This solicitation requests design-build services for a secondary power project at Eglin Air Force Base. Key requirements include installing a new 1,200A panelboard fed from an existing 500kVA transformer, providing new metering and conduit, mounting equipment on a new support structure, and installing a 600A manual transfer switch. Offerors must submit pricing using the 50 Division Cost Estimate worksheet by June 28, 2022. The government will evaluate proposals based on technical approach and price. The period of performance is 238 days after notice to proceed.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R-0011 Questions as of 6-21-2022 Page 1
# Question Answer
Is the system intended to operate as shown in A or B?
a. Note that In "A" the MTS is applied before the panel and can therefore carry the entire panel
b. Note that in "B" the MTS is applied onto the 600A load breaker and can therefore carry any loads that the 600A breaker would feed.
c. The Statement of Work seems to indicate that what you prefer is shown in figure B but we wanted to check to be sure.
Figure 1A Figure 1B
Question 1--The MTS is to be configured as shown and noted in "1a." (The MTS shall be positioned upstream of the new 1,200A panelboard thereby feeding the new 1,200A panelboard..)
We noticed on site that the existing panelboard feeds 16 loads. The new panelboard is being specified to feed only one (1) 600A 3-pole breaker and five (5) 225A 3-pole breakers. Do we need to supply breakers to feed all sixteen loads or only the breakers specified in the Statement of Work document?
Question 2--Provide the new breakers as stated in the SOW. The new 600A breaker will feed the existing circuits that are fed from the existing 600A panelboard, which shall be fastened to the new support structure referenced in the SOW.
The intent is for the existing 600A panelboard to be removed from the existing support structure and fastened to the new support structure without altering the branch circuit wiring and conduit associated with the existing 600A panelboard.
During the site walk, a mention was made about the installation of a generator connection box for easy disconnection of the generator power cables. The SOW indicates that the existing cables are to be reconnected directly to the new transfer switch without a connection box. Can this be confirmed?
Reconnect the existing cables to the new transfer switch.
4 The SOW defines this as a Design-Build project. With all elements of the project being well defined in the SOW, will there be a requirement for engineered drawings and specifications?
No
The SOW details the requirements for the metering equipment to be installed but does not specify where the meter is to be installed. Can the meter be installed beside the transformer on the north side?
Yes
With the lead time for the Eglin specific meters being up to 8 months, would a temporary non-wireless meter be acceptable to use if the Eglin specific wireless meter cannot arrive before the contract completion date?
As stated in the SOW, contact Mike Bass (850-882-4621) regarding metering requirements.
7 In regards to the wireless meter, will any additional equipment be required to be installed in order to connect the meter to the base network due to the jobsite being in a remote location?
As stated in the SOW, contact Mike Bass (850-882-4621) regarding metering requirements.