Electrical Work Questions and Answers.pdf
PDF 112 KB Posted
- Attached to
- ELECTRICAL WORK
- Solicitation number
- FA2823-26-Q-A111
About this file
This is a Questions and Answers document addressing contractor inquiries regarding electrical work at Eglin Air Force Base, Florida.
The 96 Test Support facility requires electrical installation work including exterior wall pack lighting. No design drawings or historical documents are available for this requirement. The contractor is responsible for obtaining all necessary permits and inspections in compliance with applicable national, state, and local codes and regulations. The 96th Civil Engineer Group (96 CEG) oversees and administers the permitting and inspection process, with government inspection and acceptance satisfying contract compliance and permit requirements. Contractors are not required to retain an independent third-party electrical inspector. Exterior wall packs must be LED-type safety lights that activate during hours of darkness, are exterior-rated, mounted securely without compromising weatherproofing or structural integrity, and cannot utilize wood mounting as previously implemented. No specific brand or model requirements are mandated. Contractors must submit a custom submittal package including a Firm-Fixed-Price (FFP) quote that incorporates past performance information and technical capability details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS dated 13 Aug 2026_Redacted.pdf | ||
| Combo_Redacted.pdf | ||
| Clauses.pdf | ||
| PWS dated 21 July 2026_Redacted.pdf | ||
| SIite Visit and Due Dates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Work Questions
1. Are there any drawings for this requirement? 96 Test Support does not have any drawings or historical documents.
2. Section 3.0 of the Statement of Work states that the contractor is responsible for obtaining all necessary permits and inspections and that the work must comply with applicable national, state, and local codes and regulations.
Because this work will be performed at Eglin Air Force Base, Florida, please identify the Authority Having Jurisdiction for the electrical installation and clarify the applicable permitting and inspection process.
Specifically, please confirm whether:
• Eglin AFB or the United States Air Force will issue and administer the electrical permit;
The 96th Civil Engineer Group (96 CEG) oversees and administers the process.
Government inspection and acceptance of the installation will satisfy the contracts compliance and permit requirements.
• The 96th Civil Engineer Group, Base Civil Engineer, or another designated Air Force representative will perform the required inspections;
Yes
• The contractor must retain an independent third-party electrical inspector; or No
• Government inspection and acceptance will satisfy the permit and inspection requirement.
Yes
3. This will require a custom submittal package from the contractor, correct?
Yes. Please include a Firm-Fixed-Price (FFP) quote that incorporates your past performance information and technical capability details.
4. Are there specific make and model requirements for the exterior wall packs the contractor will be installing? No specific brand. Needs to be exterior rated safety lights that come on during the hours of darkness. Needs to be LED type. Needs to be mounted securely and does not compromise the weather proofing and structural integrity of the facility.
Plus, they can’t be mounted utilizing wood as they are now.