Attach_B_-_SOW_Attachment_1.pdf

PDF 166 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Eglin AFB
Solicitation number
FA2823-17-R-4000
Issued by

About this file

Attachment B (SOW Attachment 1)

View the file

Other files

File Type Posted
FA2823-17-R-4000_Amendment_0008.pdf PDF
FA2823-17-R-4000_Amendment_0007.pdf PDF
FA2823-17-R-4000_Amendment_0006.pdf.pdf PDF
FA2823-17-R-4000-0005_Amendment_0005.docx.pdf PDF
FA2823-17-R-4000_Amendment_0004.pdf PDF
FA2823-17-R-4000_Amendment_0003.docx.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
FA2823-17-R-4000-0002_Amendment_0002.pdf PDF
FA2823-17-R-4000_Amendment_0001.pdf PDF
Attach_H_-_SOW_Attachment_7.pdf PDF
Attach_A_-_SABER_Master_SOW.pdf PDF
Attach_W_-_SABER_Construction_Cost_Estimate.xlsx XLSX spreadsheet
Attach_F_-_SOW_Attachment_5.pdf PDF
Attach_M_-_SOW_Attachment_12.pdf PDF
Attach_S_-_Gulf_WDs.pdf PDF
Attach_K_-_SOW_Attachment_10.pdf PDF
Attach_E_-_SOW_Attachment_4.pdf PDF
Attach_O_-_Pricing_Schedule.xlsx XLSX spreadsheet
Attach_P_-_Okaloosa_WDs.pdf PDF
Attach_X_-_SABER_Historical_Data.xlsx XLSX spreadsheet
Attach_U_-_Past_Performance_Questionnaire.pdf PDF
Attach_D_-_SOW_Attachment_3.pdf PDF
Attach_Q_-_Walton_WDs.pdf PDF
Attach_R_-_Santa_Rosa_WDs.pdf PDF
Attach_C_-_SOW_Attachment_2.pdf PDF
Attach_J_-_SOW_Attachment_9.pdf PDF
Attach_I_-_SOW_Attachment_8.pdf PDF
Attach_T_-_Past_Performance_Information.pdf PDF
Attach_G_-_SOW_Attachment_6.pdf PDF
FA2823-R-4000_SABER_IDIQ.pdf PDF
Attach_N_-_Eglin_Specific_Contract_Language.pdf PDF
Attach_V_-_Demonstration_Project_SOO.pdf PDF
Attach_L_-_SOW_Attachment_11.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRIAL SAFETY AND HEALTH REQUIREMENTS

For

SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS

(SABER)

1 Aug 16

Prepared by 96 TW/SEG

1. The contractor must develop and submit a site-specific Safety and Health Plan that addresses in detail the items listed below prior to commence of work. The contracting officer will forward the contractor’s plan to the 96 TW

Safety Office for review. The company’s specific processes and procedures must be included in the safety plan.

Referencing the company's local procedure/document in the Safety and Health Plan is not adequate. If the company’s procedures are not attached, the submitted Safety Plan will be returned NOT ACCEPTED by the government.

2. Contractor Employees: Contractor employees must comply with all state, federal and local regulations, Occupational Safety and Health Administration (OSHA) standards, Air Force Instructions and Corps of Engineers

Safety Manual (EM 385-1-1) while working on an Air Force Installation/property. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages. The contractor will identify a person (by name and phone number) who will be the primary point of contact for safety and health issues for the on-site operation.

3. Mishap Notification Procedures per AFI 91-204, para 2.4.5: Site-specific mishap notification procedures must be part of the contractor's safety plan. The following notification procedures must be incorporated into the contractor's safety plan and followed upon mishap occurrence:

The contractor shall notify the 96 TW Safety Office telephonically within one (1) hour after initial notification of all mishaps or incidents involving damage to DoD property (material plus labor) or injuries to government personnel as a result of contractor operations. The safety office can be reached at (850)-882-2540 extension 4 during duty hours and (850)-883-4020 after hours. The contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the 96TW Safety Office. The contractor and subcontractors (if involved) shall cooperate fully and assist the government personnel until the investigation is finalized. Initial written confirmation of the mishap must be forwarded within three calendar days to the

Contracting Officer (CO) who will forward the report to 96 TW/SEG (Safety Office). A complete report shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a) Contract, Contract Number, Name and Title of Person(s) Reporting

b) Date, Time and exact location of accident/incident

c) Brief Narrative of accident/incident (Events leading to accident/incident)

d) Cause of accident/incident, if known

e) Estimated cost of accident/incident (material and labor to repair/replace)

f) Nomenclature of equipment and personnel involved in accident/incident

g) Corrective actions (taken or proposed)

4. Subcontractors: (AFI 91-204, para 2.4.6.1) The prime contractor performing work on Eglin Air Force Base, FL shall include a clause in all contracts requiring the subcontractors to comply with the safety provisions of this contract. This requirement also applies to the contractor's suppliers, vendors and visitors while working on an Air

Force Installation.

5. Foreign Object Damage (FOD) – Awareness, Prevention and Responsibilities: AFI 21-101, Aircraft and

Equipment Maintenance Management, 21 May 15, paragraph 11.8: If work is being accomplished on the flightline, the contractor shall establish a written FOD program and integrate it into the day-to-day operations to reduce/ eliminate FOD incidents IAW reference above. The written program must address: FOD check inspections, proper storage and handling of material, housekeeping, and accountability of tools/hardware. The contractor will brief their personnel at least weekly on FOD requirements. All contractors, subcontractors performing maintenance in a FOD– potential area will receive and have documented initial FOD Awareness and Prevention training.

6. Walking-Working Surfaces - Egress: Contractor cannot use hallways/corridor as storage or phase staging.

Material storage must be coordinated prior to any work being done. Means of egress shall be continuously maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency per

NFPA 101, chap 7 and AFI 91-203, para 7.2.1.2. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls must be in place to minimize tripping hazards, the accumulation of flammable/ combustible materials, etc. Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.

7. Scaffolding: Contractor shall comply with the requirements listed in 29 CFR 1926, Subpart L. Scaffolds are used for persons engaged in work that cannot be done safely from the ground or from solid construction. A competent and qualified person must be on site to make decisions on scaffolding operations. Contractor’s Safety

Plan shall address the specific type of equipment that will be utilized under this contract, training and competent person responsibilities.

8. Aerial Lift Devices: Contractors operating aerial lift devices shall comply with the requirements in 29 CFR

1926.453 and ANSI 92.2, Standards for "Vehicle Mounted Elevating and Rotating Work Platforms. Contractors, subcontractors, or commercial delivery companies will comply with the following requirements when operating any type of aerial lift on a DOD installation/property. Aerial lifts shall be serviceable and all safety devices, warning devices and interlocks operable at all times. Manufacturer’s operator manuals will be maintained on the aerial lifts during operation. The operator will be trained and certified on the model in which he/she will operate and provide visual certification upon request. Aerial lifts will not be used to deliver employees to higher levels unless so certified. Contractor’s safety plan must address aerial lift training, fall protection equipment/training/storage and all personal protective equipment required to be used for lifting device.

9. Fall Protection: 29 CFR 1926.500-503, Subpart M. During the life of this contract, if a worker can fall six feet or more, fall protection will be provided to prevent injury. Contractor’s Safety Plan shall address the applicable fall protection system that will be utilized during this contract such as: guardrail system (height and load rating), safety net system (location, inspection, and testing), Personal Fall Arrest System (PFAS) (life line, lanyard, component strength, anchorage), fall protection plan, training and qualification documentation of personnel.

10. Confined Space Entry: The contractor’s permit-required confined space entry plan must be in accordance with

29 CFR 1910.146 and AFI 91-203, chap 23. Contact 96 TW Safety Office at (850)882-2540 extension 4 for specific confined space briefing and to coordinate confined space entry plan/operations prior to commencement of work, no exceptions! Safety plan must address employee training, provide list of confined space equipment, rescue procedures and identify name of rescue team.

11. Hazardous Communications: Contractor must establish and maintain an effective hazardous communication program that meets the requirements of 29 CFR 1910.1200. Ensure hazards of all chemicals produced or imported are classified and information concerning the hazards and protective measures are transmitted to employees.

Contractor’s Safety Plan shall address at a minimum:

-Written Program-list of hazardous chemicals

-Identify the hazardous chemical(s) and labeling system

-MSDS data sheet location

-Training-methods used to inform employees of the hazards and precautionary measures http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10916 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10754 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10754 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10099

12. Inclement/Severe Weather Plan: Contractor shall develop and comply with the inclement weather requirements listed in EM 385-1-1, para 01.E. Contractor’s Safety Plan shall explain the procedures that will be used by personnel during inclement and severe weather (i.e., how notification is received for lightning/tornado; what employees must do once notification is received (where they go to take cover) etc.).

13. Material Handling Equipment (MHE): Only trained and qualified personnel will be allowed to operate mobile/overhead cranes, hoist, and forklifts. All MHE and associated components will be inspected for damage or wear. Contractor shall comply with the requirements in 29 CFR 1926, Subpart H, Subpart N, and 29 CFR 1910.176

– 1910.184. Contractor’s Safety Plan shall address operator training/qualifications to include rigging and hand signal training, load capacities, inspections, maintenance and safe operation.

14. Personal Protective Equipment (PPE): Contractor shall comply with the requirements in 29 CFR1910.132, 134, 136 and 29 CFR 1926.28, 95, 100, 101, 102, & 951. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard (working overhead, falling objects, etc). Contractor’s Safety Plan shall also address what PPE is required and used by employees.

15. Hazardous Energy Control Program (LOCKOUT-TAGOUT): Hazardous energy must be isolated before servicing/maintenance activities began. Contractor shall comply with the requirements listed in 29 CFR 1926.417 and NFPA 70. Contractor’s Safety Plan shall address:

-Witten hazardous energy control program

-Employee training

-Lockout/tagout procedures-

-Verification of De-energized equipment

-Periodic inspections

-Removal of locks and tags

-Restoring equipment to normal operations

-Arc Flash

16. Hand and Portable Powered Tools and Other Hand-held Equipment - 29 CFR 1926.300: Hand and power tools shall be used, inspected and maintained in accordance with the manufacturer’s instructions and be used only for the purpose for which is was designed. All tools designed to accommodate guards shall be equipped with the guards. The use of unsafe hand and power tools are prohibited. All receptacle outlets that provide temporary electrical power to portable electrical hand tools or semi-portable electric power tools shall have ground-fault circuit interrupter (GFCI) protection. Contractor’s Safety Plan shall address training, tool inspections, proper use, and guarding requirements.

17. Excavation and Trenching: Trenching and excavation work creates hazards which are extremely dangerous.

Employees shall not enter an unprotected trench. Every effort must be taken to protect workers during these operations. Walls and faces of excavations and trenches over five feet in depth shall be guarded by a shoring system, sloping and benching system or equivalent means and inspected daily by a component person. Contractor’s procedures for excavation and trenching shall comply with 29 CFR 1926.650 - 652. If work is to be done on Eglin

Ranges, contractor must contact the 96 TW Range Safety Office at (850)882-4000 for further instructions/guidance.

18. Protective Barriers/Warning Signs: 29 CFR 1926, Subpart G, Sections 200 – 202 and EM 385-1-1, US Army

Corps of Engineers Manual, Safety and Health Requirements. It is the contractor’s responsibility to maintain a safe and accessible path-of-travel for all pedestrians around and or through construction sites. At no time shall a contractor leave an open hole. Contractor must provide barricades in an area for excavation, open manholes, overhead work, or the protection of personnel from hazardous operations, moving equipment or cranes. Proper barricades must be used and will be determined based on hazard exposure. Barricades must be erected before the work begins and maintained for the duration. If the barricades are in a roadway or walkway, blinking lights must be used after dark. When the work is complete, the barricades must be removed from the job site.

END

http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10118 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10909 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10913