Pages from Attachment 5h - HAFB Landscape Standards - 06 27 2017-10 (1).pdf

PDF 37 MB Posted

Attached to
Sitework and Paving IDIQ at Hanscom AFB Federal contract opportunity
Solicitation number
FA283521B0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

This document provides details for a federal solicitation seeking sitework and paving services at Hanscom Air Force Base and surrounding locations. The solicitation is for an indefinite delivery/indefinite quantity contract with a maximum value of $25 million to be awarded as a 100% small business set-aside for offerors headquartered within 60 miles of Hanscom AFB. Services will include road, curb, and sidewalk repair/replacement along with associated demolition and earthwork. Work will be conducted at Hanscom AFB, the Sagamore Hill Electronics Research Annex, Fourth Cliff Recreation Annex, Cape Cod Air Force Station, Patriot Golf Course, and New Boston Air Force Station in accordance with the base sitework and paving statement of work dated July 2, 2020. The minimum task order value is $2,500 with no single order exceeding $3,000,000. Questions are due by November 19, 2020 and bids must be delivered between 9-12 AM EST on December 4, 2020 with bid opening scheduled for 2 PM that same day via Zoom. The contracting agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom AFB.

View the file

Other files for this federal contract opportunity

Other files attached to Sitework and Paving IDIQ at Hanscom AFB, newest first.
File Type Posted
Abstract of Offerors 12-6 (1).pdf PDF
Bid Opening Call-in Info UPDATE.pdf PDF
Bid Opening Call-in Info.pdf PDF
RFI - Questions and Answers.pdf PDF
Pages from Attachment 5e - HAFB Landscape Standards - 06 27 2017-5.pdf PDF
Pages from Attachment 5f - HAFB Landscape Standards - 06 27 2017-6.pdf PDF
Pages from Attachment 5A- HAFB Landscape Standards - 06 27 2017-2.pdf PDF
Pages from Attachment 5j - HAFB Landscape Standards - 06 27 2017-12.pdf PDF
Pages from Attachment 5i - HAFB Landscape Standards - 06 27 2017-11.pdf PDF
Pages from Attachment 5d- HAFB Landscape Standards - 06 27 2017-4.pdf PDF
Pages from Attachment 5b - HAFB Landscape Standards - 06 27 2017-2.pdf PDF
Pages from Attachment 5c - HAFB Landscape Standards - 06 27 2017-3.pdf PDF
Solicitation - FA283521B0001.pdf PDF
Attachment 12 - HAFB Stormwater IDDE Plan.pdf PDF
Attachment 10 - HAFB Stormwater Pollution Prevention Plan (DRAFT).pdf PDF
Attachment 4 - HAFB Architectural Compatibility Plan - Jan 2013.pdf PDF
Attachment 3 - HAFB Design Guide - Oct 2018.pdf PDF
Attachment 1 - Sitework and Paving Specs.pdf PDF
Wage Determination 13.pdf PDF
Wage Determination 12.pdf PDF
Wage Determination 03.pdf PDF
Attachment 9 - HAFB Contractor HAZMAT SOP - Nov 2019.pdf PDF
SOW (Small).pdf PDF
FY21 S and P IDIQ - Bid Schedule - FINAL.xlsx XLSX spreadsheet
Attachment 11 - HAFB Operations and Maintenace Manual (DRAFT).pdf PDF
Attachment 8 - HAFB Stormwater Management - Feb 2020.pdf PDF
Attachment 7 - HAFB CNS Site Stormwater Control - Jul 2019.pdf PDF
Attachment 2 - Base Paving and Sitework Standard Details.pdf PDF
Wage Determination 01 25 September 2020.pdf PDF
Attachment 6 - HAFB Contractor Env Guide Rev - Nov 2019.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HANSCOM AIR FORCE BASE LANDSCAPE DESIGN STANDARDS

8.04 BUILDING 1531

2. REMOVE YEWS

2. REMOVE YEWS

6. REMOVE SHRUBS5. REMOVE ROCK

2. REMOVE YEWS

1. REMOVE RHODODENDRON

3. REMOVE TREE 4. REMOVE SHRUBS

8.05 BUILDING 1534

1. PROTECT CRABAPPLES

3. REMOVE SHRUB &

CRABAPPLES

4. PROTECT CRABAPPLES,

PRUNE

5. REMOVE SHRUBS

6. PROTECT CRABAPPLES,

PRUNE

2. REMOVE SHRUBS

8.05 BUILDING 1534

1 & 2. PROTECT CRABAPPLE & REMOVE SHUBS

3. REMOVE SHRUBS &CRABAPPLE

6. PROTECT CRABAPPLE

5. REMOVE SHRUBS 4 & 5. PROTECT CRABAPPLE & REMOVE SHRUBS

5 & 6. REMOVE SHRUBS & PROTECT CRABAPPLE

3. REMOVE SHRUBS &CRABAPPLE

1 & 2. PROTECT CRABAPPLE & REMOVE SHUBS

8.06 BUILDING 1535

2. REMOVE SHRUBS

1. PROTECT TREES,

LIFT LOW BRANCH

8.06 BUILDING 1535

2. REMOVE SHRUBS

1. PROTECT TREES,

LIFT LOW BRANCH

8.07 BUILDING 1538

2. REMOVE

SHRUB

1. REMOVE

SHRUBS

PRUNE TREES

3. REMOVE

YEW

8.07 BUILDING 1538

1. REMOVE SHRUBS

2. REMOVE SHRUB

1. REMOVE SHRUBS

3. REMOVE YEW

8.08 BUILDING 1540

8. PROTECT CHERRY,

REMOVE YEWS

5. REMOVE SHRUBS

2. PROTECT TREE,

LIFT BRANCH

1. PROTECT CHERRY,

REMOVE GROUNDCOVER

3. REMOVE SHRUBS

4. REMOVE SHRUBS

6. REMOVE SHRUBS

7. REMOVE SHRUBS

8.08 BUILDING 1540

7 & 8. REMOVE SHRUBS & PROTECT CHERRY, REMOVE

YEWS

4. REMOVE SHRUBS

2 & 3. PROTECT TREE, LIFT BRANCH & REMOVE

SHRUBS

5. REMOVE SHRUBS

1. PROTECT CHERRY, REMOVE GROUNDCOVER

6. REMOVE SHRUBS

8.09 BUILDING 1543

PRUNE TREES

3. REMOVE ALL

SHRUBS

2. REMOVE

EVERGREEN

1. REMOVE YEWS

4. REMOVE ALL

SHRUBS

8.09 BUILDING 1543

3. REMOVE ALL SHRUBS

2. REMOVE EVERGREEN1. REMOVE YEWS

4. REMOVE ALL SHRUBS 4. REMOVE ALL SHRUBS

3. REMOVE ALL SHRUBS

3. REMOVE ALL SHRUBS3. REMOVE ALL SHRUBS

8.10 BUILDING 1603

12. REMOVE SHRUBS

4. REMOVE SHRUBS

5. REMOVE SHRUBS

2. REMOVE SHRUBS

1. PROTECT BIRCH

9. REMOVE SHRUBS

11. REMOVE SHRUBS

3. PROTECT TREE,

LIMB UP

6. PROTECT TREE,

LIMB UP

8. PROTECT TREE,

LIMB UP

7. REMOVE SHRUB

10. REMOVE ALL

SHRUBS AROUND

GAZEBO

8.10 BUILDING 1603

2. REMOVE SHRUBS

2. REMOVE SHRUBS

2. REMOVE SHRUBS

1 & 3. PROTECT BIRCH & PROTEC TREE, LIMB UP

4 & 6. REMOVE SHRUBS & PROTECT TREE, LIMB UP

7 & 9 & 8. REMOVE SHRUBS & PROTECT TREE, LIMB UP5. REMOVE SHRUBS

9. REMOVE SHRUBS

8.10 BUILDING 1603

11. REMOVE SHRUBS

10. REMOVE ALL SHRUBS AROUND GAZAEBO

12. REMOVE SHRUBS 12. REMOVE SHRUBS

11. REMOVE SHRUBS

8.11 BUILDING 1604

NO REMOVALS

PROPOSED PLANTING ONLY

8.12 BUILDING 1605

CROWN THIN

2. PROTECT CRABAPPLE

4. REMOVE SHRUBS

1. REMOVE SHRUBS

CROWN THIN

3. REMOVE SHRUBS

8.12 BUILDING 1605

4. REMOVE SHRUBS 2 & 3. PROTECT CRABAPPLE & REMOVE SHRUBS

1. REMOVE SHRUBS 1 & 3. REMOVE SHRUBS

8.13 BUILDING 1606

8. REMOVE ALL

PLANTING MATERIAL

7. PROTECT CRABAPPLE,

PRUNE

6. REMOVE ALL

PLANTING MATERIAL

5. REMOVE SHRUBS

1. REMOVE SHRUBS

2. REMOVE SHRUBS

3. REMOVE EVERGREEN

4. REMOVE SHRUB

9. REMOVE SHRUBS

10. REMOVE SHRUBS

AND GROUNDCOVER

5. REMOVE SHRUBS5. REMOVE SHRUBS

1.REMOVE SHRUBS

3. REMOVE EVERGREEN

6. REMOVE ALL PLANTING MATERIAL

2. REMOVE SHRUBS

6. REMOVE ALL PLANTING MATERIAL

4 & 6. REMOVE SHRUB & REMOVE ALL PLANTING

MATERIAL

7. PROTECT CRABAPPLE, PRUNE

9. REMOVE SHRUBS

6. REMOVE ALL PLANTING MATERIAL 6. REMOVE ALL PLANTING MATERIAL

10. REMOVE SHRUBS AND GROUNDCOVER

8. REMOVE ALL PLANTING MATERIAL

10. REMOVE SHRUBS AND GROUNDCOVER

9. REMOVE SHRUBS

8.14 BUILDING 1607

4. REMOVE SHRUBS

3. PROTECT CHERRY

TREE, PRUNE

2. REMOVE SHRUBS

5. REMOVE SHRUBS

8.14 BUILDING 1607

5 . REMOVE SHRUBS

1. REMOVE SHRUBS

4. REMOVE SHRUBS 4. REMOVE SHRUBS

2 & 3. REMOVE SHRUBS & PROTECT CHERRY TREE,

PRUNE

4. REMOVE SHRUBS

8.15 BUILDING 1612

7. PROTECT CRABAPPLES,

PRUNE

4. REMOVE SHRUBS

3. REMOVE SHRUBS

2. REMOVE SHRUBS

1. REMOVE SHRUBS

6. PROTECT PINE

5. PROTECT CHERRY

TREE, PRUNE

8.15 BUILDING 1612

1. REMOVE SHRUBS

2. REMOVE SHRUBS

6. PROTECT PINE

5. PROTECT CHERRY TREE, PRUNE

7. PROTECT CRABAPPLE, PRUNE

8.16 BUILDING 1614(1)

6. PROTECT BIRCHES

4. REMOVE SHRUBS

& BIRCHES

3. REMOVE SHRUBS

2. PROTECT EVERGREEN

TREE, REMOVE SHRUB

1. REMOVE SHRUBS

5. PROTECT

GROUNDCOVER

7. PROTECT EVERGREEN

TREE, REMOVE SHRUB

3. REMOVE SHRUBS

1. REMOVE SHRUBS

1. REMOVE SHRUBS

1. REMOVE SHRUBS 1. REMOVE SHRUBS

1. REMOVE SHRUBS

1. REMOVE SHRUBS

3 & 2. REMOVE SHRUBS & PROTECT EVERGREEN TREE,

REMOVE SHRUBS

4 & 5. REMOVE SHRUBS & PROTECT GROUNDCOVER

4 & 5. REMOVE SHRUBS & PROTECT GROUNDCOVER

4 & 5. REMOVE SHRUBS & PROTECT GROUNDCOVER

4 & 5. REMOVE SHRUBS & PROTECT GROUNDCOVER 4 & 5 & 6. REMOVE SHRUBS AND BIRCH & PROTECT

GROUNDCOVER & PROTECT BIRCH

5 & 6. PROTECT GROUNDCOVER & BIRCHES

4. REMOVE SHRUBS

7. PROTECT EVERGREEN TREE, REMOVE SHRUBS

8.16 BUILDING 1614(2)

6. REMOVE SHRUBS

3. REMOVE SHRUBS

2. REMOVE SHRUBS

1. REMOVE SHRUBS

4. REMOVE SHRUBS

5. PROTECT BIRCH

7. PROTECT

GROUNDCOVER

8.16 BUILDING 1614(2)

1. REMOVE SHRUBS

2. REMOVE SHRUBS

1. REMOVE SHRUBS 1. REMOVE SHRUBS

File details come from the government source that posted it. Updated .