Transfer_to_commercial_(with_load)_in_Manual_Mode_B600_2019.pdf

PDF 96 KB Posted

Attached to
Solicitation_GLEN_18-1101
Solicitation number
FA255019RA010
Issued by

About this file

This document contains a solicitation for a federal contract opportunity to replace three mission essential systems in a Central Utility Plant building. The 50th Civil Engineer Squadron is seeking proposals to: replace transformers and associated equipment in the transformer yard; replace eight roof mounted exhaust fans and louvers; and replace obsolete generator synchronizers, load controllers, PLC based generator controller, and generator operator HMI computer and programming. The solicitation number is FA255019RA010 and opportunity type is a solicitation from the Department of the Air Force Space Command for replacement of systems in building 600 to support mission essential power generation capabilities.

Manual Mode B600

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSFER LOAD TO UTILITY/STOP GENERATORS IN

MANUAL MODE

CENTRAL UTILITY PLANT (B600)

STEP 1: CLOSE “M”/”N” Feeder Breaker Switchgear A on U2SA/U2SA1

STEP 2: CLOSE “B” Feeder Breaker Switchgear B on U2SB

STEP 3: PLACE Utility Selector Switch to “AA” or “BB”

***NOTE: Generators will start matching with commercial power then

Breaker Control Switch 52-U2M1/52-U1M1 will CLOSE

STEP 4: LOWER MASTER IMPORT CONTROL Switch to remove power off the generators and onto utility. Once power is lower than 200kw TRIP all Breaker Control

Switches 52-G1 through 52-G7

STEP 5: PLACE all ENGINE CONTROL SWITCHES to AUTO

STEP 6: PLACE all SYNCHRONIZED LOAD SELECTOR Switches to AUTO

***NOTE: After a 5-15 minute cool down, generators will automatically shut down

STEP 7: OPEN FEEDER Breakers CB-GSB and CB-GSA/CB-GSA1

NOTIFY ATCC THAT THE BASE IS NOW ON UTILITY POWER

STEP 8: Conduct Post-OP inspection of all generators