Performance Work Statement Summary

This Performance Work Statement (PWS) dated 13 August 2026 outlines an electrical system upgrade and exterior lighting replacement project at Eglin Air Force Base, Florida, scheduled for November 2-6, 2026 (5 business days). The contractor shall provide all labor, materials, and equipment to complete the following scope: demolish and remove the existing main electrical panel and install a new panel with new circuit breakers and watertight conduit seals; replace twelve existing exterior wall receptacles with new 20-amp rated devices connected to a new GFCI breaker, including removal of extension boxes and installation of in-use covers; install fifteen new circuit breakers in the existing load center sub-panel; and remove six existing exterior safety wall lights with wood mounting plates and install six new LED wall pack lights with watertight sealing.

All work must comply with applicable national, state, and local codes and regulations, utilize new materials meeting or exceeding industry standards, and include contractor responsibility for all necessary permits and inspections. The work area must be kept clean and free of debris at all times. Deliverables include weekly progress reports submitted every Friday, a final inspection report upon project completion, and as-built drawings due within 10 days of completion. The government will provide access to the work site and electrical rooms. No contract vehicle, set-asides, pricing terms, or response dates are specified in this PWS.

View the file

Other files

File Type Posted
Electrical Work Questions and Answers.pdf PDF
Combo_Redacted.pdf PDF
PWS dated 21 July 2026_Redacted.pdf PDF
SIite Visit and Due Dates.pdf PDF
Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

(PWS) 1 August 2026

Project Title: Electrical System Upgrade and Exterior Lighting Replacement

1.0 Background

The existing electrical system has several components that are outdated, unsafe, or not up to current code standards. The exterior lighting is inefficient and requires frequent maintenance.

This project is to repair the electrical system and replace the exterior lighting to improve safety, reliability, and energy efficiency.

2.0 Scope of Work

The contractor shall provide all labor, materials, and equipment necessary to perform the following tasks:

2.1 Main Electrical Panel Replacement

Demolish and remove the existing main electrical panel.

Install a new main electrical panel with all new circuit breakers.

Seal all wall penetrations to ensure a watertight seal around conduits.

2.2 Exterior Receptacle Replacement

Replace twelve (12) existing exterior wall receptacles with new 20-amp rated devices.

Connect the new receptacles to a new Ground Fault Circuit Interrupter (GFCI) breaker in the main panel.

Remove any existing extension boxes on the exterior receptacles.

Install new receptacles and in-use (bubble) covers for all exterior receptacles.

2.3 Sub-Panel Breaker Refresh

Install fifteen (15) new circuit breakers in the existing load center sub-panel to refresh the panel's integrity.

2.4 Exterior Lighting Replacement

Remove and dispose of six (6) existing exterior safety wall lights and their associated wood mounting plates.

Install six (6) new LED wall pack lights.

Mount and seal the new light fixtures to the building to ensure a watertight installation.

3.0 Performance Requirements

All work shall be performed in a professional manner and in accordance with all applicable national, state, and local codes and regulations.

All materials and equipment shall be new and of a quality that meets or exceeds industry standards.

The contractor shall be responsible for all necessary permits and inspections.

The work area shall be kept clean and free of debris at all times.

4.0 Deliverables

Deliverable Due Date

Performance Work Statement

(PWS) 1 August 2026

Project Schedule Work to be completed November 2-6, 2026. (5 Business Days) Be sure to have all necessary materials and equipment to complete the work.

Weekly Progress Reports

Every Friday

Final Inspection Report

Upon project completion

As-Built Drawings Within 10 days of project completion

5.0 Government-Furnished Equipment and Information (GFE/GFI)

The government will provide access to the work site and electrical rooms.

6.0 Place of Performance

The work will be performed at Eglin AFB, FL

7.0 Period of Performance

The period of performance for this contract is November 2-6, 2026.