PWS Carpets 50CONS 17Sep24.pdf
PDF 245 KB Posted
- Attached to
- 50 CONS Carpet on USAF Carpet Program
- Solicitation number
- FA255024Q0061
About this file
This document is a Performance Work Statement (PWS) that outlines the requirements for installing new carpeting in rooms 260, 261, and 268 in Building 210 at Schriever SFB.
The key details are: The contractor shall remove and dispose of the old carpeting and furnish and install new Mohawk QB436 Framed Structure: Color 989 Charcoal Carpet Tile in the specified rooms. The contractor shall also install new rubber base and transitions as needed. The work must be coordinated with the furniture removal and installation contractor. The estimated room sizes are provided. This requirement will be solicited on a firm fixed-price basis through the Air Force's mandatory Carpet Program, with Mohawk as the Tier I vendor and a 100% small business set-aside for the Tier II contractor (installer).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This specification document is for carpeting in building 210 for rooms 260, 261, and 268.
General Requirements:
Remove and dispose of old carpeting and furnish and install new carpeting. Relocate existing furniture as necessary to perform removal and installation of carpets, ensuring any existing furniture is placed back to original positions upon final installation effort. Statement deleted 17 Sep 24
All furniture will be removed by the government/furniture contractor prior to any carpeting work and carpeting contractor will not be moving any furniture.
Coordinate with furniture provider though the Contracting Officer to install new carpeting prior to installation of new furniture.
All of the following apply to each room except where specifically addressed.
Specifications and Specific Requirements:
1. The color carpeting shall be Mohawk QB436 Framed Structure: Color 989 Charcoal Carpet Tile.
2. The contractor shall coordinate with the Contracting Officer for a date and time for onsite inspection of work areas, noting of any peculiarities and issues that may need to be addressed; and take measurements required for actual quantities of carpet tiles along with other materials as required to complete installation.
3. The contractor shall provide all labor, tools, equipment, and materials to remove old carpeting and install new carpeting per this requirement.
4. The contractor shall remove all old carpeting and materials of old carpeting in the rooms.
5. The contractor shall dispose of all the removed carpeting and materials of old carpeting to a proper off‐base facility for the disposition of old carpeting and materials.
6. The contractor shall prepare the floors for the installation of new carpeting.
7. The contractor shall furnish and install rubber black cove base, any necessary rubber transitions, and any other materials and items needed to complete installation requirements.
8. The contractor shall furnish and install carpeting.
9. The contractor shall provide the labor to relocate existing furniture as necessary during removal of old carpets and during the installation of new carpets. Statement deleted 17 Sep 24
10. The scheduling for this requirement shall be set in coordination with the installation of new furnishings to rooms 260 and 261, so that carpet is installed after the old furniture is removed
(furniture removal is done by another contractor) and installed just prior to the installation of new furniture. All coordination action shall be worked with the Contracting Officer. Anticipated furniture install removal date is November 2024 but subject to change due to furniture lead times.
11. The furniture in room 268 will not be replaced, but simply needs to be relocated as necessary to perform old carpet removal and new carpet installation. Statement deleted 17 Sep 24
12. The contractor shall provide basic cleanup of new carpeting as necessary after installation.
13. Estimated Room Sizes based on manual measurements
Room 268: 17 x 31 = 527SqFT
Room 260: 41 x 31 = 1271SqFt
Room 261: 12 x 10.5 =126SqFt
(in Feet)
ORRIDOR
C r----------24'-2" ---------------------------------------------- j
F- 5I -4g"------1 -------- t--
13- ' 0§8_"
SOURCE SELECTION
II
I
C
-7 1 613..
r----+----------30'-7 J"------------+ ----------------------------- , lc--+-----,.L. -,H ---
BUILDING 210 FLOOR PLAN
1---+--------,,rcꞏ,cf-------< I // Ill' .r,,c---1
.fm
=D J 8 ===fi!n
-,wEc-.,.e----
- ,.t.t.-,-0 ---------------- l'ri_, Room262
NOT
INCLUDE
D)
Rm260
File details come from the government source that posted it. Updated .