Access Control System QA.pdf
PDF 541 KB Posted
- Solicitation number
- FA282324Q0052
About this file
This document appears to be a set of questions and answers related to the solicitation for the Purchase & Installation of a Lenel Access Control System. The key details are:
The solicitation is for the purchase and installation of a Lenel access control system at the WARF facility on Eglin Air Force Base. It includes the installation of card readers, door contacts, REX devices, controllers, and integration with the existing Lenel server. The government will provide junction boxes and pathways by August 21st. The solicitation references specific Lenel equipment to be installed, including LNL4420 controllers and LNL1320 dual reader controllers. The access control system is for 5 doors, with 3 doors designated as SCIF areas with read-in only configuration. The government has provided drawings showing the card reader, controller, and power supply locations. Responses to technical questions provide additional details on the system requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase & Installation of Lenel Access Control System
Q1. Please clarify if the REX device is to be a wall mounted PIR mounted above the door frame or a wall mounted push button?
A1.Solicitation Amendment 2 incorporates document "Access Control for WARF from RTA_Drawings Page T-604" which shows wall mounting information.
Q2. All five door locations appear to be missing electrical junction boxes, either above the doors for mounting a PIR REX or besides the door for a wall mounted push button. Please confirm if these will be provided by others (Government)?
A2. All locations will have junction boxes installed by August 23rd and they will be located above the doors.
Q3. Room 113 RF Lab Entry Door appears to be missing a junction box for the card reader.
Please confirm if this will be provided by others(Government)?
A3. The junction box will be installed by August 23rd.
Q4. Room 114 Algorithm Lab Entry Door appears to be missing a junction box for the card reader. Please confirm if this will be provided by others (Government)?
A4. The junction box will be installed by August 23rd.
Q5. Is it possible to be provided a drawing showing the card reader locations and the controller & power supply locations? I believe the building construction bid documents sheet T101 may already show these locations?
Q6. Can a data sheet for the door locking hardware provided by others be provided?
A5. Solicitation Amendment 2 incorporates document "Card Reader and Control Panel Locations WARF T101" which shows card reader,controller, and power supply information.
A6. Solicitation Amendment 2 incorporates document "Access Control for WARF from RTA_Drawings Page T-604" which shows wall mounting information.
Q7. Is there a particular Lenel server specified? A7. IAW Solicitation Amendment 2, in the Scope of Work listed in the Statement of Work, (1) LNL4420 intelligent controller, (2) LNL1320 dual reader controllers will be installed and programmed to the existing Lenel server in bldg 13 on Eglin AFB to accept the new controllers and door configuration settings.
Q8. For the SCIF area, are these doors read in-out or readers on each side of those (3) doors?
A8. These 3 doors are read-in only with the reader on the outside (unsecured side) of each door, IAW the Scope of Work in the SOW.
Q9. Are we providing the card readers and is there a model for those?
A9. IAW Solicitation Amendment 2, in the Scope of Work listed in the Statement of Work, One (1) HID PIV Class reader with keypad with (1) recess mounted door contact, (1) REX device each shall be installed on the unsecured side of each of the following doors listed in the Scope of Work.
Q10. Will all pathways be in place? A10. Yes, all pathways are in place as of August 21st.
Q11. Can you please provide a set of plans for the access control and a door hardware schedule?
A11. Solicitation Amendment 2 incorporates documents "Card Reader and Control Panel Locations WARF T101" and "WARF Door Hardware"which shows Access Control Plans and Door Hardware.
Q12. In which room will the dedicated pathway be in and what date will it need to be available?
A12. A dedicated pathway originating from the electrical room to the back concrete wall (opposite the door from the outside) will be installed by August 21st.
August 21st, 2024
1616778605A Cross-Out
1616778605A Cross-Out
Purchase & Installation of Lenel Access Control System