
AccessDoorSite_Visit_Slides.pptx PPTX presentation
Q&A.xlsx XLSX spreadsheet
Combined_Synopsis_AFSAT_Door_Locks.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Offeror Generated QuestionDocumentPage #Government Response
1Please provide clarification on the doors needing hardware removed and the differences in scope between the blue and green highlighted doors on the plans.Performance Work Statement, Attachment 251 of 63Doors numbered on Performance Work Statement, Attachment 2, page 51 will require hardware removal, except for Door numbered 5. In accordance with Performance Work Statement, Attachment 2, the numbered doors pictured on page 51 of 63 require installation of new door access system equipment.

No difference between blue and green highlights, color codes internal use only.

2What are the work schedule hours and work days?Mon - Fri (Except Federal Holidays): 6:00 AM - 6:00 PM
3Will after hours be allowed if needed?No
4Will full access be allowed during access control installation of the specific areas?Yes
5Will an escort be required on this site in any areas?Yes, only in the communication rooms
6Being a fully occupied building, will cleanup need to take place daily in the specific areas or will barriers needed, if so what type is sufficient?Yes, cleanup of installation debris from job site is required prior to departing job site for the day. Use of barriers for personnel safety is required.
7Building will be unsecured during installation period, as card enrollment will be needed before full turnover?US Government personnel will be responsible for securing building at the end of every work day. Each lock will have the current USG lock core transferred to the new assembly so the USG master can lock each door.
8Installation will require more than 3 days for both buildings. Estimated 1 week per building minimum.Amendment 002 will be issued to revise the Performance Work Statement to revise removal/installation completion time from 3 calendar days to within 5 business days, for a total of 10 business days.
9What are the requirements for wiring to the end exit doors in halls for both buildings. Use conduit and run exposed below drop ceiling or use j-hooks or existing wire pathways above drop ceilings.Contractor may use either conduit (below dropped ceiling) or j-hooks (and/or existing wire pathways above drop ceilings) so long as wires are not exposed.
10Can the 3 days for completion of project be extended due to the extra wiring needed for the 4 doors at the end of each hall.Attachment 2, Section 3.147See Government Response number 8.
11Does system maintenance of one calendar day include weekendsAttachment 2, Section 3.147No. Revised PWS to change calendar day to business day. See Amendment 002
12(Remove, replace Door Access System so it is compliant Federal Information Processing Standard (FIPS) 201-1 and 202-1.) Should the system be FIPS 201-2 compliant, not 202-1? If yes, the system will be required to reside on the DoD network, so are ports available to connect to the network?Attachment 2,45This PWS requires for the Electronic Door Access System to be a standalone system, therefore the system must be FIPS 201 compliant. Amendment 002 will revise Attachment 2 to the PWS.
13Will plenum rated shielded wiring be allowed to free run in drop ceilings (as currently all exposed Ares are in conduit)Install wiring rated for this type of application, plenum-rated shielded wiring is not a requirement of the PWS.
14Is there a spec on exact door hardware or equivalent.There is no government specification for the hardware. Install reliable hardware that meets the scope requirements of the PWS.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
&"-,Bold"FA3002-17-R-0020&"-,Bold"Electronic Door Access System (Bldgs. 856 and 857), JBSA-Randolph, TX
Questions and Answers&"-,Bold"FA3002-17-R-0020

File details come from the government source that posted it. Updated .