Attachment_D_SOW.pdf
PDF 213 KB Posted
- Attached to
- Repair HVAC & Interior Bldg. 3017 Federal contract opportunity
- Solicitation number
- FA2823-15-R-4020
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA2823-15-R-4020_Amendment_3.pdf | ||
| FA2823-15-R-4020_Amendment_2.pdf | ||
| FA2823-15-R-4020_Consolidated_Q_ _A_090915.pdf | ||
| FA2823-15-R-4020_Consolidated_Q_ _A_090815.pdf | ||
| HVAC_Bldg_3017_Extension.pdf | ||
| FTFA_13-9005_Site_Visit_Sign_in_Sheet.pdf | ||
| Q_ _A_PART_1.docx | DOCX document | |
| Attachment_G_WD_15R4020.pdf | ||
| Attachment_F_DRWGS_15R4020.pdf | ||
| Attachment_J_Base_Support_Letter.pdf | ||
| Attachment_C_Financial_Responsibility.docx | DOCX document | |
| Memorandum_Letter.doc | DOC document | |
| FA2823-15-R-4020_RFP_RELEASED.pdf | ||
| Attachment_E_SPECS_139005_15R4020.pdf | ||
| Attachment_I_Hold_Harmless_Agreement_Bldg_3017.pdf | ||
| Attachment_B_Past_Performance_Questionnaire.docx | DOCX document | |
| ATTACHMENT_E-Affidavit.pdf | ||
| Attachment_A_Past_Performance_References.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR CONSTRUCTION
FTFA 13-9005
Repair HVAC and Interior, Dining Hall, Bldg 3017
25 June 2015
1. GENERAL INTENTION: The Contractor shall provide construction services for the subject project as indicated in this statement of work. In general, this work will consist of HVAC system repair and serving line enlargement, and interior improvements, associated electrical work and incidental related work, as indicated on the contract documents.
2. This Statement of Work is general in nature. Refer to the contract drawings and specifications for details. The
Contractor shall furnish all parts, labor, tools, materials, plant, and transportation necessary to perform work required in this contract. Work shall be performed in accordance with the requirements and regulations set forth in the plans, specifications, and the contract documents.
3. PROJECT CONSISTS OF THE FOLLOWING WORK:
A. HVAC-Demo the existing Chiller, Air Handlers, Boiler, Pumps, and associated piping. The ductwork in the mechanical room shall be demoed and replaced: however, the ductwork outside of the mechanical room will remain and be cleaned. Hot water heating coils will be added to the existing VAV boxes associated with AHU-2. The dining room is served by AHU-1 and is a single zone unit. The four Make-Up Air Units (MAU) located on the mezzanine will be removed and replaced by two Liquid Dessicant Units (LDU) and two MAUs. The roof mounted exhaust fans will remain. EF-5 is an in-line fan that exhausts the dish and pot wash rooms and it shall be demoed and replaced.
DDC controls will be provided and integrated into Eglin’s UMCS system. Test and Balance will be required for all new and existing equipment to remain. Commissioning of new systems will be required.
B. ARCHITECTURAL-The serving line enlargement will require moving two structural columns. This will intel associated concrete slab and foundation work. The dining area and will be renovated including new tile floor, paint, and ceilings. Existing fluorescent downlights to remain, however some will be relocated. Spray foam insulation will be provided to seal top of existing masonry wall to bottom of existing metal roof deck. A roof access and platform will be provided to allow access to existing roof exhaust fans.
C. PLUMBING-New handwash stations and water fountains will be provided in the foyer area. Installing the drains will require associated concrete work.
D. ELECTRICAL-Electrical work will be required for all associated systems to be installed including fire alarm and mass notification systems. Lightning protection will be provided for the roof access platform.
4. EQUIPMENT, MATERIALS, PRODUCTS, AND SUPPLIES: All equipment, materials, products, and supplies installed in this project shall be newly manufactured of the latest version unless otherwise specified in the SOW, specifications or drawings. Replacement parts shall be standard and readily available through commercial means;
coordinated with Base Civil Engineering shops for standards and stocked items. Discontinued products will not be accepted or approved by the Contracting Officer.
5. LOCATION: The work is located at Duke Field, Eglin AFB Reservation, Florida. Reference Drawing Index T-
001, Sheet 1 of 45 for Bldg 3017 location.
STATEMENT OF WORK (SOW) (Con’t)
FOR CONSTRUCTION
FTFA 13-9005
Repair HVAC and Interior, Dining Hall, Bldg 3017
6. SITE INSPECTION: Prospective bidders are expected to visit the areas of work and verify all conditions and dimensions. A Pre-proposal site visit will be conducted as stated in the solicitation.
7. SUBMITTALS: To be discussed at the preconstruction meeting include, but are not be limited to: Project
Schedule, Shop Drawings, Material Submittals, Work permits, Utility Outage Requests, Utility Connection
Requests, Welding Permits, and Burning Permits. All submittals will be provided on a completed AF Form 3000, Material Approval Submittal and submitted to the Contract Specialist. All submittals will include all of the necessary and applicable material/equipment information required to clearly identify what is being submitted, listing any options on items, model number etc. Reference Specification Section 01 33 00, Submittal Procedures.
-The contractor is responsible for marking and verifying all utilities not marked.
8. CONFLICTS: In case of conflict between different Air Force standards or other any information herein this document, the more stringent requirement criteria and/or work-effort shall apply and take precedence.
9. PROJECT COMPLETION: Provide (1) hard copy set, and one (1) Mylar set of As-Built drawings upon completion of the construction of the project. As-builts are also to be provided in .pdf format and .dwg format
(AutoCAD). Electronic Design Deliverables are to comply with UFC 1-300-10, Electronic Design Deliverables
(EDD) Manual of Policies and Procedures.
10. COMPLETION DATE: The Period of Performance (POP) is 305 Calendar days (10 months) from the issuance of the Notice to Proceed.
----------------------------- LAST ITEM --------------------------------