Final Q A 3 June 2010.docx
DOCX document 14 KB Posted
- Attached to
- RENOVATION OF BUILDING 1306
- Solicitation number
- FA2823-10-R-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A 9 June 2010.docx | DOCX document | |
| Revised Spec 02 82 16.00 20.pdf | ||
| 10-R-0010-0004.doc | DOC document | |
| Revised Spec 09 68 00.pdf | ||
| Q A 1 June 2010.docx | DOCX document | |
| Q A 20 May 2010.docx | DOCX document | |
| 10-R-0010-0003.doc | DOC document | |
| 10-R-0010-0002.doc | DOC document | |
| Q A 18 May 2010.docx | DOCX document | |
| Site Visit Minutes and Q A.pdf | ||
| 083904_20100511_0001.PDF | ||
| 10-R-0010-0001.doc | DOC document | |
| Base Access Memo.pdf | ||
| Solicitation Base_Passes.xls | XLS spreadsheet | |
| EGLIN CAB Affidavit PA | — | |
| 09AI Drawings 1 of 4.zip | ZIP file | |
| 09AI Drawings 2 of 4.zip | ZIP file | |
| SF24 Bid Bond Sample.pdf | ||
| 09AI Specifications 1 of 1.pdf | ||
| 09AI Drawings 4 of 4.zip | ZIP file | |
| 09AI Drawings 3 of 4.zip | ZIP file | |
| FA2823-10-R-0010 Solicitation.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT: FA2823-10-R-0010, FTFA083904, Renovate Building 1306, Eglin AFB, FL, Questions & Answers: Final Q&A, 3 June 2010
1. Drawing A3 Detail 2 A2/A/3 states "Stud tracks to be embedded in sealant (for STC rating). What is the STC rating of the partition?
Answer: For compartmentation within the SCIF, the dividing office walls must meet Sound Group 3. Sound Group 3 - STC of 45 or better. Loud speech can be faintly heard but not understood. Normal speech is unintelligible.
2. Considering the hierocracy of documents with specifications overriding others, Abatement Specification section 02 82 16 subheading 1.3.1 Description of Work indicates abatement of 7500 sq ft of mastic and 400 sq ft of tile which conflicts with the drawings and Questions & Answers for the RFP.
Answer: This is not an abatement project. Remove only asbestos when/where impacted by demo work. The specifications have been revised to delete a portion of the above statement. Please see Amendment 0004