Q A 1 June 2010.docx

DOCX document 16 KB Posted

Attached to
RENOVATION OF BUILDING 1306
Solicitation number
FA2823-10-R-0010
Issued by

View the file

Other files

File Type Posted
Q A 9 June 2010.docx DOCX document
Final Q A 3 June 2010.docx DOCX document
Revised Spec 02 82 16.00 20.pdf PDF
10-R-0010-0004.doc DOC document
Revised Spec 09 68 00.pdf PDF
Q A 20 May 2010.docx DOCX document
10-R-0010-0003.doc DOC document
10-R-0010-0002.doc DOC document
Q A 18 May 2010.docx DOCX document
Site Visit Minutes and Q A.pdf PDF
083904_20100511_0001.PDF PDF
10-R-0010-0001.doc DOC document
Base Access Memo.pdf PDF
Solicitation Base_Passes.xls XLS spreadsheet
EGLIN CAB Affidavit PA —
09AI Drawings 1 of 4.zip ZIP file
09AI Drawings 2 of 4.zip ZIP file
SF24 Bid Bond Sample.pdf PDF
09AI Specifications 1 of 1.pdf PDF
09AI Drawings 4 of 4.zip ZIP file
09AI Drawings 3 of 4.zip ZIP file
FA2823-10-R-0010 Solicitation.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT: FA2823-10-R-0010, FTFA083904, Renovate Building 1306, Eglin AFB, FL, Questions & Answers: 1 June 2010

1. The Legend shows the new walls as a wall having diagonal line thru it and calls out 3/A3 which is a CMU partition. However, the wall between rooms 113 and 115 call out section 2/A3 which is a metal stud partition. The door details are showing metal studs. Please clarify.

Answer: The wall between 113 and 115 should be metal stud, we apologize for the confusion. Drawing A2 will be corrected prior to resulting contract.

2. I understand the vault door at the front entrance for tight security, but why a standard H.M. door on the side of the building. Please clarify.

Answer: This door will not be used on a day to day basis. It is only used for emergency purposes with the crash door hardware on it. No hardware will be on the outside of the door. It will constantly be tied into the alarm if opened. There is no need for a vault door for that reason.

3. The project synopsis states that "That the entire facility will be constructed to sensitive compartment information facility (SCIF) security standards." Is the project to be constructed under DCID 6/9 standards?

Answer: Yes, the entire building will be built according to DCID 6/9 standards as it is an existing accredited SCIF to remain in operation.

4. Is there a TSCM assigned to the project?

Answer: No

5. Is there any additional "TEMPEST" requirements for the facility not shown on the drawings?

Answer: The following TEMPEST countermeasures are not required:

1. RF shielding

2. RF window film

3. Signal line isolators and filters

4. Power line filters

5. Non-conductive sections

6. Telephone/telecommunication signal line filters

There are no additional TEMPEST requirements at this time.

6. The door schedule calls for door No.1 (Vault door) to be 3'-4" x 7'-0", but the only approved GSA Class 5 vault door is only 3'-4" x 6'-6". For this bid, do you want the approved smaller door in this bid, or do you want the larger 7'-0" size, which is a custom size, higher price and not approved by the GSA? Also the specs call for" with optical device IIL and without an optical device H ". Please advise.

Answer: The optical device is not required. Bid the vault door as specified in the solicitation documents.