Attach_V_-_Demonstration_Project_SOO.pdf

PDF 793 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Eglin AFB
Solicitation number
FA2823-17-R-4000
Issued by

About this file

Attachment V - Demonstration Project Summary of Objectives (SOO)

View the file

Other files

File Type Posted
FA2823-17-R-4000_Amendment_0008.pdf PDF
FA2823-17-R-4000_Amendment_0007.pdf PDF
FA2823-17-R-4000_Amendment_0006.pdf.pdf PDF
FA2823-17-R-4000-0005_Amendment_0005.docx.pdf PDF
FA2823-17-R-4000_Amendment_0004.pdf PDF
FA2823-17-R-4000_Amendment_0003.docx.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
FA2823-17-R-4000-0002_Amendment_0002.pdf PDF
FA2823-17-R-4000_Amendment_0001.pdf PDF
Attach_H_-_SOW_Attachment_7.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
Attach_W_-_SABER_Construction_Cost_Estimate.xlsx XLSX spreadsheet
Attach_F_-_SOW_Attachment_5.pdf PDF
Attach_M_-_SOW_Attachment_12.pdf PDF
Attach_S_-_Gulf_WDs.pdf PDF
Attach_K_-_SOW_Attachment_10.pdf PDF
Attach_E_-_SOW_Attachment_4.pdf PDF
Attach_O_-_Pricing_Schedule.xlsx XLSX spreadsheet
Attach_P_-_Okaloosa_WDs.pdf PDF
Attach_X_-_SABER_Historical_Data.xlsx XLSX spreadsheet
Attach_U_-_Past_Performance_Questionnaire.pdf PDF
Attach_D_-_SOW_Attachment_3.pdf PDF
Attach_Q_-_Walton_WDs.pdf PDF
Attach_R_-_Santa_Rosa_WDs.pdf PDF
Attach_C_-_SOW_Attachment_2.pdf PDF
Attach_J_-_SOW_Attachment_9.pdf PDF
Attach_I_-_SOW_Attachment_8.pdf PDF
Attach_T_-_Past_Performance_Information.pdf PDF
Attach_B_-_SOW_Attachment_1.pdf PDF
Attach_G_-_SOW_Attachment_6.pdf PDF
FA2823-R-4000_SABER_IDIQ.pdf PDF
Attach_N_-_Eglin_Specific_Contract_Language.pdf PDF
Attach_L_-_SOW_Attachment_11.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 96TH TEST WING (AFMC)

EGLIN AIR FORCE BASE FLORIDA

STATEMENT OF OBJECTIVES (SOO)

Contract #: FA2823-17

Project #: FTFA17-1014

Project Title: Replace Kitchen Cabinets Bldg 107 Fire Station# 1

Date: 06 Jan 2017

SUMMARY OF WORK

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a

Statement of Objectives (SOO) for the above mentioned project. This document does not replace any of the provisions or requirements of the Simplified Acquisition of Base

Engineering Requirements (SABER) contract to include SABER Statement of Work and specifications. The provisions of this section apply to this task order only, and the Contractor shall ensure that they, their personnel and subcontractors completely understand these provisions before developing the detailed statement of work and commencing work on this task order. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB. The Contractor’s proposal shall be submitted to the CO in accordance with paragraph 3.3.2. Contractor’s Statement of Work (SOW) package.

2. PROJECT SCOPE: The project is located at Building 107 Fire Station# 1 Eglin Air Force

Base. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this task order in accordance with the contract requirements. Demo dispose and replace Kitchen cabinets, IAW the UFC and applicable industry standards. The Contractor shall perform all investigative and design services necessary to estimate and complete this project by all applicable codes.

3. EXISTING CONDITIONS: Existing kitchen cabinets are approximately 15 years old with severe wear and tear. Cabinets have missing, broken and misaligned doors with portions of particle board falling apart.

4. PRINCIPAL FEATURES: Principal features of work are as follows:

A. STRUCTURAL: Contractor shall place protective barriers on floors. Contractor shall remove, dispose and replace the following with new: Double bowl stainless steel sink, faucet, double base cabinet, 2 ea. 12” base cabinet drawer-door combo, 4 ea. wall mounted cabinets with valance countertop and backsplash on the left side of the kitchen; 2 ea. 30” 2 drawer-double door base cabinet, countertop, backsplash, 2 ea. 24” wall mounted cabinets with cubbies for microwaves on the right side of the stove; 1 ea. 78” island and countertop with multiple drawers and doors; 1 ea. 24”x15” wall mounted cabinet, 27”x30” wall mounted cabinet, 2 ea. 25” base cabinets, bar sink, countertop and backsplash in kitchen recess. Work cannot begin until a Base Civil Engineer Work Clearance Request (Air Force

Form 103) has been fully accomplished. Work Clearance Request remain effective for 30 days and must be kept current by the contractor.

B. ELECTRICAL/MECHANICAL: Contractor shall remove garbage disposals and replace with new.

C. PLUMBING: Contractor will replace 2ea exiting “P” traps with new “P” traps and appropriate plumbing components.

D. FINISHES: Contractor shall patch and paint walls as needed to match existing.

E. FIRE PROTECTION and LIFE SAFETY: The Contractor is expected to maintain, at all times, good and accepted construction practices and comply with OSHA safety standards.

1) All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

2) Design and installation must meet all UFC 3-600-01 and applicable NFPA Standards.

5. MISHAP NOTIFICATION REQUIREMENTS for CONTRACTORS: Per AFI 91-204, para

2.4.5, The Contractor shall notify the 96TW Safety Office telephonically within one (1) hour after initial notification of all mishaps or incidents involving damage to DoD property (material plus labor) or injuries to Government personnel as a result of contractor operations. The Safety

Office can be reached at (850) 882-2540 extension 4 during duty hours and (850) 883-4020 after hours. Initial written confirmation of the mishap must be forwarded within three (3) calendar days to the CO who will forward the report to 96 TW/SEG (Safety Office). A complete report shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a) Contract, Contract Number, Name and Title of Person(s) Reporting

b) Date, Time and exact location of accident/incident

c) Brief Narrative of accident/incident (Events leading to accident/incident)

d) Cause of accident/incident, if known

e) Estimated cost of accident/incident (material and labor to repair/replace)

f) Nomenclature of equipment and personnel involved in accident/incident

g) Corrective actions (taken or proposed)

The Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the 96TW Safety Office. The

Contractor and subcontractors (if involved) shall cooperate fully and assist the Government personnel during the investigation.

6. SUBCONTRACTORS: (AFI 91-204, para 2.4.6.1) The prime Contractor performing work on any property associated with Eglin Air Force Base, FL shall include a clause in all contracts requiring the subcontractors to comply with the safety provisions of this contract. This requirement also applies to the Contractor's suppliers, vendors and visitors while working on an Air Force Installation.

7. EGRESS: Means of egress shall be continuously maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency per NFPA 101, chap 7 and AFI 91-203, para 7.2.1.2.

8. REQUIRED DRAWINGS: N/A

9. ATTACHMENT: See below

10. RECOMMENDED PERFORMANCE PERIOD: 60 calendar days

//signed//

RICKEY WHITFIELD, Civ

SABER Project Manager