Attachment L3 Past Perf Information Sheets.pdf

PDF 223 KB Posted

Attached to
Secondary Power C-61
Solicitation number
FA2823-22-R-0011
Issued by

About this file

This solicitation requests proposals for a secondary power project at Eglin Air Force Base. Offerors must provide routing of electrical service from a 500 kVA pad-mounted transformer to a new 1,200A panelboard, including a new meter, conduits, wiring, panelboard, manual transfer switch, and support structure. The project also requires removal of an existing disconnect switch and support structure. Proposals are due by 08:00 AM Central Time on an unspecified date and the period of performance is 238 days after notice to proceed. Offerors must utilize the provided 50 Division Cost Estimate worksheet to break out pricing by specification division with sufficient detail of material, labor, and other costs. The Department of the Air Force Materiel Command Test Center is the contracting agency.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION L– INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

SECTION L

Attachment L3

ATTACHMENT L3

Past Performance Information

1. Company/Division Name:

2. Product/Service and Program Title:

3. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions:

4. Contracting Agency/Customer:

5. Contract or Task Order Number:

6. A brief discussion of the contract and a description of the relevance to the effort being proposed: (see section M, table 2)

7. Address any technical (or other) area about this contract considered unique:

8. Type of Contract:

9. Period of Performance:

10. Original Contract Dollar Value (including all options) and Final (or Current Estimated) Dollar Value, and brief description of reason for difference:

11. Original Completion Date and Current Completion Date and brief description of reason for difference:

12. Name, address, fax, and telephone number of current (or last, if contract has been completed) Government PCO, Program Director/Manager and ACO. Offerors are encouraged to ensure the correct phone numbers, fax numbers, and addresses are provided for the listed points of contact (POCs):

13. Comments regarding compliance with contract terms and conditions:

14. Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions:

1009522391C Cross-Out

File details come from the government source that posted it. Updated .