This file is a Questions and Answers document addressing clarifications for the 3TES Furniture Room 308 solicitation at Schriever Space Force Base. The document provides 58 answered questions that clarify specifications and requirements outlined in the Statement of Work and Salient Characteristics.

Key furniture and installation specifications include: 4-foot desks on both the 4-station and 2-station walls with 30-inch depth; mesh office chairs with upholstered seats; polly shell guest chairs with metal frames, pads, and arms (no casters); benching stations with 42-inch panel heights and Frame & Tile construction; non-powered conference tables with cable access holes; fabric demountable walls with 42-inch monolithic panels and locking doors; and laminate worksurfaces. Power requirements specify 3 duplex outlets per workstation, with acceptable splitting between wall-mounted outlets and power modules. Each workstation requires one box/box/file pedestal. Storage includes kitchen-style wall cabinets for the break area and an award display case. The 75 linear feet of demountable walls will use fabric and tackable surfaces below glass elements, with no blue or grey accents or additional accessories required. Installation occurs on the third floor (10-foot ceiling, ceiling tiles) with removal of existing furniture by the contractor and disposal at contractor's expense. The contractor is responsible for power disconnections/reconnections and light removal/relocation. Installation is scheduled during normal business hours (0800-1600) in succession with furniture removal, using standard and freight elevators and the loading dock on the building's opposite side. This Small Business Set-Aside opportunity requires compliance with the Non-Manufacturer Rule for both dealer and manufacturer.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NumberQuestionAnswer
1Should we follow the statement of work or the salient characteristics as final say? The cubicle size is different in each document. Based on the room size, 4' wide would be advised for a better fit along the 4 station wall, it looks like we can accommodate the 30" deep request. We can do 5' option on the 2 station wall. Please advise.
SOW should be followed. 4' desks on the 4 station wall and the 2 station wall.
2Conference table: do you want a power hatch (non-powered table with hole for cables) or require a power module with outlets/usb?non-powered table with hole for cables
3Tables - what blue or grey accents are required? Power module?No accents required
4Walls - we are calculating closer to 75 linear feet vs 60 as noted. Quote will include fabric demountables, do you require any other surface request for pricing?No
5Chair - Mesh office chair: can this be mesh back with upholstered seat? Or is fully mesh required?Mesh back with upholstered seat is fine
6Chair - upholstered guest chair: is a polly shell with seat/back pad acceptable or does this need to be fully upholstered seat and back? Do you require casters/arms?If polly and padded is metal frame acceptable?
Can be a polly shell/metal frame with pads. Arms required, no casters.
7Cubicles - for the panel system is there a height requirement? Standard panels heights are 56", 64", 72" and 80".Benching stations with 42" pannels
8Cubicles - do you need power at the surface or at the raceway of the panels only? If at the surface a power module can be provided to account for some of the power requirements or do all 3 need to come from the panel system?Yes it is acceptable to split wall and power module outlets, as long as each desk has the required power.
9Cubicles - what grey accents are required? Desk lamp? Keyboard tray? Monitor arms? Grommet?No grey accents specifically required, no lamp, keyboard tray, or monitor arms. Yes grommet.
10Desks - for the 3 duplex outlets, those would need to be coordinated with demountable walls. We can also provide a power module with outlets mounted to the surface. Please advise if it is acceptable to split wall and power module outlets for total qty of 6 outlets.Yes it is acceptable to split wall and power module outlets, as long as each desk has the required power.
11Desks - where is blue fabric located? Do you require a tackboard with fabric? If so how many and what size?No blue fabric required for the desks, no tackboard
12Desks - what grey accents are required? Desk lamp? Keyboard tray? Monitor arms?Grommet?No grey accents specifically required, no lamp, keyboard tray, or monitor arms. Yes grommet.
13Which floor is the project located on?3rd
14Is there an elevator to use or only stairs?Standard and freight elevators
15Will the furniture be installed during normal business hours?Yes, 0800-1600
16Is there a loading dock?Yes, with freight elevator
17How far away will the furniture offload point be compared to the project location?On the first floor, opposite side of the buildng at the loading dock.
18Is there a dock available?Yes
19Is a lift gate required?No
20Is stair carry required?No
21Is there a standard elevator?No
22Is there a freight elevator?Yes
23Is the site free and clear for work?No, existing furniture needs to be removed
24Will the installation be phased?Due to the size of the project, it is expected that removal and install occur in succession with each other, without delay in between.
25Will the installation be during normal business hours?Yes, 0800-1600
26Are we responsible for removal of current furniture?Yes
27If so what are the disposition instructions?Furniture will be removed and disposed of by the contractor
28Is this requirement subject to FAR 52.219-33?Yes
29What is the ceiling type: soffit or ceiling tiles?Ceiling Tiles
30What is the ceiling height?10 feet
31Should all demountable walls be solely laminate, or should any tackable or backpainted glass elements be integrated?No backpainted glass, tackable surfaces below the glass elements
32What should the monolithic panel height be? Standard options include 42”H, 51”H, 66”H42” H
33Where are the power poles that are listed in the Salient Characteristics document going in the plan?We do not have a more accurate floor plan than what was provided. Please coordinate with the government if a site survey is required
34Does the d shaped table require any power?No
35Do the doors for the demountable walls need to be locking?Yes
36If there is specific hardware needed, please provide those specifications.No specific hardware needed
37Is veneer preferred over laminate? If cost is a driving factor, then laminate is recommended.Laminate is fine
38Can clearer dimensions be provided for the floor plan to allow for accurate placement of the demountable walls?We do not have a more accurate floor plan than what was provided. Please coordinate with the government if a site survey is required
39Are overhead cabinets required for the break area or just base cabinets?Kitchen-style wall cabinets required
40Is faux leather an acceptable alternate for the executive chair?Yes
41Will all questions/answers be released for review?Please differ to 50 CONS for this answer
42Could you please share a CAD file?Customer does not own a CAD file
43Confirm electrician is to be supplied by contractor.Yes
44Confirm data is not included in scope.Correct – however each workstation needs a port for data cable access
45Demountable Wall – What finish/material is requested?Fabric/glass
46Demountable Wall – Is it acceptable to have unpowered walls?The expectation is that each workstation has 3 duplex outlets, if this can be completed while using unpowered walls then that is fine.
47Confirm if benching system workstations are acceptable for Room 308 D.Yes
48Confirm that no storage is requested for the workstations in Room 308 D.One box/box/file pedestal per workstation in Room 308D
49Confirm that one Box/Box/File pedestal is requested per workstation for rooms 308 C, 308 B, and 308 A.Yes
50Confirm design intent for the Award Display in Room 308 A. Please share a photo of manufacturer label if available.The photo supplied below is an acceptable solution
51Are laminate worksurfaces acceptable?Laminate is fine/The photo supplied below is an acceptable solution
52Would a similar case be an acceptable solution:Yes
53Please confirm if you would like Monolithic Panels OR Frame & Tile?Frame & Tile
54Please confirm if you would like desk material to be constructed of Veneer OR Laminate? SOW states Veneer.Laminate is fine
55Please confirm who will be responsible for removing / relocating lights?The contractor will be responsible for removing/relocating lights
56Please confirm who is responsible for power disconnections & reconnections.The contractor will be responsible for power disconnections & reconnections
57Please confirm no carpet, paint or other services will be required.Correct
58As this opportunity is a Small Business Set-a-Side, can you confirm the Non-Manufacturer Rule will be followed to ensure both the Dealer and the Manufacturer are small business?Yes, the non-manufacturer rule will be followed.
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

image1.png

File details come from the government source that posted it. Updated .