This document is a set of Questions and Answers related to a federal contract opportunity, Solicitation Number FA255024Q0022, for the installation of 2-inch diameter plenum-rated conduit within Modification 12 (Mod 12) of Building 400 at the 4 SOPS facility. The contractor will be required to install new conduit and wall/floor penetrations between the second-floor cable vault, Mod 12 South server room, and seat 52 to route both black and red cables. The contract requires specific details on the conduit, wall thicknesses, rebar location, floor penetration sizes, and use of existing windows. There are no prevailing wage rates or weekly payroll reports required for this project. The agency is the Department of the Air Force Space Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FA255024Q0022 4SOPS B400 Mod12 Conduit Install
QUESTIONSDate ReceivedANSWERS
1. Can we use flexible plenum rated flexible tubing from the server room to the existing work station(s) (short distance)18-JulShall not be greater then 6' in length for transition from floor penetrations to equipment. (2.10.3)
2. Paragraph 1.1 “the contractor will install new plenum rated conduit…”. We assume this is EMT conduit with compression rated fittings. Is this correct?18-JulCorrect, (2.4.2.3). Conduit Penetration (CP). Only rigid conduit or electrical metallic tubing (EMT), as specified in this document, shall be used. CPs are used for penetrations through gypsum firewall
3. Paragraph 1.1 “The contractor will install new wall penetration…along the MOD 12 South East perimeter wall”. What is the concrete wall thickness for the penetration(s) into the utility corridor?18-JulBelieved to be 12"
4. Are x-rays required prior to wall penetrations or will the government provide acceptable locations for penetrations?18-JulYes for location of rebar. Provide this information and proposed locaiton and size of penetrations to CO for review and approval
5. Paragraph 1.5.4 – What is a “T-Badge”?18-JulTemporary Access Badge for the RA, not issued to Contractors.
6. Paragraph 1.5.4 – If the contractor is issued a “T-Badge”, what is the anticipated time-frame for badge issue?18-JulT-Badges are not issued to contractors. Anticipate V-badges for the project.
7. The description on the Solicitation document says “There is a potential to use an existing window within Room 14”. On the site visit, it was mentioned that we will not use the existing window and new hole(s) will be punched for wall penetrations. Please confirm.18-JulNew penetrations are required.
7. Is there a current Wage Determination for use with this project?18-JulNo, there is not.
8. Are weekly certified payroll reports required?18-JulNo, they are not required.
9. The directions state that we will have to provide a “window” where cables pass through walls. I need a clear definition of what will meet this requirement. Can it simply be two fire-sealed conduits of appropriate diameter?19-JulDepending on the diameter. Provide information on proposed conduit diameters to CO for review and approval.
10. A core-drill will be necessary from the server room where the conduits begin in the subfloor, would that be an issue ?19-JulPotentially. Location and sizes of the core-drills will need to be submitted to CO for reivew and approval.