Work_Order_Historical_Data.xlsx
XLSX spreadsheet 109 KB Posted
- Attached to
- FLECS Pathfinder Federal contract opportunity
- Solicitation number
- FA2860-16-R-0014
About this file
This document is an amendment to a solicitation for the FLECS Pathfinder contract opportunity. The amendment adds cost-reimbursable contract line item numbers (CLINs) to cover major repairs caused by third party damages, as defined in the performance work statement. The cost-reimbursable CLINs will be paid for by the Government. The proposal due date is unchanged by this amendment since the added CLINs are not expected to impact offerors' proposals. The solicitation is issued by the Department of the Air Force Headquarters District Washington for the FLECS Pathfinder program.
Work order historical data
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0002.pdf | ||
| Updated_Equipment_Inventory_(7_Apr).xls | XLS spreadsheet | |
| Q A_(Set_2).pdf | ||
| Equipment_Inventory.xls | XLS spreadsheet | |
| Q A_(Set_1).pdf | ||
| Amend_0001.pdf | ||
| FLECS_Pathfinder_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Issue ID | Open Date | Reported by | Location | Description | Action Taken | Status | Priority | Assigned | Closed Date | SME Needed? | Item Type | Path |
| 1100 | 7/1/13 | CCDE | node 1 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 7/1/13 | no | ||
| 1101 | 7/1/13 | CCDE | ecp 1 out | gate not closing, burned coil | replaced coil | closed | 2 | Vern Dave | 7/1/13 | no | ||
| 1110 | 7/2/13 | CCDE | ecp 28 in | gate not closing,loose spur gear | replaced worn spur gear | closed | 1 | Vern | 7/2/13 | no | ||
| 1111 | 7/5/13 | CCDE | ecp 1 | gate not opening,loose spur gear | reset spur gear | closed | 2 | Vern | 7/5/13 | no | ||
| 1112 | 7/6/13 | CCDE | node 22 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 7/6/13 | no | ||
| 1118 | 7/8/13 | CCDE | node 56 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 7/8/13 | no | ||
| 1119 | 7/12/13 | CCDE | ecp 28 | cannot open gate on critical app. | booted, amag, barix and 205 plc | closed | 1 | Vern | 7/12/12 | no | ||
| 1120 | 7/13/13 | CCDE | node 1 | no map command from barix | replaced faulty ethernet cable from barix | closed | 2 | Dave Gerik | 7/13/13 | no | ||
| 1121 | 7/14/13 | CCDE | ecp 13 out | gate not closing,loose spur gear | replaced worn spur gear | closed | 1 | Vern | 7/14/13 | no | ||
| 1127 | 7/22/13 | CCDE | ecp 1 in | gate not closing, burned coil | replaced coil | closed | 2 | Vern | 7/22/13 | no | ||
| 1128 | 7/22/13 | CCDE | ecp 1 out | gate not closing, burned coil | replaced coil | closed | 2 | Vern | 7/22/13 | no | ||
| 1129 | 7/26/13 | CCDE | ecp 11 in | gate not operating, broken cotter pin | replaced cotter pin on clutch/brake | closed | 2 | Vern | 7/26/13 | no | ||
| 1133 | 8/1/13 | CCDE | ecp 19 | electrical storm caused power outage | manually opened, then closed after power up | closed | 2 | All | 8/1/13 | no | ||
| 1134 | 8/1/13 | CCDE | ecp 13 | storm caused system wide problems | reset plc | closed | 1 | All | 8/1/13 | no | ||
| 1135 | 8/1/13 | CCDE | ecp 3 | storm caused system wide problems | reset plc | closed | 2 | All | 8/1/13 | no | ||
| 1136 | 8/1/13 | CCDE | ecp 4 | storm caused system wide problems | reset plc | closed | 2 | All | 8/1/13 | no | ||
| 1137 | 8/1/13 | CCDE | node 14 | storm caused system wide problems | rebooted entire node | closed | 1 | All | 8/1/13 | no | ||
| 1138 | 8/1/13 | CCDE | ecp 11 | storm caused system wide problems | replced faulty loop detector | closed | 2 | All | 8/1/13 | no | ||
| 1139 | 8/1/13 | CCDE | ecp 6 | storm caused system wide problems | reset plc | closed | 2 | All | 8/1/13 | no | ||
| 1142 | 8/1/13 | CCDE | ecp 4 out | gate hit | no visable damage | closed | 2 | Vern | 8/1/13 | no | ||
| 1153 | 8/14/13 | Sgt. Canada | south loop | Pathfinder mark outs for dig permits | marked out southern loop , power and fiber | closed | 3 | Vern | 8/14/13 | no | ||
| 1154 | 8/15/13 | Vernon | ecp 4 out | faulty gate safety edge on gate | replaced safety edge and transmitter battery | closed | 2 | Vern | 8/15/13 | no | ||
| 1159 | 8/19/13 | CCDE | ecp 8 in | got not closing, too many commands | replaced burned coil | closed | 2 | Dave | 8/19/13 | no | ||
| 1160 | 8/20/13 | CCDE | ecp 13 in | talk a phone not working | replaced faulty talk a phone | closed | 2 | Vern Dave | 8/20/13 | no | ||
| 1161 | 8/20/13 | CCDE | ecp 19 | gate not closing | changed loop detector frequency loop 2 | closed | 2 | Vern | 8/20/13 | no | ||
| 1166 | 8/21/13 | CCDE | ecp 8 in | got not closing, too many commands | replaced burned coil | closed | 2 | Dave | 8/21/13 | no | ||
| 1167 | 8/21/13 | CCDE | ecp 13 | gate opening and closing too far | wrong commands sent/reset plc | closed | 2 | Dave | 8/21/13 | no | ||
| 1168 | 8/27/13 | CCDE | ecp 28 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 8/27/13 | no | ||
| 1169 | 8/28/13 | CCDE | ecp 7 | turnstyle sticking | opened header and oiled solonoid | closed | 2 | Vern Dave | 8/28/13 | no | ||
| 1173 | 8/28/13 | CCDE | ecp 11 | APC failure, on line power | replaced faulty APC and batteries in aux. tray | closed | Vern | 10/2/13 | no | |||
| 1174 | 8/29/13 | CCDE | ecp 12 | door magnet not latching | removed loose weather stripping | closed | 2 | Vern Dave | 8/29/13 | no | ||
| 1175 | 8/29/13 | CCDE | ecp 8 in | wrong commands froze amag | replaced burned coil, rebooted amag and plc | closed | 2 | Vern Dave | 8/29/13 | no | ||
| 1176 | 8/29/13 | CCDE | ecp 1 in | wrong commands froze amag | replaced burned coil, rebooted amag and plc | closed | 2 | Vern Dave | 8/29/13 | no | ||
| 1177 | 8/29/13 | CCDE | ecp 13 | wrong commands froze amag | rebooted plc | closed | 1 | sgt Russel,Mohler | 8/29/13 | no | ||
| 1181 | 9/3/13 | CCDE | ecp 28 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 9/3/13 | no | ||
| 1182 | 9/4/13 | CCDE | ecp 24 out | not opening, guide wheel bolt broke | replaced bolt, adjusted quide wheel and gate speed | closed | 2 | Vern | 9/4/13 | no | ||
| 1183 | 9/5/13 | CCDE | ecp 24 out | gate speed keeps changing | replaced speed contol locking set screw | closed | 2 | Vern Dave | 9/5/13 | no | ||
| 1187 | 9/9/13 | CCDE | ecp 17 out | gate not opening through 205 plc | found and tightened loose wiring terminals in plc | closed | 2 | Vern | 9/9/13 | no | ||
| 1188 | 9/9/13 | CCDE | ecp 15 out | gate not opening through 205 plc | found and tightened loose wiring terminals in plc | closed | 2 | Vern | 9/9/13 | no | ||
| 1189 | 9/9/13 | CCDE | ecp 30 out | gate not opening through 205 plc | rebooted power and cleared 205 plc | closed | 2 | Vern | 9/9/13 | no | ||
| 1192 | 9/12/13 | CCDE | ecp 30 out | gate not operating | replace drive gear in gate operator | closed | 2 | Dave | 9/12/13 | no | ||
| 1194 | 9/13/13 | CCDE | ecp 30 in | drop arm drooping | adjusted prox sensor arm | closed | 2 | Vern | 9/13/13 | no | ||
| 1195 | 9/13/13 | CCDE | ecp 30 in | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 9/13/13 | no | ||
| 1198 | 9/16/13 | CCDE | ecp 13 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 9/16/13 | no | ||
| 1199 | 9/17/13 | CCDE | ecp 15 in | old gate removed, new gate installed | supervised install and reinstalled safety edge & trans. | closed | 2 | Vern Dave | 9/17/13 | no | ||
| 1206 | 9/20/13 | CCDE | ecp 20 out | not operating, hydraulic pump leaking | replaced pump, motor, and 10 gals. Hydraulic oil | closed | 2 | Dave, Sgt Mohler | 9/20/13 | no | ||
| 1207 | 9/23/13 | CCDE | ecp 19 | drop arm not closing | reset loop detector 2 | closed | 2 | Vern | 9/23/13 | no | ||
| 1208 | 9/23/13 | CCDE | ecp 29 out | turnstyle sticking | opened header and oiled solonoid | closed | 2 | Vern Dave | 9/23/13 | no | ||
| 1210 | 9/25/13 | CCDE | ecp 19 | drop arm not closing | changed detector 2 and rerouted wiring in 205 | closed | 2 | Vern | 9/25/13 | no | ||
| 1211 | 9/25/13 | CCDE | ecp 8 in | got not closing, too many commands | replaced burned coil | closed | 2 | Dave | 9/25/13 | no | ||
| 1213 | 9/26/13 | CCDE | node 24 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 9/26/13 | no | ||
| 1219 | 10/2/13 | CCDE | node 16 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 10/2/13 | no | ||
| 1220 | 10/2/13 | CCDE | ecp 24 in | drop arm motor sticking | adjusted motor belt pully | closed | 2 | Vern Dave | 10/2/13 | no | ||
| 1221 | 10/2/13 | CCDE | ecp 24 in | gate chain jerking | lubed chain | closed | 2 | Vern Dave | 10/2/13 | no | ||
| 1222 | 10/2/13 | CCDE | ecp 19 | drop arm hit | reinstalled with new hardware | closed | 2 | Dave | 10/2/13 | no | ||
| 1223 | 10/2/13 | CCDE | ecp 28 | not working remotely | reset plc at node 48, too many commands | closed | 2 | Vern | 10/2/13 | no | ||
| 1226 | 10/3/13 | CCDE | ecp 28 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 10/3/13 | no | ||
| 1227 | 10/7/13 | CCDE | ecp 8 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern Dave | 10/7/13 | no | ||
| 1228 | 10/3/13 | CCDE | node 36 | APC failure | replaced faulty APC and batteries in aux. tray | closed | 2 | Vern Dave | 10/3/13 | no | ||
| 1229 | 10/3/13 | CCDE | ecp 18 out | guide wheel arm stop broke at gate | welded new stop. | closed | 2 | Dave | 10/3/13 | no | ||
| 1230 | 10/8/13 | CCDE | ecp 8 in | got not closing, too many commands | replaced burned coil | closed | 2 | Vern Dave | 10/8/13 | no | ||
| 1232 | 10/11/13 | CCDE | ecp 4 | drop arm hit | reinstalled with new hardware | closed | 2 | Vern | 10/11/13 | no | ||
| 1234 | 10/15/13 | Vern | ecp 1 | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/15/13 | no | ||
| 1235 | 10/15/13 | Vern | ecp4 | gate inspection, | lubed chain | closed | 3 | Vern | 10/15/13 | no | ||
| 1236 | 10/15/13 | Vern | ecp 8 | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/15/13 | no | ||
| 1237 | 10/16/13 | Vern | ecp 13 | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/16/13 | no | ||
| 1238 | 10/16/13 | Vern | ecp 15 | gate inspection, | lubed chain | closed | 3 | Vern | 10/16/13 | no | ||
| 1239 | 10/16/13 | Vern | ecp 17 | gate inspection, | lubed chain | closed | 3 | Vern | 10/16/13 | no | ||
| 1240 | 10/16/13 | Vern | ecp 18 | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/16/13 | no | ||
| 1241 | 10/17/13 | Vern | ecp 19 | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/17/13 | no | ||
| 2142 | 10/17/13 | Vern | ecp 22 out | gate inspection, | lubed gate | closed | 3 | Vern Dave | 10/17/13 | no | ||
| 1243 | 10/18/13 | Vern | ecp 22 out | gate inspection, | lubed chain | closed | 3 | Vern | 10/18/13 | no | ||
| 1244 | 10/18/13 | Vern | ecp 28 | gate inspection, | lubed gate | closed | 3 | Vern | 10/18/13 | no | ||
| 1245 | 10/17/13 | Vern | ecp 30 | gate inspection, | lubed chain | closed | 3 | Vern | 10/17/13 | no | ||
| 1246 | 10/17/13 | Vern | ecp 11 | gate inspection, | lubed chain | closed | 3 | Vern | 10/17/13 | no | ||
| 1247 | 10/20/13 | CCDE | ecp 19 in | gate jammed, stuck closed | rented lift, replaced broken axel,changed bearings | closed | 2 | Vern Dave | 10/21/13 | no | ||
| 1248 | 10/22/13 | CCDE | ecp 22 in | gate inspection, | lubed chain | closed | 3 | Vern | 10/22/13 | no | ||
| 1249 | 10/22/13 | CCDE | ecp 24 in | gate inspection, | lubed chain | closed | 3 | Vern | 10/22/13 | no | ||
| 1250 | 10/25/13 | CCDE | ecp 19 out | gate stuck open no hydraulic pressure | replaced faulty accumulator tank, pump bad, replced | closed | 2 | Vern Dave | 10/29/13 | no | ||
| 1251 | 10/30/13 | CCDE | ecp 22 | drop arm hit | reinstalled with new hardware | closed | 2 | Dave | 10/30/13 | no | ||
| 1252 | 10/31/13 | CCDE | ecp 19 in | gate stuck closed | adjusted gate guide wheels | closed | 2 | Vern Dave | 10/31/13 | no | ||
| 1253 | 11/2/13 | CCDE | ecp 15 out | gate stuck closed, too many commands | rest 205 plc | closed | 2 | Vern | 11/2/13 | |||
| 1254 | 11/2/13 | CCDE | ecp 30 out | when closing, stops and opens | reset 205 | closed | 2 | Sgt Russel | 11/2/13 | |||
| 1255 | 11/2/13 | CCDE | ecp 30 out | when closing, stops and opens | reset 205 locally | closed | 2 | Sgt Russel | 11/2/13 | |||
| 1256 | 11/4/13 | Sgt. Canada | south loop | Pathfinder mark outs for dig permits | marked out southern loop , power and fiber | closed | 3 | Vern Dave | 11/4/13 | |||
| 1257 | 11/5/13 | Vern | ecp 19 in | drop arm staying open | reset loop detector 2 | closed | 2 | Vern | 11/5/13 | |||
| 1258 | 11/5/13 | Vern | ecp 4 in | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1259 | 11/5/13 | Vern | ecp 4 out | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1260 | 11/5/13 | Vern | ecp 15 in | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1261 | 11/5/13 | Vern | ecp 15 out | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1262 | 11/5/13 | Vern | ecp 17 in | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1263 | 11/5/13 | Vern | ecp 17 out | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/5/13 | |||
| 1265 | 11/6/13 | Vern | ecp 11 in | slide gate maintenance | tightened drive chain, oiled clutch brake, cotter pin | closed | 2 | Dave Sgt Mohler | 11/6/13 | |||
| 1266 | 11/6/13 | Vern | ecp 11 out | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/6/13 | |||
| 1267 | 11/6/13 | CCDE | ecp 30 | gates sticking | tightened all wire terminations in 205 plc | closed | 2 | Dave Sgt Mohler | 11/6/13 | |||
| 1268 | 11/6/13 | Vern | ecp 30 in | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/6/13 | |||
| 1269 | 11/6/13 | Vern | ecp 30 out | slide gate maintenance | tightened drive chain, oiled clutch brake | closed | 2 | Dave Sgt Mohler | 11/6/13 | |||
| 1270 | 11/8/13 | Vern | ecp 22 | drop arm sagging | adjusted prox sensor arm | closed | 3 | Vern | 11/8/13 | |||
| 1271 | 11/8/13 | Vern | ecp 1 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1272 | 11/8/13 | Vern | ecp 8 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1273 | 11/8/13 | Vern | ecp13 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1274 | 11/8/13 | Vern | ecp 18 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1275 | 11/8/13 | Vern | ecp 19 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1276 | 11/8/13 | Vern | ecp 22 out | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1277 | 11/8/13 | Vern | ecp 24 out | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1278 | 11/8/13 | Vern | ecp 28 | gate inspection, | inspected gate function for problems before weekend | closed | 3 | Vern | 11/8/13 | |||
| 1292 | 11/13/12 | CCDE | ecp 13 out | gate almost came off, end plate bolts broke | rest 205 plc, amg and replaced broken bolts | closed | 2 | Vern,Dave,Tony | 11/14/13 | |||
| 1293 | 11/15/13 | CCDE | node 27 | contrator digging near power to node 27 | marked out power and fiber lines | closed | 2 | Vern,Dave,Tony | 11/15/13 | |||
| 1294 | 11/18/13 | CCDE | ecp 22 out | high winds blew pump box door off | replaced door with new hinges | closed | 2 | Dave Tony | 11/18/13 | |||
| 1295 | 11/19/13 | CCDE | maps | map server down | restart server | closed | 1 | Sgt. Russell Gerik | 11/19/13 | |||
| 1296 | 11/19/13 | CCDE | ECP 18 | maps not working | sent to open gate manually | closed | 2 | Vern | 11/19/13 | |||
| 1298 | 11/20/13 | CCDE | ecp 23 out | not opening on command, stuck solonoid | removed header and lubed solonoid | closed | 2 | Vern,Dave,Tony | 11/20/13 | |||
| 1299 | 11/20/13 | Dave | ecp 22 in | observed loose chain bracket on gate | tightened bracket and lubed chain | closed | 2 | Dave Tony | 11/20/13 | |||
| 1300 | 11/21/30 | CCDE | Pathfinder | Amag Server shutdown | had to restart server, checking for reason | closed | 1 | Sgt. Russell Gerik | 11/21/30 | |||
| 1301 | 11/21/13 | Vern | node 100 | batteries in APC needs to be replaced | replaced batteries in APC 5000 and 2200 | closed | 3 | Vern, Dave | 11/21/30 | |||
| 1302 | 11/24/13 | CCDE | ecp 13 | drop arm opening slow | reset droparm logic board multiple times | closed | 2 | TSgt Russell Tony | 11/24/13 | |||
| 1303 | 11/24/13 | CCDE | ecp 1 out | gate not operating with badge or commands | tightened wire connections on 205 plc "very cold" | closed | 2 | Vern, Sunday on call | 11/24/13 | |||
| 1304 | 11/25/13 | CCDE | ecp 18 in | when closing, stops and opens | reset 205 locally | closed | 2 | Vern Tony TSgt Russell | 11/25/13 | |||
| 1307 | 11/28/13 | CCDE | ecp 8 in | not responding to badge commands | replaced faulty gate limit switch | closed | 2 | Sgt. Russell Tony | 11/28/13 | |||
| 1309 | 12/2/13 | CCDE | ecp 3 | tunstyle hard to turn | greased bottom bearings | closed | 2 | Dave Tony | 12/2/13 | |||
| 1310 | 12/4/13 | CCDE | ecp 17 in | drop arm knocked off by inproper entry | reinstalled with new hardware | closed | 2 | Dave Tony | 12/4/13 | |||
| 1311 | 12/9/13 | CCDE | ecp 19 in | not esponding to commands ice | removed ice from photo eye | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1312 | 12/9/13 | CCDE | ecp 1 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1313 | 12/9/13 | CCDE | ecp 4 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1314 | 12/9/13 | CCDE | ecp 8 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1315 | 12/9/13 | CCDE | ecp 13 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1316 | 12/9/13 | CCDE | ecp 17 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1317 | 12/9/13 | CCDE | ecp 18 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1318 | 12/9/13 | CCDE | ecp 22 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1319 | 12/9/13 | CCDE | ecp 24 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1320 | 12/9/13 | CCDE | ecp 28 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1321 | 12/9/13 | CCDE | ecp 30 | drop arm going into IR | remove ice from droparm reset logic board | closed | 2 | Sgt. Russell Tony | 12/9/13 | |||
| 1322 | 12/9/13 | CCDE | ecp 16 in | turnstyle solonoid in header sticking open | adjusted tension spring | closed | 2 | Dave Tony | 12/16/13 | |||
| 1323 | 12/11/13 | CCDE | ecp 13 | droparm not opening in IR | reset logic board | closed | 2 | Sgt. Russell Tony | 12/11/13 | |||
| 1324 | 12/11/13 | CCDE | ecp 13 | droparm not opening in IR | reset logic board | closed | 2 | Sgt. Russell Tony | 12/11/13 | |||
| 1325 | 12/11/13 | CCDE | ecp 13 | droparm not opening in IR | reset logic board | closed | 2 | Sgt. Russell Tony | 12/11/13 | |||
| 1326 | 12/11/13 | CCDE | ecp 5 | turnstyle came loose from fence and sticking | reattached to fence, lubed solonoid in header | closed | 2 | Vernon Dave Tony | 12/11/13 | |||
| 1327 | 12/12/13 | CCDE | ecp 19 in | gatew not opening, spur gear came off | reinstalled spur gear | closed | 2 | Vernon | 12/12/13 | |||
| 1328 | 12/12/13 | CCDE | ecp 8 | drop arm in IR | reset logic board | closed | 2 | dave | 12/12/13 | |||
| 1332 | 12/16/13 | CCDE | ecp 16 out | turnstyle solonoid in header sticking open | lubed solonoid in header | closed | 2 | Dave Tony | 12/16/13 | |||
| 1334 | 1/3/14 | CCDE | ecp 13 | not operating leaking gear box, see w.o. 1339 | added gear oil but belt is worn due to bad gear box | closed | 2 | Vernon | 1/3/14 | |||
| 1335 | 1/3/14 | CCDE | ecp 30 | droparm not opening in IR severe cold | reset logic board | closed | 2 | Vernon | 1/3/14 | |||
| 1336 | 1/3/14 | CCDE | ecp 1 | droparm not opening in IR severe cold | reset logic board | closed | 2 | Vernon | 1/3/14 | |||
| 1337 | 1/3/14 | CCDE | ecp 18 out | not closing severe cold | closed when I got there, possibly was stuck limit switch | closed | 2 | Vernon | 1/3/14 | |||
| 1338 | 1/6/14 | CCDE | ecp 1 out | not operating, hydraulic pump leaking | replaced hydralic pump and 7.5 gals of fluid | closed | 2 | Vernon Dave Tony | 1/6/14 | |||
| 1339 | 1/6/14 | CCDE | ecp 13 | drop arm not working | replaced gear box and belt | closed | 2 | Vernon Dave Tony | 1/6/14 | |||
| 1340 | 1/7/14 | CCDE | ecp 8 out | not operating, hydraulic pump leaking | replaced hydralic pump | closed | 2 | Vernon Dave Tony | 1/7/14 | |||
| 1342 | 1/8/14 | CCDE | ecp 8 out | not operating, hydraulic pump leaking again | ordered new pumps, will be here on 1/9/14 | closed | 2 | Vernon | 1/8/14 | |||
| 1344 | 1/8/14 | CCDE | ecp 28 in | drop arm in IR | reset logic board | closed | 2 | David Tony | 1/3/14 | |||
| 1345 | 1/9/14 | CCDE | ecp 29 out | talk a phone not working bad port in voip 4 | open | |||||||
| 1346 | 1/9/14 | CCDE | ecp 32 out | turnstyle solonoid in header sticking open | lubed solonoid in header | closed | 2 | David Tony | 1/13/14 | |||
| 1347 | 1/9/14 | CCDE | ecp 8 out | not operating, hydraulic pump leaking again | replace hydraulic pump and accumulator tank | closed | 2 | Vernon Dave Tony | 1/9/14 | |||
| 1348 | 1/9/14 | CCDE | ecp 11 | talk a phones not working | getting dial tone but call not connecting | open | ||||||
| 1349 | 1/9/14 | CCDE | ecp 28 in | gate not operating | replaced spur gear | closed | 2 | Dave Tony | 1/9/14 | |||
| 1350 | 1/9/14 | CCDE | ecp 28 in | limit swich junction box damaged by vehicle | replaced limit switch | closed | 2 | Dave Tony | ||||
| 1351 | 1/9/14 | CCDE | ecp 20in | turnstyle solonoid in header sticking open | lubed solonoid in header | closed | 2 | David Tony | 1/13/14 | |||
| 1352 | 1/7/14 | CCDE | ecp 8 | drop arm in IR | reset logic board | closed | 2 | Sgt. Russell | ||||
| 1355 | 1/12/14 | CCDE | ecp 30 in | gate not operating properly, bad brake solonoid | replaced solonoid | closed | David, TSgt. Russell | 1/12/14 | ||||
| 1356 | 1/12/14 | CCDE | ecp 3 out | cardreader not working | replaced cardreader | closed | David, TSgt. Russell | 1/12/14 | ||||
| 1359 | 12/27/13 | CCDE | Node 16 | APC down | Put on line power | closed | 2 | Sgt. Russell | 12/27/13 | |||
| 1360 | 1/13/14 | Vernon | ecp 28 in | Gate end plate broke off, probably hit | needs welding | open | ||||||
| 1361 | 1/13/14 | Vernon | ecp 22 out | dig permit | marked out ecp 22 out | closed | 3 | Vernon | 1/13/14 | |||
| 1362 | 1/14/14 | CCDE | ecp 18 in | drop arm knocked off by inproper entry | reinstalled with new hardware | closed | 2 | David Tony | 1/14/13 | |||
| 1363 | 1/15/14 | CCDE | ecp 24 in | drop arm knocked off by inproper entry | reinstalled with new hardware | closed | 2 | David Tony | 1/15/14 | |||
| 1365 | 1/15/14 | Vernon | ecp 24 in | dig permit | marked out ecp 24 out | closed | 3 | Vernon | 1/15/14 | |||
| 1366 | 1/15/14 | Sgt mohler | H 14 area | dig permit | marked out in hangar 14 parking lot | closed | 3 | Vern, Dave, Tony | 1/15/14 | |||
| 1367 | 1/15/14 | CCDE | ECP 28 in | Gate opening too far | found and tightened loose wiring terminals in limit sw. | closed | 2 | David Tony | 1/15/14 | |||
| 1368 | 1/16/14 | Vernon | ecp 28 | dig permit | marked out ecp 28 | closed | 3 | David Tony | 1/16/14 | |||
| 1369 | 1/16/14 | Sgt mohler | south loop | dig permit | marked out southern loop , fiber | closed | 3 | David Tony | 1/16/14 | |||
| 1340 | 1/16/14 | Sgt mohler | H 3 area | dig permit | marked out at hangar 3 | closed | 3 | David Tony | 1/16/14 | |||
| 1342 | 1/19/14 | CCDE | ecp 13 out | gate not closing | reset stuck limit switch | closed | 2 | TSgt Russell Tony | 1/19/14 | |||
| 1343 | 1/21/14 | CCDE | ecp 19 | drop arm hit | reinstalled with new hardware | closed | 2 | TSgt Russell Tony | 1/21/14 | |||
| 1345 | 1/21/14 | CCDE | ecp 8 in | gate closing halfway then opening | reset plc | closed | 2 | Vernon, TSgt Russell | 1/21/14 | |||
| 1336 | 1/22/14 | Vernon | ecp 8 in | Gate skirt bent and falling off | straightened and reinstalled skirt | closed | 2 | Vern, Dave | 1/22/14 | |||
| 1337 | 1/22/14 | CCDE | ecp 11 in | gate closing too far then opening | adjusted gate limit switch | closed | 2 | Vern, Dave, Tony | 1/22/14 | |||
| 1338 | 1/23/14 | CCDE | ecp 8 out | gate not operating, pump bad, cold hydraulic fluid | installed new pump and heat pad | closed | 2 | Vern, Dave, Tony | 1/23/14 | |||
| 1339 | 1/24/14 | Vernon | ecp 8 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/24/14 | |||
| 1340 | 1/24/14 | Vernon | ecp 8 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/24/14 | |||
| 1341 | 1/27/14 | Vernon | ecp 19 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1342 | 1/27/14 | Vernon | ecp 19 out | heat pad not wokink properly | installed new heat pad with separated thermostat | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1343 | 1/27/14 | Vernon | ecp 22 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1344 | 1/27/14 | Vernon | ecp 24 out | heat pad not wokink properly | installed new heat pad with separated thermostat | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1345 | 1/27/14 | Vernon | ecp 28 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1346 | 1/27/14 | Vernon | ecp 28 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern, Dave | 1/27/14 | |||
| 1347 | 1/27/14 | Vernon | ecp 1 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1348 | 1/27/14 | Vernon | ecp 1 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1349 | 1/27/14 | Vernon | ecp 13 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1350 | 1/27/14 | Vernon | ecp 13 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1351 | 1/27/14 | Vernon | ecp 18 in | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1352 | 1/27/14 | Vernon | ecp 18 out | heat pad not wokink properly | seperated thermostat from heating pad | closed | 2 | Vern | 1/27/14 | |||
| 1353 | 1/28/14 | CCDE | ECP 28 | drop arm hit | replaced with new hardware | closed | 2 | David Tony | 1/28/14 | |||
| 1354 | 1/28/14 | CCDE | ecp 14 1n | gate freespinning | adjusted solonoid spring | closed | 2 | David Tony | 1/28/14 | |||
| 1355 | 1/28/14 | CCDE | ecp 19 out | gate will not close, burned pump seal, lost hydralic | manually opened, then posted patol | closed | 2 | Dave | 1/28/14 | |||
| 1356 | 1/29/14 | CCDE | ecp 8 in | gate stuck closed, burned coil and coil cap | replaced coil and cap, reset amag ond plc | closed | 2 | Vern Tony | 1/29/14 | |||
| 1357 | 1/29/14 | CCDE | ecp 8 | droparm will not open, in IR | reset droparm logic board | closed | 2 | Vern Tony Dave | 1/29/14 | |||
| 1358 | 1/29/14 | CCDE | ecp 15 | droparm will not open, in IR | reset droparm logic board | closed | 2 | Sgt. Russell | 1/29/14 | |||
| 1359 | 1/29/14 | CCDE | ecp 17 | droparm will not open, in IR | reset droparm logic board | closed | 2 | Sgt. Russell | 1/29/14 | |||
| 1360 | 1/29/14 | CCDE | ecp 13 | droparm will not open, in IR | reset droparm logic board | closed | 2 | Sgt. Russell | 1/29/14 | |||
| 1361 | 1/29/14 | CCDE | ecp 1 | droparm will not open, belt loose | tightened belt | closed | 2 | Vern Tony Dave | 1/29/14 | |||
| 1362 | 1/29/14 | Vern | ecp 19 out | gate will not close, burned pump seal, lost hydralic | installed new pump and 5 gallons of hydraulic fluid | closed | 2 | Vern Tony Dave | 1/29/14 | |||
| 1363 | 1/30/14 | CCDE | ecp 2 | gate freespinning and sticking | adjusted solonoid , spring, and timer relay in header | closed | 2 | David Tony | 1/30/14 | |||
| 1369 | 2/4/14 | CCDE | ecp 13 out | gate not opening due to bad limit switch | replaced limit switch | closed | 2 | David Tony | 2/4/14 | |||
| 1370 | 2/4/14 | CCDE | ecp 19 in | drop arm sticking open | reset loop detector 2 | closed | 2 | Vern | 2/4/14 | |||
| 1371 | 2/4/14 | CCDE | ecp 19 in | call box dial pad keys are iced and sticking | removed ice andfreed up keys | closed | 2 | Vern | 2/4/14 | |||
| 1372 | 2/10/14 | CCDE | ecp 8 out | car hit gate | no damage | closed | 2 | David Tony | 2/10/14 | |||
| 1373 | 2/10/14 | David | ecp 1 | dig permit | marked out ecp 1 | closed | 2 | David Tony | 2/10/14 | |||
| 1374 | 2/11/14 | Gerik | Node 43 | Switch to battery power and back to line power | NPF | closed | 2 | Vernon, Gerik | 2/11/14 | |||
| 1375 | 2/11/14 | Vernon | ecp 24 in | drop arm opening with no vehicle present | found and tightened loose wires in 205, reset 205 | closed | 2 | Vernon, Dave | 2/11/14 | |||
| 1376 | 2/14/14 | CCDE | ecp 15 in | snow build up caused limit sync chain to come off | reinstall chain and rest limit switches | closed | 2 | Vern Tony | 2/14/14 | |||
| 1377 | 2/14/14 | CCDE | ecp 13 in | snow build up caused skirt to bend and jam gate | straightened and reinstalled skirt | closed | 2 | Vern Tony | 2/14/14 | |||
| 1378 | 2/18/14 | CCDE | ecp 28 in | snow build up caused skirt to bend and jam gate | straightened and reinstalled skirt | closed | 2 | David Tony | 2/18/14 | |||
| 1379 | 2/18/14 | CCDE | ecp 8 in | gate stuck closed, burned coil and fuse | replaced coil and fuse | closed | 2 | Vern Tony Dave | 2/18/14 | |||
| 1380 | 2/13/14 | CCDE | All gates | removed snow and reset gate plcs and drop arms | base closed, coordinated by phone, base closed | closed | 2 | Vern Tony Larry | 2/13/14 | |||
| 1381 | 2/21/14 | CCDE | ecp 1 in | gate not closing, burned coil | repaced burned coil | closed | 2 | David | 2/21/14 | |||
| 1383 | 2/25/14 | Sgt. Russell | ecp 18 in | gate not closing, spur gear missing teeth | replaced spur gear | closed | 2 | David Tony | 2/25/14 | |||
| 1384 | 2/25/14 | David | ecp 22 out | gate stuck open | cleared snow from sensor eye | closed | 2 | David | 2/25/14 | |||
| 1385 | 2/25/14 | David | ecp 24 out | gate stuck open | cleared snow from sensor eye | closed | 2 | David | 2/25/14 | |||
| 1386 | 2/25/14 | CCDE | ecp 18 in | gate stuck open | cleared snow from sensor eye | closed | 2 | David | 2/25/14 | |||
| 1387 | 2/25/14 | CCDE | ecp 18 out | gate stuck open | cleared snow from sensor eye | closed | 2 | David | 2/25/14 | |||
| 1388 | 2/26/14 | CCDE | ecp 1 | not working, apc failure took down router, node 1 | did trouble shoot, router up, node 1 on line power | closed | 2 | David,Gerik, Tony | 2/26/14 | |||
| 1389 | 2/26/14 | CCDE | ecp 2 | not working, apc failure took down router, node 1 | did trouble shoot, router up, node 1 on line power | closed | 2 | David,Gerik, Tony | 2/26/14 | |||
| 1390 | 2/27/14 | CCDE | All gates | Gate check | checked all operating functions | closed | 3 | David | 2/27/14 | |||
| 1391 | 2/28/14 | CCDE | ecp 24 in | gate and drop arm not working | base brown out, contacted base electric, back up | closed | 2 | David Tony | 2/28/14 | |||
| 1392 | 2/28/14 | CCDE | ecp 24 out | gate not working | base brown out, contacted base electric, back up | closed | 2 | David Tony | 2/28/14 | |||
| 1393 | 3/3/14 | CCDE | ecp 13 | gate not opening, skirt frozen to ground | cleared ice from bottom of skirt and ground | closed | 2 | Tony | 3/3/14 | |||
| 1394 | 3/3/14 | CCDE | ecp 19 | gate not opening, skirt frozen to ground | cleared ice from bottom of skirt and ground | closed | 2 | Tony | 3/3/14 | |||
| 1395 | 3/4/14 | CCDE | ecp 13 | gate not opening, skirt frozen to ground | cleared ice from bottom of skirt and ground | closed | 2 | David Tony | 3/4/14 | |||
| 1396 | 3/4/14 | David | ecp 8 | dig permit | marked out ecp 8 | closed | 2 | David Tony | 3/4/14 | |||
| 1397 | 3/5/14 | David | ecp 13 | dig permit | marked out ecp 13 | closed | 2 | David Tony | 3/5/14 | |||
| 1401 | 3/14/14 | CCDE | node 100 | Pathfinder called about burning smell | no problem found | closed | 2 | Tony | 3/14/14 | |||
| 1402 | 3/17/14 | CCDE | ecp 8 in | gate not working "snow storm" | replaced burned atos coil | closed | 2 | Tony | 3/17/14 | |||
| 1403 | 3/17/14 | CCDE | ecp 19 in | gate not working "snow storm" | replaced burned atos coil and fuse | closed | 2 | Tony | 3/17/14 | |||
| 1404 | 3/17/14 | CCDE | ecp 22 out | gate not working "snow storm" | replaced burned yuken coil | closed | 2 | Tony | 3/17/14 | |||
| 1409 | 3/18/14 | CCDE | ecp 19 | drop arm hit | replaced with new hardware | closed | 2 | David Tony | 3/18/14 | |||
| 1410 | 3/19/14 | CCDE | ecp 1 | not respoding to commands | reboot amag and tailgate locally | closed | 2 | David Tony | 3/19/14 | |||
| 1420 | 3/19/14 | Vernon | ecp 30 in | gate stuck open | drove over loop to close gate | closed | 2 | Vern | 3/19/14 | |||
| 1421 | 3/19/14 | Vernon | ecp 30 out | gate stuck open | drove over loop to close gate | closed | 2 | Vern | 3/19/14 | |||
| 1422 | 3/19/14 | Vernon | ecp 4 out | gate stuck open | drove over loop to close gate | closed | 2 | Vern | 3/19/14 | |||
| 1426 | 3/19/14 | CCDE | ecp 28 in | gate stuck open, reading x6"safety" in 105 plc | removed fault mystery wire from x6 | closed | 2 | Vern | 3/19/14 | |||
| 1428 | 3/20/14 | David | ecp 15 in | gate truck assemby mounting brackets loose | tightened gate truck assemby mounting brackets | closed | 2 | David Tony | 3/20/14 | |||
| 1429 | 3/20/14 | CCDE | node 1 | faulty APC | replaced Apc that was temporary on line power | closed | 2 | David Tony | 3/20/14 | |||
| 1430 | 3/20/14 | CCDE | node 62 | faulty APC | replaced Apc that was temporary on line power replaced batteries | closed | 2 | David Tony | 3/20/14 | |||
| 1431 | 3/20/14 | CCDE | node 19 | faulty APC | replaced Apc that was temporary on line power replaced batteries | closed | 2 | David Tony | 3/20/14 | |||
| 1432 | 3/20/14 | CCDE | node 43 | ecp 24 not operating properly, phasing voltages | commercial power line splice went bad. Base electric | closed | 1 | Vern Tony Dave | 3/24/14 | |||
| 1436 | 3/26/14 | CCDE | ecp 17 | droparm stuck in IR | Reset gl board | closed | 2 | Vern Tony | 3/26/14 | |||
| 1437 | 3/26/14 | CCDE | ecp 19 out | gate not operating, loose spur gear | realigned and tightened spur gear | closed | 2 | David Tony | 3/26/14 | |||
| 1438 | 3/30/14 | CCDE | ecp 28 | gate not closing, snow on photo eye | cleared snow from sensor eye | closed | 2 | Tsgt Mohler | 3/30/14 | |||
| 1439 | 3/30/14 | CCDE | ecp 8 out | gate not opening, loose spur gear | realigned and tightened spur gear | closed | 2 | Vern Tony | 3/31/14 | |||
| 1440 | 3/31/14 | CCDE | ecp 28 | drop arm stuck open, in gate will not close | reset 2 stuck loop detectors | closed | 2 | TSgt Russell | 3/31/14 | |||
| 1441 | 4/1/14 | CCDE | ecp 28 in | drop arm stuck open, in gate will not close | close loop wires tore up from weather, CE issue | 1 | Vernon | |||||
| 1442 | 4/4/14 | CCDE | ecp 19 in | gate will not close through Amag | reset both plcs locally | closed | 2 | Vernon | 4/4/14 | |||
| 1445 | 4/4/14 | CCDE | ecp 24 out | gate not operating | replaced 2 bad 1200 loop detectors w/ 1250s | closed | 2 | David Tony | 4/4/14 | |||
| 1446 | 4/5/14 | CCDE | ecp 24 | power issues, node 43 up and down line power | line power back up, contacted CE electric shop | closed | 2 | Tony | 4/5/14 | |||
| 1446 | 4/5/14 | CCDE | ecp 22 | not working correctly | reset plc | closed | 2 | Tony | 4/5/14 | |||
| 1447 | 4/11/14 | CCDE | node 43 | ecp 24 not operating , phasing voltages | repaired neutral splice in pull box with CE | closed | 2 | Vernon | 4/11/14 | |||
| 1448 | 4/11/14 | CCDE | ecp 24 in | 205 plc has blown fuse from power phasing | replaced blown fuse | closed | 2 | Vernon | 4/11/14 | |||
| 1449 | 4/11/14 | CCDE | node 43 | apc damaged due to power phasing | Put on line power | open | 2 | Vernon | 4/11/14 | |||
| 1460 | 4/13/14 | CCDE | ecp 13 | drop arm hit | replaced hardware and reinstalled droparm | closed | 2 | TSgt Russell | 4/13/14 | |||
| 1461 | 4/18/14 | CCDE | ecp 17 out | found that saftey edge trasmitter hit by vehicle | replaced transmitter and set frequency dip switches | closed | 2 | Vern Tony | 4/18/14 | |||
| 1462 | 4/21/14 | Dave | ecp 4 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1463 | 4/21/14 | Dave | ecp 4 out | gate maintenance | adjusted and lubed chain | closed | 2 | Dave Tony | 4/21/14 | |||
| 1464 | 4/21/14 | CCDE | ecp 5 | gate maintenance, sticking | lubed solonoid in header and bottom bearing | closed | 2 | Dave Tony | 4/21/14 | |||
| 1465 | 4/21/14 | Dave | ecp 6 | gate maintenance | lubed bottom bearing | closed | 2 | Dave Tony | 4/21/14 | |||
| 1466 | 4/21/14 | Dave | ecp 7 | gate maintenance | lubed bottom bearing | closed | 2 | Dave Tony | 4/21/14 | |||
| 1467 | 4/21/14 | Dave | ecp 11 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1468 | 4/21/14 | Dave | ecp 11 out | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1469 | 4/21/14 | Dave | ecp 11 in | gate rubbing retaining wall when opened | open | 2 | Dave Tony | 4/21/14 | ||||
| 1470 | 4/21/14 | Dave | ecp 15 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1471 | 4/21/14 | Dave | ecp 15 out | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1472 | 4/21/14 | Dave | ecp 17 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1473 | 4/21/14 | Dave | ecp 17 out | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1474 | 4/21/14 | Dave | ecp 30 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1475 | 4/21/14 | Dave | ecp 30 out | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1476 | 4/21/14 | Dave | ecp 24 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1477 | 4/21/14 | Dave | ecp 22 in | gate maintenance | adjusted and lubed chain and truck assembly | closed | 2 | Dave Tony | 4/21/14 | |||
| 1494 | 4/23/14 | CCDE | ecp 8 | drop arm hit, in IR | reset logic board | closed | 2 | Dave Tony | 4/23/14 | |||
| 1495 | 4/24/14 | Dave | ecp 30 out | gear box and brake assemby are worn out | replaced gear box and brake assemby | closed | 2 | Dave Tony | 4/24/14 | |||
| 1496 | 4/24/14 | Vernon | node 43 | APC bad | replaced APC, aux batteries good, replaced on 4/2013 | closed | 2 | Dave Tony | 4/24/14 | |||
| 1509 | 4/28/14 | Dave | ecp 24 in | gear box and brake assemby are worn out | replaced gear box and brake assemby | closed | 2 | Dave Tony | 4/28/14 | |||
| 1510 | 4/28/14 | CCDE | ecp 19 in | drop arm not closing keeping gate from opening | reset loop 2 | closed | 2 | Vernon | 4/28/14 | |||
| 1512 | 4/28/14 | Gerik | node 36 | lost cameras | rebooted axis servers | closed | 2 | Vernon | 4/28/14 | |||
| 1513 | 4/29/14 | Gerik | node 1 | getting tamper alarms | checked wiring and reinserted alarm plug in APC | closed | 2 | Vernon | 4/28/14 | |||
| 1514 | 4/29/14 | Gerik | ecp 4 in | talk a phone not working properly | troubleshoot, low speaker | closed | 2 | Vernon | 4/29/14 | |||
| 1516 | 4/29/14 | Vernon | ecp 30 out | gate open | drove over loop to close gate | closed | 2 | Vernon | 4/29/14 | |||
| 1517 | 4/29/14 | Vernon | ecp 4 in | drop arm not opening | reset tailgate | closed | 2 | Vernon | 4/29/14 | |||
| 1518 | 4/29/14 | CCDE | ecp 19 in | drop arm not closing keeping gate from opening | reset loop 2 | closed | 2 | Tsgt Russell | 4/29/14 | |||
| 1519 | 4/30/14 | CCDE | ecp 19 in | spur gear came loose | reset spur gear and limit | closed | 2 | Dave Tony | 4/30/14 | |||
| 1529 | 5/1/14 | CCDE | ecp 30 | drop arm hit | replaced drop arm with new hardware | closed | 2 | Dave Tony | 5/1/14 | |||
| 1530 | 5/1/14 | Vern | node 14 | node circulating fan not working | reset tripped breaker | closed | 2 | Vernon | 5/1/14 | |||
| 1531 | 5/1/14 | Vern | ecp 4 in | gate not opening | reset tailgate | closed | 2 | Vernon | 5/1/14 | |||
| 1532 | 5/1/14 | Vern | node 8 | APC batteries need changing | changed batteries in APC charger and aux tray 32 batts. | closed | 2 | Dave Tony | 5/1/14 | |||
| 1533 | 5/1/14 | CCDE | ecp 1 out | spur gear came loose | reset spur gear and limit | closed | 2 | Dave Tony | 5/1/14 | |||
| 1535 | 5/1/14 | CCDE | ecp 8 | drop arm stuck open | drop arm worked when tester was checking dc from logic | closed | 2 | Dave Tony | 5/1/14 | |||
| 1536 | 5/1/14 | CCDE | ecp 30 out | gate open | drove over loop to close gate | closed | 2 | Vernon | 5/1/14 | |||
| 1550 | 5/2/14 | Vern | node 8 | top circulating fans not working | replaced blown fuse | closed | 2 | Vernon | 5/2/14 | |||
| 1551 | 5/2/14 | CCDE | ecp 8 | drop arm stuck open | drop arm worked when tester was checking dc from logic | closed | 2 | Vernon | 5/2/14 | |||
| 1552 | 5/2/14 | CCDE | node 36 | contractor hit comm line to cam. 61 & 66 no video | contractor repaired com line | closed | Dave Tony Vern | |||||
| 1553 | 5/5/14 | CCDE | ecp 1 in | gate rubbing on limit switch damaged it | replaced limit switch | closed | 2 | Dave Tony | 5/5/14 | |||
| 1554 | 5/6/14 | CCDE | ecp 8 in | drop arm hit | replaced hardware and reinstalled droparm | closed | 2 | Vernon | 5/6/14 | |||
| 1555 | 5/6/14 | CCDE | ecp 19 in | gate wont open and x6 safety is lit on 105 plc | manually opened and closed reset plc, x6 cleared | closed | 2 | Vernon | 5/6/14 | |||
| 1556 | 5/7/14 | CCDE | ecp 8 | drop arm stuck open | tightened motor brushes | closed | 2 | Dave | 5/7/14 | |||
| 1557 | 5/8/14 | CCDE | ecp 11 in | gate closing halfway then opening | reset gate logic board, 205 plc and amag tray | closed | 2 | Tony | 5/8/14 | |||
| 1558 | 5/9/14 | CCDE | ecp 8 in | gate not closing, open coil stuck on | rest 105 plc and amag tray | closed | 2 | Vern Tony | 5/9/14 | |||
| 1559 | 5/9/14 | CCDE | ecp 11 in | gate not closing completely, 8" short | adjusted limit swich | closed | 2 | Vern Tony | 5/9/14 | |||
| 1560 | 5/9/14 | Vernon | All gates | pre gate rebuild inspection | ecp 8 & 19 needs Lidos conrtactor to clear dirt & cocrete | open | 3 | Vern | 5/9/14 | |||
| 1561 | 5/9/14 | Vernon | node 37 | fans not working | replaced door fan and fuse for top fans | closed | 2 | Vernon | 5/9/14 | |||
| 1562 | 5/13/14 | Vernon | ecp 19 in | Gate rebuild | cleaned beam installed new bearings, seals, spur gear, | closed | 3 | vern dave tony | 5/13/14 | |||
| 1563 | 5/13/14 | " | " | " | grease, guide wheels | " | " | " | " | |||
| 1565 | 5/13/14 | CCDE | ecp 19 in | gate sticking when closed, | adjusted guide wheels and speed | closed | 2 | Vernon | 5/13/14 | |||
| 1566 | 5/13/14 | CCDE | ecp 19 in | drop arm not closing keeping gate from opening | reset loop 2 | closed | 2 | Vernon | 5/13/14 | |||
| 1567 | 5/16/14 | CCDE | ecp 15 in | got calls that gate was not closing all the way | no problem found | closed | 2 | Vern Larry | 5/16/14 | |||
| 1569 | 5/19/14 | Vernon | ecp 19 out | Gate rebuild | cleaned beam installed new bearings, seals, spur gear, | closed | 3 | vern dave tony | 5/19/14 | |||
| 1578 | 5/20/14 | Vernon | ecp 22 out | Gate rebuild | cleaned beam installed new bearings, seals, spur gear, | closed | 3 | vern dave | 5/20/14 | |||
| 1579 | 5/19/14 | CCDE | ecp 1 in | gate will not open | reset loop 3 | closed | 2 | Larry | 5/19/14 | |||
| 1580 | 5/21/14 | CCDE | ecp 19 in | drop arm not closing keeping gate from opening | reset loop 2 and adjusted sensitvity | closed | 2 | vern dave | 5/21/14 | |||
| 1581 | 5/21/14 | CCDE | ecp 24 out | gate not closing, spur gear is jamming due to | cleaned beam installed new bearings, seals, spur gear, | closed | 2 | vern dave | 5/21/14 | |||
| 1582 | " | " | " | excessive canter levering | ||||||||
| 1587 | 5/28/14 | CCDE | ecp 28 in | bad spur gear motor | new pump and hydraulic fluid | closed | 2 | vern dave tony | 5/28/14 | |||
| 1588 | 5/30/14 | CCDE | ecp 1 in | bad loop detector | replaced loop detector 3 | closed | 2 | Vern, Dave | 5/30/14 | |||
| 1589 | 5/27/14 | CCDE | ecp 15 in | no power on 205 plc | replaced 205 plc base | closed | 2 | dave tony | 5/27/14 | |||
| 1590 | 6/4/14 | CCDE | ecp 1 in | bad loop in road | made safety loop gate open presence loop | closed | 2 | Vern Dave | 6/4/14 | |||
| 1591 | 6/4/14 | CCDE | ecp 1 in | droparm hit | replaced hardware and reinstalled droparm | closed | 2 | Dave | 6/4/14 | |||
| 1593 | 6/6/14 | CCDE | ecp 24 out | gate not closing, spur gear jammed | reset spur gear and adjusted guide wheels | closed | 2 | Vernon | 6/5/14 | |||
| 1595 | 6/6/14 | Vernon | ecp 30 | inbound open, droparm closed | had operator close gate, I reset tailgate locally | closed | 2 | Vernon | 6/6/14 | |||
| 1597 | 6/6/14 | CCDE | ecp 24 in | gate not opeating | no problem found | closed | 2 | Vernon | 6/6/14 | |||
| 1599 | 6/6/14 | CCDE | ecp 19 | droparm hit, vehicle left scene | replaced hardware and reinstalled droparm | closed | 2 | Vernon | 6/6/14 | |||
| 1600 | 6/10/14 | CCDE | ecp 1 in | drop arm will not open, gate open loop stuck | reset loop 3 | closed | 2 | Vernon | 6/10/14 | |||
| 1609 | 6/12/14 | CCDE | ECP 13 | Pump box door open | closed door | closed | 3 | Tsgt Russell | 6/12/14 | |||
| 1610 | 6/12/14 | CCDE | ECP 1 in | drop arm will not open, gate open loop stuck | reset loop 3 | closed | 2 | Tsgt Russell | 6/12/14 | |||
| 1611 | 6/12/14 | CCDE | ECP 13 in | Gate stuck open, stuck loop | reset loop | closed | 2 | Larry Vern | 6/12/14 | |||
| 1612 | 6/12/14 | CCDE | ECP 1 in | Safety and open presence loop are shorted | sent po request for 2 new loops | closed | 2 | Vernon | 6/12/14 | |||
| 1614 | 6/13/14 | CCDE | ECP 19 | drop arm not closing keeping gate from opening | reset loop 2 and adjusted sensitvity | closed | 2 | Vernon | 6/13/14 | |||
| 1615 | 6/16/14 | Vernon | ecp 1 in | see work order 1612 | worked with CAP gates installing and wiring new loops | closed | 2 | Vernon | 6/16/14 | |||
| 1616 | 6/16/14 | Vernon | ecp 19 in | spur gear grinding | adjusted spur gear | closed | 2 | Vern Dave | 6/16/14 | |||
| 1617 | 6/16/14 | Vern | ecp 1 in | loops cut in road | install new loops 3 & 4 | closed | 2 | Vernon | 6/16/14 | |||
| 1618 | 6/16/14 | CCDE | ecp 19 in | drop arm not closing keeping gate from opening | reset loop 2 and adjusted sensitvity | closed | 2 | Vernon | 6/16/14 | |||
| 1619 | 6/16/14 | Dave | ecp 19 in | spur gear slipping at worn spot in rack | installed new gear and longer kindorf to adjust limit | closed | 2 | vern dave tony | 6/16/14 | |||
| 1622 | 6/19/14 | Gerik | node 46 | APC down | temp. put on line power | closed | 2 | Vernon | 6/19/14 | |||
| 1635 | 6/23/14 | Vern Gerik | ecp 1 | drop arm hit | reinstalled damaged droparm | closed | 2 | Dave | 6/23/14 | |||
| 1636 | 6/23/14 | Vern Gerik | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | All | 6/23/14 | ||||
| 1637 | 6/24/14 | Vern Gerik | All gates | numorous tailgates that need to reset manually | resetting tailgates | closed | All | 6/24/14 | ||||
| 1638 | 6/24/14 | Dave | node 100 | low battery life in small 2200 APCs | changing batteries in 2 remaining APCs | closed | Dave | 6/24/14 | ||||
| 1639 | 6/25/14 | ccde | ecp 24 out | gate stuck open | adjusted guide wheels and spur gear | closed | Vern Dave | 6/25/14 | ||||
| 1640 | 6/25/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | All | 6/25/14 | ||||
| 1641 | 6/26/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | All | 6/26/14 | ||||
| 1642 | 6/27/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | All | 6/27/14 | ||||
| 1643 | 6/30/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 6/30/14 | |||
| 1644 | 7/1/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/1/14 | |||
| 1645 | 7/1/14 | CCDE | ecp 1 out | gate stuck open, jammed spur gear | adjusted spur gear | closed | 2 | Dave | 7/1/14 | |||
| 1646 | 7/2/14 | CCDE | ecp 1 out | gate stuck open, jammed spur gear | Changed spur gear | closed | 2 | Dave | 7/2/14 | |||
| 1647 | 7/3/14 | CCDE | ecp 1 out | gate stuck open | manually closed gate | closed | 2 | Tsgt Russell | 7/3/14 | |||
| 1648 | 7/6/14 | CCDE | ecp 1 out | gate stuck open | manually closed gate | closed | 2 | Tsgt Russell | 7/6/14 | |||
| 1649 | 7/7/14 | CCDE | ecp 1 out | gate stuck open, reading x6"safety" in 105 plc | changed faulty safety edge transmitter | closed | 2 | Dave Vernon | 7/7/14 | |||
| 1650 | 7/8/14 | CCDE | ecp 1 out | gate stuck open, wheel rubbing, cant adjust guide w | turned guide wheel around to push wheel away fr beam | closed | 2 | Dave Vernon | 7/8/14 | |||
| 1651 | 7/2/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/2/14 | |||
| 1652 | 7/3/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/3/14 | |||
| 1653 | 7/7/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/7/14 | |||
| 1654 | 7/8/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/8/14 | |||
| 1655 | 7/9/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/9/14 | |||
| 1656 | 7/9/14 | Vern | ecp 4 | droparm hit | replaced drop arm with new hardware | closed | 2 | Vern | 7/9/14 | |||
| 1657 | 7/10/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/10/11 | |||
| 1658 | 7/10/14 | Dave | ecp 1 | gate manually opened and manned for ceramony | closed latter in day | closed | 2 | Dave | 7/10/11 | |||
| 1659 | 7/10/14 | Dave | ecp 3 | gate manually opened and manned for ceramony | closed latter in day | closed | 2 | Vern | 7/10/11 | |||
| 1660 | 7/10/14 | CCDE | ecp 22 out | gate hit by driver | with investigations, gate down chaned off | 2 | Vern Dave Tony | |||||
| 1661 | 7/10/14 | CCDE | ecp 11 | gate stuck halFway in IR | reset gate operator | closed | 2 | Tony | 7/10/11 | |||
| 1662 | 7/10/14 | CCDE | ecp 4 IN | after hours tailgate | reset tailgate | closed | 2 | Tony | 7/10/11 | |||
| 1663 | 7/11/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/11/14 | |||
| 1664 | 7/11/14 | CCDE | ecp 1 out | gate stuck open, needs new wheels, rebuild | closed with pry bar | closed | 2 | Tony | 7/11/14 | |||
| 1665 | 7/13/14 | CCDE | ecp 1 out | gate stuck open, needs new wheels, rebuild | closed with pry bar | closed | 2 | Tony | 7/13/14 | |||
| 1666 | 7/14/14 | CCDE | ecp 3 | cardreader not working, no power | APC down, temporary on line power | closed | 2 | Vern | 7/14/14 | |||
| 1667 | 7/14/14 | Vern | ecp 24 in | drop arm in tailgate multiple times during the day | manually reset tailgate in 205 plc | closed | 2 | Vern Dave | 7/14/14 | |||
| 1668 | 7/14/14 | Vern | ecp 1 | drop arm in tailgate multiple times during the day | manually reset tailgate in 205 plc | closed | 2 | Vern Dave | 7/14/14 | |||
| 1669 | 7/14/14 | Vern | ecp 4 | drop arm in tailgate multiple times during the day | manually reset tailgate in 205 plc | closed | 2 | Vern Dave | 7/14/14 | |||
| 1670 | 7/15/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/15/14 | |||
| 1671 | 7/16/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gats 205 plc | closed | 2 | All | 7/16/14 | |||
| 1672 | 7/16/14 | CCDE | NODE 100 | strong smell and vapor coming from rack 1 | disconnected apc | closed | 2 | Tony | 7/16/14 | |||
| 1673 | 7/17/14 | Vern | NODE 100 | inspected battery trays, found acid leaking from | installed 8 new batteries in damaged battery tray and | closed | 2 | Vern Dave | 7/17/14 | |||
| 1674 | " | " | " | faulty battery, removed battery tray | also changed 16 more in 2 trays below it | closed | 2 | Vern Dave | " | |||
| 1675 | 7/17/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gates 205 plc | closed | 2 | All | 7/17/14 | |||
| 1676 | 7/18/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gates 205 plc | closed | 2 | All | 7/18/14 | |||
| 1677 | 7/18/14 | CCDE | ECP 1 OUT | Gate stuck open due to bad spot in gear rack | adjusted limit switch so gate stops prior to worn spot | closed | 2 | Vern Tony | 7/18/14 | |||
| 1681 | 7/21/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gates 205 plc | closed | 2 | All | 7/21/14 | |||
| 1682 | 7/22/14 | All | All gates | numorous tailgates that need to reset manually | resetting tailgates at gates 205 plc | closed | 2 | All | 7/22/14 | |||
| 1683 | 7/22/14 | Richard | All ecps | restarted pathfinder, multiple tasks | closed manually open criticles and tested | closed | 2 | All | 7/22/14 | |||
| 1684 | 7/23/14 | Vern | ecp 24 out | stuck open, excessive canterlevering | adjusted guide wheel, gate limit swich and speed | closed | 2 | Vern | 7/23/14 | |||
| 1689 | 7/29/14 | CCDE | ecp 8 | drop arm hit, falling | reinstalled droparm with new hardware | closed | 2 | Dave, Tony | 7/29/14 | |||
| 1690 | 7/29/14 | CCDE | ecp 8 | Gate skirt bent and falling off | straightened and reinstalled skirt | closed | 2 | Dave, Tony | 7/29/14 | |||
| 1691 | 7/24/14 | TSgt Russell | ecp 28 in | Leidos trenching around gate | opened and closed gate | closed | 2 | Vern | 7/24/14 | |||
| 1692 | 7/24/14 | TSgt Russell | ecp 28 out | Leidos trenching around gate | opened and closed gate | closed | 2 | Vern | 7/24/14 | |||
| 1693 | 7/25/14 | TSgt Russell | ecp 28 in | Leidos trenching around gate | opened and closed gate | closed | 2 | Dave, Tony | 7/25/14 | |||
| 1694 | 7/25/14 | TSgt Russell | ecp 28 out | Leidos trenching around gate | opened and closed gate | closed | 2 | Dave, Tony | 7/25/14 | |||
| 1695 | 7/25/14 | TSgt Russell | ecp 28 in | Leidos trenching around gate | opened and closed gate | closed | 2 | Dave, Tony | 7/25/14 | |||
| 1696 | 7/25/14 | TSgt Russell | ecp 28 out | Leidos trenching around gate | opened and closed gate | closed | 2 | Dave, Tony | 7/25/14 | |||
| 1697 | 7/28/14 | CCDE | ecp 8 out | gate hit by driver, tailgating out | checked for damage, none found | closed | 2 | Dave, Tony | 7/28/14 | |||
| 1698 | 7/28/14 | CCDE | ecp 19 in | gate bouncing, too many commands sent | reset plcs locally | closed | 2 | Dave, Tony | 7/28/14 | |||
| 1699 | 7/30/14 | Vern | node 37 | Liedos claims we have APC issues | Installed new APC and aux. battery units | closed | 2 | Vern, Dave, Tony | 7/30/14 | |||
| 1700 | 7/30/14 | Vern | node 46 | APC down, on line power | Installed new APC | closed | 2 | Vern, Dave, Tony | 7/30/14 | |||
| 1701 | 7/31/14 | Vern | node 3 | APC down, on line power | Installed new APC | closed | 2 | Vern, Dave, Tony | 7/31/14 | |||
| 1702 | 7/31/14 | CCDE | ecp 13 out | Stuck open , gate hit which opened it too far | pryed gate free and adjusted limit switch | closed | 2 | Vern | 7/31/14 | |||
| 1703 | 7/31/14 | CCDE | ecp 17 | drop arm hit, falling | reinstalled droparm with new hardware | closed | 2 | Vern | 7/31/14 | |||
| 1704 | 8/7/14 | Vern | node 45 | Amag DBU and Nic not working | Installed new DBU and Nic, programmed nic | closed | 2 | Gerik, Vern | 8/7/14 | |||
| 1705 | 8/8/14 | VC | VC | Signature pad issues | Signature pad working | closed | 2 | Gerik | 8/8/14 | |||
| 1707 | 8/4/14 | Vern | All gates | preventive maintenance | inspected gate function for problems | closed | 2 | Vern | 8/4/14 | |||
| 1708 | 8/5/14 | Vern | All gates | preventive maintenance | inspected gate function for problems | closed | 2 | Vern | 8/5/14 | |||
| 1709 | 8/6/14 | Vern | All gates | preventive maintenance | inspected gate function for problems | closed | 2 | Vern | 8/6/14 | |||
| 1710 | 8/12/14 | David | ecp 19 out | hydraulic pump contactor not staying ingaged | trouble shoot in rain, next day found faulty pressure sw. | closed | 2 | Vern, Dave | 8/13/14 | |||
| 1711 | 8/13/14 | Vern | ecp 28 in | removed pressure switch, gate open for Leidos | installed in ecp 19 out, ordered more pressure switches | closed | 2 | Vern | 8/13/14 | |||
| 1712 | 8/13/14 | Dave | ecp 17 in | gate hit, tore off safety edge, shorted transmitter | installed new safety edge and transmitter | closed | 2 | Vern | 8/13/14 | |||
| 1713 | 8/13/14 | Vern | ecp 27 in | gate not being used, took transmitter | installed transmitter in ecp 17 from ecp 27 | closed | 2 | Dave, Vern | 8/13/14 | |||
| 1714 | 8/14/14 | Vern | ecp 27 in | need new safety edge transmitter | ordered transmitters | closed | 2 | Vern | 8/14/14 | |||
| 1715 | 8/13/14 | CCDE | ecp 15 out | not working remotely through amag | reset gate operator, plc and amag, still not working | open | 2 | Dave, Mohler, Malone | 8/13/14 | |||
| 1721 | 8/15/14 | Vern | all gates | preventive maintenance | inspected gate function for problems | closed | 2 | Vern | 8/15/14 | |||
| 1722 | 8/20/14 | Gerik | node 20 | apc reports bad battery needs replacing | replaced 40 12volt batteries in apc and aux trays | closed | 2 | Dave, Vern | 8/20/14 | |||
| 1723 | 8/20/14 | CCDE | node 62 | not receiving remote commands to 15 out | reboot plc | open | 2 | Dave Tony | 8/20/14 | |||
| 1728 | 8/22/14 | CCDE | cam D5 | not working, Leidos contractor hit line | troubleshoot, did not appear to be our line | closed | 2 | Vern Dave | 8/22/14 | |||
| 1729 | 8/24/14 | CCDE | ecp 19 in | gate stuck open | replace spur gear | closed | 2 | Dave, Malone | 8/24/14 | |||
| 1730 | 8/25/14 | CCDE | cam D5 | traced wiring and determined it was our lines hit | worked with contractor to make repairs | closed | 2 | Vernon | 8/25/14 | |||
| 1731 | 8/25/14 | Vern | ecp 28 in | from w.o. 1711 pressure switch came in | installed pressure switch ans 5 gallons of hydraulic fluid | closed | 2 | Vern Dave | 8/25/14 | |||
| 1732 | 8/27/14 | Dave | ecp 19 in | gear rack worn bad, spur gear misses.. | cut off gear rack and welded on new rack | closed | 2 | Vern Dave | 8/27/14 | |||
| 1733 | 8/28/14 | Dave | ecp 1 out | gear rack worn bad, spur gear misses.. | cut off gear rack and welded on new rack | closed | 2 | Vern Dave | 8/28/14 | |||
| 1734 | 8/28/14 | CCDE | ecp 13 in | reported not working | no problem found | closed | 2 | Vernon | 8/28/14 | |||
| 1735 | 8/30/14 | CCDE | ecp 28 in | gate stuck open | replace spur gear, Saturday, labor day weekend | closed | 2 | Vernon | 8/30/14 | |||
| 1737 | 9/3/14 | Vern | ecp 30 in | drop arm sagging | adjusted and tightened drop arm prox sensor arm | closed | 2 | Vern Dave | 9/3/14 | |||
| 1738 | 9/3/14 | Vern | ecp 30 in | found damaged gate safety edge | replaced faulty safety edge and transmitter battery | closed | 2 | Vern Dave | 9/3/14 | |||
| 1739 | 9/3/14 | Vern | ecp 30 out | found damaged gate safety edge | replaced faulty safety edge and transmitter battery | closed | 2 | Vern Dave | 9/3/14 | |||
| 1740 | 9/3/14 | Vern | ecp 30 in | gate maintenance needed | tightened and lubricated chain, adjust close limit switch | closed | 2 | Vern Dave | 9/3/14 |