FA2823-17-R-4000_Amendment_0003.docx.pdf

PDF 22 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Eglin AFB
Solicitation number
FA2823-17-R-4000
Issued by

About this file

Amendment 0003 dated 17 May 2017

View the file

Other files

File Type Posted
FA2823-17-R-4000_Amendment_0008.pdf PDF
FA2823-17-R-4000_Amendment_0007.pdf PDF
FA2823-17-R-4000_Amendment_0006.pdf.pdf PDF
FA2823-17-R-4000-0005_Amendment_0005.docx.pdf PDF
FA2823-17-R-4000_Amendment_0004.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
FA2823-17-R-4000-0002_Amendment_0002.pdf PDF
FA2823-17-R-4000_Amendment_0001.pdf PDF
Attach_H_-_SOW_Attachment_7.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
Attach_W_-_SABER_Construction_Cost_Estimate.xlsx XLSX spreadsheet
Attach_F_-_SOW_Attachment_5.pdf PDF
Attach_M_-_SOW_Attachment_12.pdf PDF
Attach_S_-_Gulf_WDs.pdf PDF
Attach_K_-_SOW_Attachment_10.pdf PDF
Attach_E_-_SOW_Attachment_4.pdf PDF
Attach_O_-_Pricing_Schedule.xlsx XLSX spreadsheet
Attach_P_-_Okaloosa_WDs.pdf PDF
Attach_X_-_SABER_Historical_Data.xlsx XLSX spreadsheet
Attach_U_-_Past_Performance_Questionnaire.pdf PDF
Attach_D_-_SOW_Attachment_3.pdf PDF
Attach_Q_-_Walton_WDs.pdf PDF
Attach_R_-_Santa_Rosa_WDs.pdf PDF
Attach_C_-_SOW_Attachment_2.pdf PDF
Attach_J_-_SOW_Attachment_9.pdf PDF
Attach_I_-_SOW_Attachment_8.pdf PDF
Attach_T_-_Past_Performance_Information.pdf PDF
Attach_B_-_SOW_Attachment_1.pdf PDF
Attach_G_-_SOW_Attachment_6.pdf PDF
FA2823-R-4000_SABER_IDIQ.pdf PDF
Attach_N_-_Eglin_Specific_Contract_Language.pdf PDF
Attach_V_-_Demonstration_Project_SOO.pdf PDF
Attach_L_-_SOW_Attachment_11.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to revise Attachment A - SABER Master Statement of Work (SOW) paragraph 5.1. The new Attachment A - SABER Master SOW is dated 17 May 2017 and is referenced under the revised Section J - List of Attachments. Any reference to e4Clicks Premier Project Estimator has been replaced w ith e4Clicks Professional Project Estimator.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2823-17-R-4000

X 9B. DATED (SEE ITEM 11)

10-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-May-2017

CODE

AFTC/PZIO EGLIN - FA2823

308 WEST D AVE. BLDG 260 STE 130

EGLIN AFB FL 32542-5418

FA2823 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA2823-17-R-4000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

PART III- LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Attachment Title Date A SABER Master Statement of Work

(SOW)

17 May 2017

B SABER SOW Attachment 1 – Safety & Health

01 August 2016

C SABER SOW Attachment 2 – Cable Installation Specifications

11 August 2014

D SABER SOW Attachment 3 – UFGS Table of Contents

November 2016

E SABER SOW Attachment 4 – Fire Alarm Systems

March 2016

F SABER SOW Attachment 5 - SCIF 10 September 2015 G SABER SOW Attachment 6 –

Architectural Compatibility Plan

H SABER SOW Attachment 7 – Hazardous Waste Management

22 April 2015

I SABER SOW Attachment 8 – AAC 32-3 (Asbestos)

April 2015

J SABER SOW Attachment 9 – AAC 32-4 (Lead Based Paint)

September 2015

K SABER SOW Attachment 10 – AFCOLS Custodial Standards

No Date

L SABER SOW Attachment 11 – AFCOLS Grounds Maintenance

No Date

M SABER SOW Attachment 12 – Air Force Grounds Maintenance Standards

No Date

N Eglin Specific Construction Language No Date O Pricing Schedule No Date P Wage Determinations (Okaloosa)

Nos 170262; 170119; 170222 03 February 2017;

06 January 2017’ 06 January 2017

Q Wage Determinations (Walton) Nos 170276; 170094; 170194

03 February 2017;

06 January 2017;

06 January 2017

R Wage Determinations (Santa Rosa) Nos 170269; 170126; 170229

03 February 2017;

06 January 2017;

06 January 2017

FA2823-17-R-4000

S Wage Determinations (Gulf) Nos 170005; 170081; 170197

10 February 2017;

06 January 2017;

06 January 2017

T Past Performance Information No Date U Past Performance Questionnaire No Date V Demonstration Project SOO 06 January 2017 W SABER Construction Cost Estimate No Date X SABER Historical Data No Date

(End of Summary of Changes)

File details come from the government source that posted it. Updated .