This document contains questions and answers related to a solicitation for HVAC service for tenant units at Eglin Air Force Base. Key details include that the solicitation is for preventative maintenance and repair of HVAC equipment, with the contractor responsible for providing all necessary parts, filters, refrigerant, and responding to service calls 24/7/365. The incumbent contractor is Star Service but the solicitation is open to all vendors meeting the requirements. Historical service data is not available as this is a new requirement. Spare parts are not provided by the government. The contractor must schedule all maintenance and coordinate any necessary work permits with building points of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 11 - PWS 14 Feb 22.pdf | ||
| Solicitation Amendment FA282322Q00040003 SF 30.pdf | ||
| Attachment 12 - Last question for HVAC Solicitation.pdf | ||
| Attachment 11 - PWS 14 Feb 22.pdf | ||
| Attachment 10 - HVAC Site Visit - 1 Feb 22.pdf | ||
| trailer 1.pdf | ||
| trailer 4.pdf | ||
| Solicitation Amendment 2 FA282322Q00040002 SF 30.pdf | ||
| trailer 3.pdf | ||
| trailer 2.pdf | ||
| trailer 6.pdf | ||
| Attachment 8 - Updated PWS 3 Feb 22.pdf | ||
| Attachment 9 - Amended Addendum FAR 52 212-1 and -3.pdf | ||
| trailer 5.pdf | ||
| SVL HVAC.pdf | ||
| Solicitation Amendment FA282322Q00040001 SF 30.pdf | ||
| Base Access Memo.pdf | ||
| Attachment 1 - PWS.pdf | ||
| Attachment 2 - WD.pdf | ||
| Attachment 3 - Addendum to FAR 52 212-1 and -3.pdf | ||
| Attachment 5 - Fillable Reps and Certs.pdf | ||
| Attachment 4 - Addendum to FAR 52 212-2.pdf | ||
| Attachment 6 - Cover Sheet.pdf | ||
| Solicitation - FA282322Q0004.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from the Contractors
Question:
1. How do we maintain and verify equipment in the Connex? Is their power hookup? How do we run systems to verify operations?
Answer: The equipment in the Connex would be moved into the building for testing and operation. We would require coordination with the building POC at least 3 days before the inspection so we can move the equipment into the building.
Question:
2. How does access and scheduling work for maintenance?
Answer: Some maintenance may require work to be halted in the respective building, maintenance times will need to be scheduled in advance. A POC for each building will be given and all maintenance work will be scheduled through them.
Question:
3. What’s the procedure for getting hot work permits? For soldering, braising, disabling smoke detection, etc.
Answer: A POC for each building will be given. He/she will be responsible for coordinating any hot work permits necessary. 1 week in advance requested for any job requiring disabling smoke detectors so we can coordinate.
Question:
4. How does access and scheduling work for maintenance?
Answer: Some maintenance may require work to be halted in the respective building, maintenance times will need to be scheduled in advance. A POC for each building will be given and all maintenance work will be scheduled through them.
Question:
5. On the portable coolers. Are rubber flexible hoses and filters for coolant or water included?
Answer: Contractor would be responsible for flexible hoses and filters. See 1.4 and 5.4.1 of PWS “The Contractor shall repair or replace worn or failed components and parts covered under this agreement necessary to keep the system(s) in efficient operating condition at no additional expense to ACC tenant units at Eglin AFB”
6. Is refrigerant covered?
Answer: The contractor would need to provide refrigerant. See PWS paragraph 1.4 and sections 5.1-5.4
Question:
7. It was identified during the site visit there may have been some equipment that was not on the original list. Do you know if there will be a finalized equipment list provided?
Answer: There were some items which were found not to be up to date on the Equipment list/PWS. A Solicitation Amendment is pending and will address all required issues.
Question:
8. We understand the RFP requires a Firm Fixed Price (FFP) for all labor and materials for
Basic Preventative Maintenance tasks. Does the RFP also require the FFP to include all costs for all required parts (such as compressors, circuit boards, motors, bearings, blower wheels and shafts), air filters (quarterly?), labor and "on-call" service 24 hours/7 days/365 days?
Answer: See 1.4 and 5.4.1 of PWS “The Contractor shall repair or replace worn or failed components and parts covered under this agreement necessary to keep the system(s) in efficient operating condition at no additional expense to ACC tenant units at Eglin AFB”
Question:
9. There were a number of items of equipment that were shown on the tour, but not reflected in Attachment 4 – System Inventories. Will the Government issue an updated list? See the CLINS noted below.
CLIN001
Location Qty Description 614 5 Condensers for Vertiv/Liebert units
CLIN004
Location Qty Description 653 1 Vertiv DS unit
Answer: There were some items which were found not to be up to date on the Equipment List /PWS. The Solicitation Amendment addresses all required issues including the equipment mentioned.
10. Will the Government provide bidders with data on historical service calls for non-routine maintenance and repairs for the equipment? e.g., number of requests, by location & equipment if available.
Answer: This is a new requirement for HVAC services Question:
11. Does the Government maintain any critical spare parts on site for any of the systems?
Answer: We do not maintain critical spare parts on site. The contractor would be responsible for providing all necessary spare parts. See 1.4 and 5.4.1 of PWS “The Contractor shall repair or replace worn or failed components and parts covered under this agreement necessary to keep the system(s) in efficient operating condition at no additional expense to ACC tenant units at Eglin
AFB.”
Question:
12. Is there an incumbent currently working this contract? If so, can you provide their name, and if they can bid on this solicitation?
Answer: Yes, some of the buildings already have HVAC service and Star Service currently has the contract for the 53rd EWS This is a new requirement for HVAC services and is open to all vendors that meet the requirements listed in the Addendum to FAR 52.212-1/3.
Question:
13. What is the contract number and cost of the current contract for these services?
Answer: This is a new requirement for HVAC services. There is not an awarded contract yet
Question:
14. Can you please expand the number of pages for Part III, Technical Capability, of this this submission to 10 pages. This will allow a more thorough description of the offeror capabilities.
1415/Pod Trailer #01Z10481T Bard WL602-B09 154M011684764-02 1415/Pod Trailer #01Z10481T Bard WA602-B09XXXXXJ 154M011684765-02 1415/F-15 Trailer #02Z10482T Bard WA602-B09XXXXXJ 154J031828688-02 1415/F-15 Trailer #02Z10482T Bard WA602-B09XXXXXJ 154J031828690-02
Answer: Yes for this requirement the offeror can submit up to 10 pages IAW attachment 9 addendum FAR 52 212-1/3.
Question:
15. Have the items that were found to be in error or missing in the PWS been added?
Answer: IAW updated PWS 3 Feb 22, Attachment 4; here are the first 4 items on CLIN 2 of the checklist:
8.